MahaRERA Application

General Information

Other Than Individual

Organization

Rashi Developers
Partnership
NA
Do you have any Past Experience ?
No

Address Details

72-A
Mittal Tower
Nariman Point
Mumbai
Opp Vidhan Bhavan
MAHARASHTRA
Konkan
Mumbai City
Ward ABCD
ABCD-400021
400021

Organization Contact Details

02242139500

Past Experience Details

Member Information

Member Name Designation Photo
Sandeep Chandra Halwasia Authorized Signatory View Photo
Rajesh Vishwanath Tulsyan Authorized Signatory View Photo
Vivek Chandraprakash Singhania Partner View Photo
Ashish Chandraprakash Singhania Partner View Photo

Project

27 East
New Project
30/06/2025
No
Residential
No
14/9 - 14/10
19M Wide MIDC Road
24M Wide Proposed DP Road
Dortmund Laboratories PVT LTD
W263 Plot of MIDC
MAHARASHTRA
Konkan
Thane
Kalyan
Sagaon
Manpada Road
Sagaon
421204
2200
1
1
0
287.64

FSI Details

5606.46
0
5606.46

Bank Details

State Bank Of India
SBIN0004832

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 86 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 6 Mts. Driveway Proposed
Water Conservation, Rain water Harvesting : YES 0 Rain Water Harvesting pit Proposed
Energy management : YES 0 Solar Energy provided as per KDMC rules
Fire Protection And Fire Safety Requirements : YES 0 Will be provided as per Provisional Fire NOC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Meter Room proposed
Fitness Center : YES 0 Proposed on the 29th Floor Amenities
Society Office : YES 0 Proposed at Ground Floor
Swimming Pool : YES 0 Proposed on the west side within the plot
Aggregate area of recreational Open Space : YES 0 287.64 sq.mt Recreational Open Space Provided
Open Parking : YES 0 N.A
Water Supply : YES 0 Will be Provided up to Site by KDMC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Chambers
Storm Water Drains : YES 0 will be connected to municipal storm water line
Landscaping & Tree Planting : YES 0 Trees planted as per KDMC Rule
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Septic tank proposed
Solid Waste Management And Disposal : YES 0 From site-disposal will be provided by KDMC

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 27 East 27 East 31/12/2024 0 1 0 29 1 0 86
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 43.40 8 5
2 1BHK 28.59 5 4
3 2BHK 42.17 2 1
4 2BHK 42.88 7 1
5 1BHK 27.87 3 2
6 2BHK 41.65 1 0
7 2BHK 41.69 2 0
8 2BHK 40.81 2 0
9 2BHK 53.79 3 0
10 2BHK 42.14 4 3
11 2BHK 46.26 12 6
12 1BHK 28.29 10 9
13 1BHK 35.19 5 1
14 2BHK 42.81 1 1
15 2BHK 43.22 7 2
16 2BHK 46.23 13 7
17 2BHK 53.64 3 0
18 2BHK 41.63 8 5
19 2BHK 41.35 2 0
20 2BHK 42.95 1 0
21 2BHK 43.13 1 0
22 2BHK 41.80 4 1
23 2BHK 53.44 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 70
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 23
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 60
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

75
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 61.8

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
The Firm Architecture NA Architect
Aarav Buildcon NA Contractor
KETAN KATARIA AND ASSOCIATES NA Chartered Accountant
Shanghvi Associates Consultants Pvt Ltd NA Engineer
Godrej & Boyce Manufacturing Co. Ltd. NA Contractor
RAJENDRA R CHAPLOT NA Chartered Accountant
Pillar Plus Pvt Ltd NA Contractor

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
4 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
5 Copy of Layout Approval (in case of layout)
6 Copy of Layout Approval (in case of layout)
7 Copy of Layout Approval (in case of layout)
8 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
12 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
11 Engineer’s Certificate on Cost Incurred on Project (Form 2)
12 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
2 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement