MahaRERA Application

General Information

Other Than Individual

Organization

Bramhacorp Limited
Company
NA
Do you have any Past Experience ?
Yes

Address Details

3 Queen's Garden
Residency Club
Generl A. Vaidya Marg
Camp
Wadia college bridge
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411001

Organization Contact Details

02041423333

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Bramha Suncity PlatinumOthersResidential & Commercial9609.33S No 7 Hissa No 1 to 5 S No 8 Hissa No 1 1 2 S No 38A Hissa No 1B 1 S No 38A Hissa No 1A S No 38B Village Wadgaon Sheri PuneS No 7 Hissa No 1 to 5 S No 8 Hissa No 1 1 2 S No 38A Hissa No 1B 1 S No 38A Hissa No 1A S No 38B Vi41342014-09-292014-09-29
2Bramha BaugResidentialNA11315.7Survey No 55B Hissa No 1A 2B at Village Ghorpadi Taluka Haveli District PuneSurvey No 55B Hissa No 1A 2B at Village Ghorpadi Taluka Haveli District Pune182017-01-312017-02-01
3Bramha Vantage A / BOthersResidential & Commercial2329.8Survey No 6 Hissa No 10 1B Bavdhan Khurd Taluka Mulshi District PuneSurvey No 6 Hissa No 10 1B Bavdhan Khurd Taluka Mulshi District Pune2512017-08-312017-04-29

Member Information

Member Name Designation Photo
ALKA REGE Authorized Signatory View Photo

Project

The Collection Premium
New Project
31/12/2026
No
Others
No
7/1,7/2,7/3,7/4,7/5, 8/1/1/2, 3/2 P
By FIFTH A Phase
By Internal Layout Road therafter 24 meter DP Rd
Kalyani Nagar wadgaonsheri Rd beyond that sno38par
by adjacent and annexed sixth phase
MAHARASHTRA
Pune
Pune
Haveli
VADGAONSHERI
Vadgaonsheri Kalyaninagar Road
vadgaonsheri
411014
1304.43
3
3
0
0

FSI Details

30345.08
9464.21
39809.29

Bank Details

ICICI Bank
ICIC0006488

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) NA 0 0
Covered Parking ( In Numbers) 338 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Concrete Roads
Water Conservation, Rain water Harvesting : YES 0 Rain water Harvesting
Energy management : YES 0 Solar water
Fire Protection And Fire Safety Requirements : YES 0 Fire Fighting Syatem
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Power Supply from MSEDCL
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 Potable Water Supply From Municipal Corporation
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 STP
Storm Water Drains : YES 0 Storm Water Drains
Landscaping & Tree Planting : YES 0 Trees and plants
Street Lighting : YES 0 Street Lighting
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 STP
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 The Collection Premium A WING 31/12/2026 5 0 3 29 0 0 182
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 67.25 2 2
2 2BHK 72.25 1 0
3 3BHK 91.36 8 8
4 3BHK 91.61 16 12
5 1RK 30.37 1 0
6 2BHK 65.98 3 3
7 2BHK 66.24 2 2
8 2BHK 66.77 23 5
9 2BHK 97.41 3 1
10 4.5 BHK PENTHOUSE 225.16 1 0
11 5.5 BHK PENTHOUSE 260.51 1 0
12 2BHK 66.33 20 12
13 2BHK 66.36 22 8
14 2BHK 66.42 24 1
15 2BHK 66.47 1 1
16 2BHK 66.73 20 9
17 2BHK 66.96 22 15
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 35
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 10
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 34.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 The Collection Premium B WING 31/12/2026 5 0 3 29 0 0 104
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4.5 BHK PENTHOUSE 222.17 1 0
2 4.5 BHK PENTHOUSE 184.63 1 1
3 3BHK 90.95 24 23
4 3BHK 91 24 21
5 3.5 BHK 120.73 24 23
6 4.5 BHK 152.83 24 21
7 4.5 BHK PENTHOUSE 180.77 1 0
8 5.5 BHK PENTHOUSE 293.75 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 35
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 10
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 34.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 The Collection Premium Commercial 31/12/2026 5 0 0 3 0 0 52
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 23.96 3 2
2 Shop 24.2 3 2
3 Shop 26.56 3 1
4 Shop 26.73 3 2
5 Shop 27.31 3 1
6 Shop 28.34 3 2
7 Shop 28.66 3 1
8 Shop 28.83 3 1
9 Shop 56.57 1 0
10 Shop 57 1 0
11 Shop 29.26 3 1
12 Shop 30.59 3 0
13 Shop 30.84 3 2
14 Shop 31.76 3 1
15 Shop 33.81 3 2
16 Shop 35.28 3 1
17 Shop 40.74 3 1
18 Shop 60.57 3 0
19 Shop 61.33 1 0
20 Shop 62.19 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 30

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SACHIN SHAH NA Architect
PANKAJ SOMAWANSHI NA Engineer
FAIZ SHAIKH & CO NA Chartered Accountant
FOURTH DIMENSION ARCHITECT PVT LTD NA Architect
Rafiq Ramzanali Premji A52100004366 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
4 Building Plan Approval / NA Order for plotted development
5 Building Plan Approval / NA Order for plotted development
6 Building Plan Approval / NA Order for plotted development
7 Building Plan Approval / NA Order for plotted development
8 Building Plan Approval / NA Order for plotted development
9 Building Plan Approval / NA Order for plotted development
10 Building Plan Approval / NA Order for plotted development
11 Building Plan Approval / NA Order for plotted development
12 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
2 Declaration in FORM B
3 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
7 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement