MahaRERA Application

General Information

Individual

Individual

Shrikant
Dhondu
Hindalkar
Dhondu Lingoji Hindalkar
No

Address For Official Communication

C-346/347
Vashi Plaza
Sector-17
Vashi
Navi Mumbai
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
400703

Contact Details

02240135607

Past Experience Details

Project

SIDDHIVINAYAK SAPPHIRE
New Project
30/06/2021
30/12/2022
No
Others
No
PLOT NO 25
PLOT NO 24
PLOT NO 26
PLOT NO 2829
11 MTR WIDE ROAD
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
ULWE
NAVI MUMBAI
410206
349.88
1
1
0
0

FSI Details

524.82
0
524.82

Bank Details

NAVI MUMBAI CO-OPERATIVE BANK
IBKL0123NMC

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 6 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 Work to commence
Water Conservation, Rain water Harvesting : YES 30 RWH tank to be provided
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Electrical meter will be provided
Aggregate area of recreational Open Space : NO 0 NA
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 Not started
Water Supply : YES 0 Provided up to site by CIDCO
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Work to commence
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 30 Chamber Lines
Storm Water Drains : NO 0 Septic tank to be Provided
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : YES 0 4 no. trees
Landscaping & Tree Planting : YES 0 NA
Street Lighting : NO 0 4 no. trees
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 SIDDHIVINAYAK SAPPHIRE Siddhivinayak Sapphire 31/12/2020 0 1 0 5 0 1 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 11.20 2 0
2 Shop 14.99 1 0
3 1RK 15.83 1 0
4 1RK 16.30 1 0
5 1RK 16.91 1 0
6 1RK 18.93 1 0
7 1BHK 24.65 3 0
8 1BHK 24.76 3 0
9 1BHK 25.10 3 0
10 1BHK 25.21 3 0
11 Shop 11.24 1 1
12 1RK 16.44 1 1
13 1RK 16.63 3 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 70
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 87
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

66
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 19
11 Overall Percentage of Completion of the work done For the entire Building /Wing 54.2

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Atul Patel Architects NA Architect
B S Sukthankar & Associates NA Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement