MahaRERA Application

General Information

Other Than Individual

Organization

SHRAVAK PROPERTIES
Partnership
NA
Do you have any Past Experience ?
No

Address Details

82
DARSHAN TRADERS
GANGADHAM ROAD
LAST BUS STOP
MARKET YARD
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411037

Organization Contact Details

02024263663
WWW.SHRAVAKGROUP.COM

Past Experience Details

Member Information

Member Name Designation Photo
MAHAVIR RAMESHLAL CHORDIYA Authorized Signatory View Photo
LILAWATI RAMESHLAL CHORDIYA Partner View Photo

Project

SHRAVAK NIWAS
On-Going Project
30/06/2018
30/06/2018
No
Residential
No
1705
GAVTHAN
SASWAD ROAD
GULABRAO DHUME PROPERTY
DHUME PROPERTY
MAHARASHTRA
Pune
Pune
Purandhar
Dive
412301
2630
1
1
0
0

FSI Details

1778.4
00
1778.40

Bank Details

COSMOS BANK
COSB0000073

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 24 0
Covered Parking ( In Numbers) 16 1 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 SIDE MARGINAL DEVELOPMENT
Water Conservation, Rain water Harvesting : YES 0 RAIN WATER HARVESTING
Energy management : YES 0 solar water heater
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Meter Room
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 BORE WELL
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 SEPTIC TANK
Storm Water Drains : YES 0 NA
Landscaping & Tree Planting : YES 0 0
Street Lighting : YES 0 0
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 only septic tank
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 SHRAVAK NIWAS SHRAVAK NIWAS 0 1 0 5 0 0 16
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 118.34 16 13
2 FLATS 1265.41 40 11
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
HDFC DEVELOPERS LIMITED A51900000930 Real Estate Agent
VIINOD AND ASSOCIIATTES NA Architect
MILIND C MUTHA NA Other Professional
PARAG CHOPADA NA Engineer
PARAG PATHAK NA Contractor

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
3 Copy of the legal title report
4 Copy of the legal title report
5 Copy of the legal title report
6 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement