MahaRERA Application

General Information

Other Than Individual

Organization

N B BHONDAVE INFRA
Partnership
NA
Do you have any Past Experience ?
No

Address Details

SURVEY NUMBER 95
N B BHONDAVE INFRA
BHODAVE BAG
RAVET
NEAR S B PATIL SCHOOL
MAHARASHTRA
Pune
Pune
Haveli
Ravet
412101

Organization Contact Details

08989929595

Past Experience Details

Member Information

Member Name Designation Photo
NANDKUMAR BHALCHANDRA BHONDAVE Authorized Signatory View Photo
NINAD NANDKUMAR BHONDAVE Authorized Signatory View Photo
SHREYAS NANDKUMAR BHONDAVE Partner View Photo

Project

BHALCHANDRA BLESSINGS
New Project
31/12/2025
No
Others
No
SURVEY NUMBER 181/3 A, RAVET
M I D C PIPE LINE ROAD
REMAINING PART OF SURVEY NUMBER 181 3A 1
REMAINING PART OF SURVEY NUMBER 181 1A
REMAINING PART OF SURVEY NUMBER 181 2
MAHARASHTRA
Pune
Pune
Haveli
Ravet
BESIDE BHONDVE EMPIRE
SHINDEWASTI
412101
3335.61
2
2
0
0

FSI Details

13726.13
0.13
13726.26

Bank Details

AU SMALL FINANCE BANK LIMITED
AUBL0002459

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 130 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 AS PER REQUIREMENT
Water Conservation, Rain water Harvesting : YES 0 AS PER REQUIREMENT
Energy management : YES 0 AS PER SANCTION RULES
Fire Protection And Fire Safety Requirements : YES 0 AS PER SANCTION RULES
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 AS PER SANCTION PLAN
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 AS PER SANCTION RULES
Water Supply : YES 0 BY BOR WELL AND PCMC PIPE LINE
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 AS PER REQUIREMENT
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : YES 0 AS PER SANCTION RULES
Street Lighting : YES 0 AS PER REQUIREMENT
Community Buildings : YES 0 AS PER SANCTION PLAN
Treatment And Disposal Of Sewage And Sullage Water : YES 0 AS PER SANCTION RULES
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 BHALCHANDRA BLESSINGS COMMERCIAL 31/12/2025 1 1 0 4 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 31.41 8 8
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 90
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 67
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 BHALCHANDRA BLESSINGS RESIDENTIAL 31/12/2025 1 1 2 24 1 20 130
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 62.33 21 19
2 2BHK 62.56 26 16
3 2BHK 58.03 5 4
4 2BHK 62 26 19
5 2BHK 62.09 26 19
6 2BHK 62.2 26 21
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 00
5 X number of Slabs of Super Structure 70
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 57

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SHAILENDRA GHORPADE AND ASSOCIATES NA Architect
AVINASH HOLE NA Engineer
VINIT D ACHHA AND ASSOCIATES NA Chartered Accountant

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 a Details of encumbrances concerned to Finance
2 a Details of encumbrances concerned to Finance
1 b Details of encumbrances concerned to Legal
2 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
4 Building Plan Approval / NA Order for plotted development
5 Building Plan Approval / NA Order for plotted development
6 Building Plan Approval / NA Order for plotted development
7 Building Plan Approval / NA Order for plotted development
8 Building Plan Approval / NA Order for plotted development
9 Building Plan Approval / NA Order for plotted development
10 Building Plan Approval / NA Order for plotted development
11 Building Plan Approval / NA Order for plotted development
12 Building Plan Approval / NA Order for plotted development
13 Building Plan Approval / NA Order for plotted development
14 Building Plan Approval / NA Order for plotted development
15 Building Plan Approval / NA Order for plotted development
16 Building Plan Approval / NA Order for plotted development
17 Building Plan Approval / NA Order for plotted development
18 Building Plan Approval / NA Order for plotted development
19 Building Plan Approval / NA Order for plotted development
20 Building Plan Approval / NA Order for plotted development
21 Building Plan Approval / NA Order for plotted development
22 Building Plan Approval / NA Order for plotted development
23 Building Plan Approval / NA Order for plotted development
24 Building Plan Approval / NA Order for plotted development
25 Building Plan Approval / NA Order for plotted development
26 Building Plan Approval / NA Order for plotted development
27 Building Plan Approval / NA Order for plotted development
28 Building Plan Approval / NA Order for plotted development
29 Building Plan Approval / NA Order for plotted development
30 Building Plan Approval / NA Order for plotted development
31 Building Plan Approval / NA Order for plotted development
32 Building Plan Approval / NA Order for plotted development
33 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
2 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
2 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
2 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement