MahaRERA Application

General Information

Other Than Individual

Organization

HORIZON PROJECTS PVT LTD
Company
NA
Do you have any Past Experience ?
No

Address Details

5TH FLOOR
RUNWAL AND OMKAR ESQUARE
OFF EASTERN EXPRESS HIGHWAY
SION
OPP SION CHUNABHATTI SIGNAL
MAHARASHTRA
Konkan
Mumbai City
Mumbai City
Mumbai City
400022

Organization Contact Details

02261162000

Past Experience Details

Member Information

Member Name Designation Photo
Saurabh Natu Director View Photo
Deepak Lohia Director View Photo

Project

MY CITY - PHASE I - PART I
On-Going Project
31/12/2019
30/06/2021
30/12/2022
No
Residential
No
SURVEY NO 36 PT 77 PT
SANDAP VILLAGE
SURVEY NO 39 BETAVADE
BHOPAR VILLAGE
18 MT WIDE DP ROAD
MAHARASHTRA
Konkan
Thane
Kalyan
DOMBIVLI
Diva-Manpada Road
Betavade
400612
17789.07
5
5
0
4125.11

FSI Details

22881.90
9492.39
32374.29

Bank Details

ICICI BANK LTD
ICIC0000740

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 490 0 50

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 COMPLETED
Water Conservation, Rain water Harvesting : YES 100 COMPLETED
Energy management : YES 90 wip
Fire Protection And Fire Safety Requirements : YES 100 COMPLETED
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 COMPLETED
Aggregate area of recreational Open Space : YES 100 COMPLETED
Open Parking : YES 0 wip
Water Supply : YES 100 COMPLETED
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 COMPLETED
Storm Water Drains : YES 100 COMPLETED
Landscaping & Tree Planting : YES 100 COMPLETED
Street Lighting : YES 100 COMPLETED
Community Buildings : YES 100 COMPLETED
Treatment And Disposal Of Sewage And Sullage Water : YES 100 COMPLETED
Solid Waste Management And Disposal : YES 100 COMPLETED

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 MY CITY - PHASE I - PART I A3 31/12/2020 0 1 2 28 1 18 114
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 37.42 12 12
2 1BHK 37.26 38 38
3 2BHK 51.05 61 61
4 1BHK 35.02 16 12
5 2BHK 48.90 1 0
6 1BHK 35.20 1 0
7 1BHK 35.20 11 8
8 2BHK 48.90 15 15
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 MY CITY - PHASE I - PART I A4 31/12/2020 0 1 2 28 1 27 107
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SH3 9.28 1 0
2 SH4 18.78 1 0
3 SH5 9.94 1 0
4 2BHK 51.05 3 3
5 1BHK 35.20 1 0
6 2BHK 48.90 2 0
7 2BHK 48.90 74 63
8 1BHK 35.20 22 11
9 1BHK 35.02 54 46
10 SH6 10.55 1 0
11 SH1 13.61 1 0
12 SH2 9.92 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 MY CITY - PHASE I - PART I B2 31/12/2020 0 1 2 28 1 42 78
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 50.30 78 78
2 2BHK 47.57 25 23
3 2BHK 47.57 4 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 MY CITY - PHASE I - PART I C3 31/12/2020 0 1 2 28 1 9 109
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 47.25 8 8
2 3BHK 62.89 9 9
3 2BHK 48.95 31 31
4 2BHK 50.30 14 14
5 3BHK 65.48 18 18
6 2BHK 46.24 23 23
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 MY CITY - PHASE I - PART I C4 31/12/2020 0 1 2 20 1 38 82
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SH8 11.05 1 0
2 Shop 22.83 1 0
3 3BHK 62.89 19 18
4 2BHK 47.25 1 0
5 2BHK 46.24 1 0
6 2BHK 47.25 17 15
7 2BHK 46.24 37 34
8 SH7 16.27 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
JYOTI KALE NA Architect
Girish Tathuji Sardar A51700009107 Real Estate Agent
HEMANSHU RAMESH MAVADIA A51700009428 Real Estate Agent
BARCODE REALTY A51700006225 Real Estate Agent
Rajesh Premji Gori A51700010019 Real Estate Agent
Manisha Lifespaces Consulting Pvt. Ltd. A51800008040 Real Estate Agent
Expert Ventures A51700013068 Real Estate Agent
Asset Housing And Realtors Pvt Ltd A52100001657 Real Estate Agent
Global Ventures A51700013662 Real Estate Agent
MITHUN SHANKAR DUNDALE A51700010030 Real Estate Agent
REHAN BEDRE A51700005002 Real Estate Agent
360 REALTORS LLP A51900000246 Real Estate Agent
MAHAVIR PRASAD TOSHNIWAL A51700003016 Real Estate Agent
FANM Property Services Pvt Ltd A52000000045 Real Estate Agent
CRAFT FINANCIAL ADVISORS PVT LTD A51900000136 Real Estate Agent
HOUSEZINN PROPERTIES PRIVATE LIMITED A51700003041 Real Estate Agent
Harmony Infrasolutions Private Limited A51900003914 Real Estate Agent
ELARA MARKETING SERVICES PRIVATE LIMITED A51700000030 Real Estate Agent
SQUARE YARDS CONSULTING PRIVATE LIMITED A51800000454 Real Estate Agent
Pyramid Homes A51700004003 Real Estate Agent
JAIRAM M RAHEJA A51700022203 Real Estate Agent
Horizon Financial &Properties Advisers Private Limited A51800001892 Real Estate Agent
BNM BUSINESS SOLUTIONS LLP A52000032289 Real Estate Agent
Gargi Quadri A52000000720 Real Estate Agent
Hitendra Solanki A51800024600 Real Estate Agent
INVESTORS CLINIC INFRATECH PRIVATE LIMITED A51700004213 Real Estate Agent
JM Financial Products Limited A51900000277 Real Estate Agent
PROPERTYOK REALTORS LLP A60100024592 Real Estate Agent
PROPERTYPISTOL REALTY PRIVATE LIMITED A51700000043 Real Estate Agent
Being Prop Life Style LLP A09400033591 Real Estate Agent
Nobroker Technologies Solutions Private Limited A51800026821 Real Estate Agent
METRO PROPERTIES A51800000740 Real Estate Agent
ROHAN GAUTAM GAIKWAD A51800022533 Real Estate Agent
Neelesh Mishra A49200025942 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
5 Copy of Layout Approval (in case of layout)
6 Copy of Layout Approval (in case of layout)
7 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
7 Building Plan Approval (IOD)
8 Building Plan Approval (IOD)
9 Building Plan Approval (IOD)
10 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
5 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
2 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
26 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
27 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
28 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
29 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
30 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
31 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
32 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
33 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
34 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
35 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
36 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
37 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
38 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
39 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
40 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
41 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
42 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
43 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
44 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
45 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
46 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
47 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
48 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
49 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
50 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
51 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
52 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
53 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
54 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
55 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
56 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
57 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
58 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
59 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
60 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
61 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
62 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
63 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
64 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
65 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
2 Architect’s Certificate on Completion of Project (Form 4)
3 Architect’s Certificate on Completion of Project (Form 4)
4 Architect’s Certificate on Completion of Project (Form 4)
5 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
2 Status of Formation of Legal Entity (Society/Co Op etc.)
3 Status of Formation of Legal Entity (Society/Co Op etc.)
4 Status of Formation of Legal Entity (Society/Co Op etc.)
5 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC006000000000031 Refund of Rs. 15, 38,295 /- and waiver the 24% interest on delay payment. View Orders
2 CC006000000000031 Refund of Rs. 15, 38,295 /- and waiver the 24% interest on delay payment. View Orders
3 CC006000000000608 Sagar Mhaprolkar View Orders
4 CC006000000000671 ADITYA ARVINDKUMAR MESHRAM View Orders
5 CC006000000012452 ANIL PRABHAKAR VIJAPURE View Orders
6 CC006000000012452 NEETA ANIL VIJAPURE View Orders
7 CC006000000023627 Dennis Albert Pinto View Orders
8 CC006000000055551 ANIL PRABHAKAR VIJAPURE View Orders
9 CC006000000193651 HORIZON PROJECTS PVT LTD View Orders
10 CC006000000193653 HORIZON PROJECTS PVT LTD View Orders
11 CC006000000193768 Horizon Projects Pvt Ltd View Orders
12 CC006000000193817 HORIZON PROJECTS PVT LTD View Orders
13 CC006000000193842 HORIZON PROJECTS PVT LTD View Orders
14 CC006000000193843 HORIZON PROJECTS PVT LTD View Orders
15 CC006000000193844 HORIZON PROJECTS PVT LTD View Orders
16 CC006000000193908 HORIZON PROJECTS PVT LTD View Orders
17 CC006000000193915 HORIZON PROJECTS PVT LTD View Orders
18 CC006000000193918 HORIZON PROJECTS PVT LTD View Orders
19 CC006000000193922 HORIZON PROJECTS PVT LTD View Orders
20 CC006000000194240 HORIZON PROJECTS PVT LTD View Orders
21 CC006000000194245 HORIZON PROJECTS PVT LTD View Orders
22 CC006000000194278 HORIZON PROJECTS PVT LTD View Orders