MahaRERA Application

General Information

Other Than Individual

Organization

Sai Mauli Associates
Partnership
NA
Do you have any Past Experience ?
No

Address Details

Shop No. 8
Deeplaxmi Building
Link Road
Chinchwad Gaon
Morya Hospital
MAHARASHTRA
Pune
Pune
Haveli
Pimpri Chinchawad (M Corp.)
411033

Organization Contact Details

02027414204

Past Experience Details

Member Information

Member Name Designation Photo
Anil Babu Mhetre Authorized Signatory View Photo

Project

MANTHAN
On-Going Project
30/11/2021
30/11/2021
No
Others
No
Gat no. 51
Gat no 50
Gat no 54
30 Mtr Road
Gat no 55
MAHARASHTRA
Pune
Pune
Haveli
Pimpri Chinchawad (M Corp.)
Moshi Alandi Road
Dudulgaon
412105
9323.30
4
4
0
823.96

FSI Details

5987
7933
13920.00

Bank Details

THE KALYAN JANATA SAHAKARI BANK
KJSB0000208

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 167 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 25 CONCRETE ROAD
Water Conservation, Rain water Harvesting : YES 0 RWH
Energy management : YES 0 SOLAR WATER HEATER
Fire Protection And Fire Safety Requirements : YES 0 AS PER CONSULTANTS
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 AS PER CONSULTANTS
Aggregate area of recreational Open Space : YES 10 AS PER CONSULTANTS
Open Parking : NO 0 NA
Water Supply : YES 25 PCMC BORE WELLS
Sewerage (Chamber, Lines, Septic Tank , STP) : NO 0 NA
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : YES 0 AS PER CONSULTANTS
Street Lighting : YES 0 AS PER CONSULTANTS
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 AS PER CONSULTANTS
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 MANTHAN A BUILDING 30/11/2021 0 1 1 8 0 11 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 41.32 12 6
2 1BHK 42.58 4 1
3 1BHK 42.71 9 6
4 1BHK 42.77 8 4
5 1BHK 43.97 3 3
6 1BHK 44.15 6 4
7 1BHK 48.45 3 3
8 2BHK 63.30 8 3
9 2BHK 64.01 8 3
10 2BHK 64.67 6 4
11 2BHK 66.38 7 3
12 2BHK 71.55 2 1
13 SHOP 19.65 1 1
14 SHOP 23.34 3 3
15 SHOP 24.60 2 2
16 SHOP 29.25 1 0
17 SHOP 30.02 3 3
18 SHOP 32.53 3 3
19 SHOP 35.70 2 2
20 SHOP 35.86 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 90
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 55
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

45
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 64.5
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 MANTHAN B BUILDING 30/11/2021 1 1 1 7 0 42 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 62.30 6 2
2 2BHK 64.01 6 2
3 2BHK 64.67 5 2
4 2BHK 66.38 7 1
5 2BHK 96.76 2 0
6 SHOP 24.03 3 3
7 SHOP 30.46 6 4
8 SHOP 33.43 2 2
9 1BHK 41.32 9 3
10 1BHK 42.58 3 1
11 1BHK 42.71 7 4
12 1BHK 42.77 6 4
13 1BHK 43.97 3 1
14 1BHK 44.15 6 6
15 1BHK 89.60 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 MANTHAN C AND C1 BUILDING 30/11/2021 0 1 1 6 0 12 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 37.83 4 0
2 1 BHK 36.00 4 0
3 1 BHK 35.69 4 0
4 1 BHK 37.52 4 0
5 1 BHK 33.26 4 0
6 1 BHK 35.55 4 0
7 1 BHK 41.83 4 0
8 1 BHK 42.53 4 0
9 SHOP 13.18 2 0
10 SHOP 9.87 1 0
11 SHOP 16.68 1 1
12 SHOP 29.06 1 0
13 SHOP 31.70 1 0
14 SHOP 21.20 2 0
15 SHOP 30.68 1 1
16 SHOP 11.80 2 2
17 SHOP 31.33 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 60
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 36
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 MANTHAN D BUILDING 30/11/2021 0 1 1 1 0 00 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 33.62 6 3
2 OFFICE 26.50 6 6
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 75
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 20
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 49.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
KHIRE BHINDE AND ASSOCIATES NA Architect
THREE D PRIME DESIGNNERS PVT LTD NA Structural Engineer
PRATIKSHA ENTERPRISES NA Contractor
SARIKA ELECTRICALS NA

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other