MahaRERA Application

General Information

Other Than Individual

Organization

ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED
Company
NA
Do you have any Past Experience ?
Yes

Address Details

CTS NO. 2254
1 MODI BAUG, COMMERCIAL BUILDING
GANESHKHIND ROAD
SHIVAJI NAGAR
NEAR AGRICULTURE COLLEGE
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411016

Organization Contact Details

02071017101
www.rohanbuilders.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Rohan Kritika D E K WingsResidentialNA3619S NO 117 A 1 117 B PARVATI PUNE 411009538A3942017-06-302017-04-28
2Rohan Kritika F G H I J WingResidentialNA7008S NO 117 A1 117 B PARVATI PUNE 411009CTS 538 A51872016-06-302017-03-30
3ROHAN LEHER 2 WINGS K L M N OResidentialNA1520BANER PUNE 411045S NO 53/5 ,53/6 ,54/1 ,54/12 BANER5502016-12-312017-03-31

Member Information

Member Name Designation Photo
SANJAY LUNKAD Authorized Signatory View Photo

Project

ROHAN ANANTA PHASE III
New Project
30/03/2026
Yes
Residential
No
S.NO 125/1/B/1, 125/1/B/2, 125/2/1, 125/2/2
18 MTR D P ROAD
VILLAGE PUNAWALE BOUNDARY
S no 125 PART
S no 124
MAHARASHTRA
Pune
Pune
Mulshi
Tathwade
Mumbai Bengaluru Bypass
Tathawade
411033
2544.13
5
5
0
1898.42

FSI Details

5216.25
17959.47
23175.72

Bank Details

AXIS BANK LIMITED
UTIB0000037

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 392 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 ENTIRE PROJECT
Water Conservation, Rain water Harvesting : YES 0 As per sanction plan
Energy management : YES 50 ENTIRE PROJECT
Fire Protection And Fire Safety Requirements : YES 70 As per provisional fire NOC
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 As per MSEDCL norms
Aggregate area of recreational Open Space : YES 80 ENTIRE PROJECT
Open Parking : YES 0 ENTIRE PROJECT
Water Supply : YES 100 PCMC
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 ENTIRE PROJECT
Storm Water Drains : YES 100 ENTIRE PROJECT
Landscaping & Tree Planting : YES 50 ENTIRE PROJECT
Street Lighting : YES 100 ENTIRE PROJECT
Community Buildings : YES 50 ENTIRE PROJECT
Treatment And Disposal Of Sewage And Sullage Water : YES 100 STP
Solid Waste Management And Disposal : YES 100 OWC

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 ROHAN ANANTA PHASE III WING B1 31/03/2025 1 1 1 12 0 0 58
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 59.86 4 4
2 2BHK 59.67 2 2
3 2BHK 59.66 9 9
4 2BHK 54.31 2 2
5 2BHK 54.03 1 1
6 2BHK 54.12 1 1
7 2BHK 54.13 1 1
8 2BHK 54.4 4 4
9 2BHK 54.51 2 2
10 2BHK 55.5 7 7
11 2BHK 55.58 3 3
12 2BHK 54.04 9 9
13 2BHK 54.29 2 2
14 2BHK 55.69 1 1
15 2BHK 59.49 1 1
16 2BHK 55.52 1 1
17 2BHK 55.54 1 1
18 2BHK 54.18 1 1
19 2BHK 55.88 1 1
20 2BHK 54 5 5
21 2BHK 55.63 1 1
22 2BHK 59.58 4 4
23 2BHK 59.82 11 11
24 2BHK 59.42 1 1
25 2BHK 55.62 3 3
26 2BHK 55.46 3 3
27 2BHK 54.11 3 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 10
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 40
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
11 Overall Percentage of Completion of the work done For the entire Building /Wing 61
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 ROHAN ANANTA PHASE III WING B2 31/03/2025 1 1 1 12 0 5 90
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 55.60 6 6
2 2BHK 55.87 1 1
3 2BHK 54.09 4 4
4 2BHK 54.10 13 13
5 2BHK 54.20 1 1
6 2BHK 54.21 18 18
7 2BHK 54.23 2 2
8 2BHK 54.50 2 2
9 2BHK 54.51 1 1
10 2BHK 55.46 5 5
11 2BHK 55.47 9 9
12 2BHK 55.48 5 5
13 2BHK 55.58 6 6
14 2BHK 55.59 11 11
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 20
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

50
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 60
11 Overall Percentage of Completion of the work done For the entire Building /Wing 66
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 ROHAN ANANTA PHASE III WING B3 31/03/2024 1 1 1 12 0 9 86
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 35.49 10 10
2 2BHK 54.04 1 1
3 1BHK 35.71 11 11
4 2BHK 59.54 1 1
5 2BHK 59.39 4 4
6 2BHK 55.49 2 2
7 2BHK 59.53 3 3
8 2BHK 55.37 1 1
9 1BHK 47.73 4 4
10 2BHK 47.95 2 2
11 2BHK 49.28 2 2
12 2BHK 52.73 14 14
13 2BHK 54.16 2 2
14 2BHK 54.05 20 20
15 2BHK 54.29 2 2
16 2BHK 49.06 5 5
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 ROHAN ANANTA PHASE III WING B4 31/03/2025 1 1 1 12 0 5 66
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 29.63 11 11
2 1BHK 30.48 11 11
3 1BHK 32.49 6 6
4 1BHK 29.97 6 6
5 1BHK 29.83 9 9
6 1BHK 29.61 16 16
7 1BHK 29.03 19 19
8 1BHK 32.76 4 4
9 1BHK 29.82 1 1
10 1BHK 29.06 1 1
11 1BHK 32.78 1 1
12 1BHK 29.60 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 ROHAN ANANTA PHASE III WING C 31/03/2025 0 1 1 10 0 0 92
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 50.49 11 9
2 2BHK 47.04 11 10
3 2BHK 47.82 64 54
4 2BHK 50.33 11 11
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Ar Shashank P Phadke NA Architect
SAURABH KUMAR A52100025007 Real Estate Agent
ELITE LANDBASE PRIVATE LIMITED A52100015504 Real Estate Agent
Holding Bricks Pvt Ltd A52100023033 Real Estate Agent
RANJEET SINGH YADAV A52100000402 Real Estate Agent
SQUARE YARDS CONSULTING PRIVATE LIMITED A51800000454 Real Estate Agent
RK's Marketing A52100000582 Real Estate Agent
EMIRUS REALTY PRIVATE LIMITED A52100017881 Real Estate Agent
HomeAdda A52100001337 Real Estate Agent
AVINASH KAILAS MAHALE A52100022506 Real Estate Agent
PROPERTYPISTOL REALTY PRIVATE LIMITED A51700000043 Real Estate Agent
KEY2HOME PROPERTY ADVISORS A52100000051 Real Estate Agent
HOUSE MART PROPERTIES A52100021959 Real Estate Agent
ELITE LANDBASE PRIVATE LIMITED A52100015504 Real Estate Agent
Cosmotown Shelters LLP A52100005482 Real Estate Agent
Achala Sachin Pradhan A52100019972 Real Estate Agent
AAYUSH PRAMOD INKANE A52100024152 Real Estate Agent
360 REALTORS LLP A51900000246 Real Estate Agent
FULL BASKET PROPERTY SERVICES PRIVATE LIMITED A52100005036 Real Estate Agent
Pin Click Property Management Pvt Ltd. A52100012083 Real Estate Agent
CORAZON HOMES PRIVATE LIMITED A52100028952 Real Estate Agent
JM Financial Products Limited A51900000277 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
ROHAN ANANTA PHASE III Joint CJSD 1318/2018 Civil No Suit NA 2018 Suit filed by promoter Summons to defendant
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Form 2A
2 Form 2A
3 Form 2A
4 Form 2A
5 Form 2A
6 Form 2A
7 Form 2A
8 Form 2A
9 Form 2A
10 Form 2A
11 Form 2A
12 Form 2A
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
7 Disclosure of sold/ booked inventory
8 Disclosure of sold/ booked inventory
9 Disclosure of sold/ booked inventory
10 Disclosure of sold/ booked inventory
11 Disclosure of sold/ booked inventory
12 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement