MahaRERA Application

General Information

Other Than Individual

Organization

HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD
Company
NA
Do you have any Past Experience ?
Yes

Address Details

9-01
HDIL TOWERS
ANANT KANEKAR MARG
BANDRA(EAST)
NEAR SMALL CAUSES COURT
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400051

Organization Contact Details

02267888000
www.hdil.in

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1HDIL INDUSTRIAL PARKIndustrialNA32449BESIDES LAXMI MARBLES CHANDANSAR ROAD VILLAGE CHANDANSAR VIRAR EASTS NO 123 VILLAGE CHANDANSAR256272017-04-302017-07-25
2HDIL RESIDENCY PARKResidentialNA27149OPP YAZOO PARK NARANGI BYPASS ROAD VILLAGE DONGRE VIRAR WESTSURVEY NO 214 VILLAGE DONGRE711992011-08-012015-10-14
3GALAXY APARTMENTS WING ABEResidentialNA5974.45BHANDARY ESTATE KURLA EAST MUMBAI 40002413/1TO4,13/14B,PART OF 13/16,20,2133142011-12-312017-06-19
4PREMIER RESIDENCESOthersRESIDENTIAL AND COMMERCIAL15504.68PREMIER AUTO KURLA WEST MUMBAI - 400070637A/P,637/72P,637/44to46,637/53P,637/54P,637/73to77,637/87to90P1110872012-12-302017-03-09
5PREMIER EXOTICA IIOthersRESIDENTIAL AND COMMERCIAL2151.39PREMIER AUTO KIROL ROAD KURLA WEST MUMBAI 400070637/A-P1832013-06-302017-06-19
6HARMONYOthersRESIDENTIAL AND COMMERCIAL11549.20NEW LINK ROAD GOREGAON WEST MUMBAI 4001041A58B1APT12212013-06-302017-07-04

Member Information

Member Name Designation Photo
SARANG WADHAWAN Managing Director View Photo
SARANG RAKESH WADHAWAN Authorized Signatory View Photo

Project

PREMIER EXOTICA I
On-Going Project
30/06/2013
31/01/2021
No
Residential
No
637/AP 637/62 P637/63 637/64 637/65 63772P
D P Road
Internal Road
Sale Building No 2
Internal Road
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
PREMIER ROAD
KURLA (WEST)
400070
9074.50
6
5
1
16354.69

FSI Details

30273.49
6000.00
36273.49

Bank Details

BHARAT COOP BANK LIMITED
BCBM0000070

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 279 259 60

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 YET TO COMMENCE
Energy management : YES 0 YET TO COMMENCE
Fire Protection And Fire Safety Requirements : YES 0 YET TO COMMENCE
Electrical Meter Room, Sub-Station, Receiving Station : YES 60 WORK IN PROGRESS
Aggregate area of recreational Open Space : YES 0 COMMON RECREATIONAL SPACE IS FOR ENTIRE LAYOUT
Open Parking : NO 0 NA
Water Supply : YES 0 YET TO COMMENCE
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 95 WORK IN PROGRESS
Storm Water Drains : YES 70 WORK I N PROGRESS
Landscaping & Tree Planting : YES 0 YET TO COMMENCE
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 COMPLETED
Solid Waste Management And Disposal : YES 0 YET TO COMMENCE

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 PREMIER EXOTICA I WING - A 4 1 0 14 0 0 55
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 42.20 1 1
2 RESIDENTIAL 60.25 26 25
3 RESIDENTIAL 64 26 25
4 RESIDENTIAL 40.60 24 24
5 RESIDENTIAL 42 26 26
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 79
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 PREMIER EXOTICA I WING - B 4 1 0 14 0 0 55
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 40.60 49 49
2 RESIDENTIAL 41.10 2 2
3 RESIDENTIAL 42.20 2 2
4 RESIDENTIAL 61 26 24
5 RESIDENTIAL 64.85 26 26
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 79
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 PREMIER EXOTICA I WING - C 4 1 0 14 0 0 55
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 41.10 2 2
2 RESIDENTIAL 42.20 2 2
3 RESIDENTIAL 64.85 26 25
4 RESIDENTIAL 40.60 48 48
5 RESIDENTIAL 61 26 22
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

75
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 50.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 PREMIER EXOTICA I WING - D 4 1 0 14 0 0 55
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 40 48 48
2 RESIDENTIAL 42.20 2 2
3 RESIDENTIAL 64.50 26 25
4 RESIDENTIAL 41.10 2 2
5 RESIDENTIAL 60.70 26 14
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 35
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

45
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 43
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 PREMIER EXOTICA I WING - E 4 1 0 14 0 0 59
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 42.20 1 0
2 RESIDENTIAL 43.20 26 25
3 RESIDENTIAL 64.50 26 25
4 RESIDENTIAL 60.70 26 14
5 RESIDENTIAL 40 24 24
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

25
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 40.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 PREMIER EXOTICA I WING - F 0 0 0 0 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 RESIDENTIAL 0 0 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
JVP Construction Co Pvt Ltd NA Contractor
Indrajeet S Desmukh NA Architect
H M RAJESTRUCTURAL CONSULTANTS PVT LTD NA Engineer
DESIGN POWER NA Other Professional
ATUL K THAKKAR A51800000037 Real Estate Agent
Dipti Manohar Patil A51900003514 Real Estate Agent
Anil Ranvir Khanna A51800002265 Real Estate Agent
Ankesh Anil Khanna A51800001860 Real Estate Agent
Sabby Anil Khanna A51800002284 Real Estate Agent
Munnalal Rajmani Yadav A51800000659 Real Estate Agent
M/s. Satish Mehta & Company A51800000375 Real Estate Agent
HDFC DEVELOPERS LIMITED A51900000930 Real Estate Agent
Mahesh Amarnath Yadav A51900004200 Real Estate Agent
Akshay Sharva Construction Pvt.Ltd A51800002036 Real Estate Agent
SAMIR HARISH CHHEDA A51800001118 Real Estate Agent
MAHAVIR PRASAD TOSHNIWAL A51700003016 Real Estate Agent
JMB ENTERPRISES A51900002212 Real Estate Agent
SQUARE YARDS CONSULTING PRIVATE LIMITED A51800000454 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
5 Copy of Layout Approval (in case of layout)
6 Copy of Layout Approval (in case of layout)
7 Copy of Layout Approval (in case of layout)
8 Copy of Layout Approval (in case of layout)
9 Copy of Layout Approval (in case of layout)
10 Copy of Layout Approval (in case of layout)
11 Copy of Layout Approval (in case of layout)
12 Copy of Layout Approval (in case of layout)
13 Copy of Layout Approval (in case of layout)
14 Copy of Layout Approval (in case of layout)
15 Copy of Layout Approval (in case of layout)
16 Copy of Layout Approval (in case of layout)
17 Copy of Layout Approval (in case of layout)
18 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC006000000001925 Shrikant G Pandit and Sudha S Pandit View Orders
2 CC006000000044320 Rajkamal Kailashnath Tiwari View Orders
3 CC006000000055159 Philomina Thomas View Orders
4 CC006000000055159 Philomina Thomas View Orders
5 CC006000000056715 RAVI KUMAR View Orders
6 CC006000000057653 Shreyas Anand Erapalli View Orders
7 CC006000000078776 CHRISTOPHER SURENDIRAN ALFRED View Orders
8 CC006000000078855 Agun G Shetty View Orders
9 CC006000000079053 SHAKIL BASHIRUDDIN SHAKIH View Orders
10 CC006000000079138 Ganesh Narasimha Goli View Orders
11 CC006000000141004 Jagat kumar Gupta View Orders