MahaRERA Application

General Information

Other Than Individual

Organization

AKSHAR LAND DEVELOPERS PRIVATE LIMITED
Company
NA
Do you have any Past Experience ?
No

Address Details

230, 2ND FLOOR
BIG SPLASH
SECTOR 17
VASHI
NEAR NAVRATNA HOTEL
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
400705

Organization Contact Details

02227889991

Past Experience Details

Member Information

Member Name Designation Photo
DEEPAK KANJI ARETHIYA Authorized Signatory View Photo
MEHUL JADAVJI SHAH Managing Director View Photo
BACHUBHAI DHARAMSHI ARETHIYA Managing Director View Photo
HARI BHACHUBHAI MUJAT Managing Director View Photo

Project

ELEMENTA
On-Going Project
31/12/2018
31/12/2018
No
Residential
Yes
SURVEY NO. 55/1, 56/1, 57/1, 57/2, 57/3, 57/4
DAIRY FARM AND IIMM COLLEGE
BY WAKAD TATHAWADE SERVICE ROAD
BY LAND BEARING CTS NO 59K 60 AND 43
BY KALAKHADAK MARANJI ROAD
MAHARASHTRA
Pune
Pune
Mulshi
Tathwade
411033
20048.72
2
2
0
1748.47

FSI Details

14606.39
0
14606.39

Bank Details

HDFC BANK
HDFC0000007

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
ELEMENTA VIDURA VITHOBA NAVALE (HUF) Others Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 57 0 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 INTERNAL ROADS IN TRIMIX & PAVER BLOCKS
Water Conservation, Rain water Harvesting : YES 100 AS PER DESIGN & DRAWING OF CONSULTANT
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 100 AS PER PROVISIONAL FIRE NOC RECEIVED FROM FIRE DEP
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 AS PER SANCTIONED ELECTRICAL LOAD FROM MSEDCL
OTHERS OCCUPANCY : YES 0 PERCENTAGE BALANCE FOR FULL COMPLETION
Aggregate area of recreational Open Space : YES 0 IN LATER SCOPE OF WORK
Open Parking : NO 100 NA
Water Supply : YES 100 PRECONST IN WATER TANKER
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 AS PER DESIGN & DRAWING OF CONSULTANT
Storm Water Drains : YES 100 AS PER DESIGN & DRAWING OF CONSULTANT
Landscaping & Tree Planting : YES 100 AS PER DESIGN & DRAWING OF CONSULTANT
Street Lighting : YES 100 AS PER DESIGN & DRAWING OF CONSULTANT
Community Buildings : YES 100 CLUBHOUSE IN OPEN SPACE
Treatment And Disposal Of Sewage And Sullage Water : YES 100 STP CAPACITY 55KLD
Solid Waste Management And Disposal : YES 100 AS PER DESIGN & DRAWING OF CONSULTANT

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 ELEMENTA A-2 0 1 0 16 1 0 29
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK T1 GF 61.82 1 0
2 2BHK T2 CF 60.42 1 0
3 2.5 BHK GF 81.44 2 0
4 3BHK CF 88.68 1 0
5 3BHK GF 81.31 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 88
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 ELEMENTA A-5 0 1 0 16 1 0 28
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHKT2 60.42 1 0
2 2BHKT1 61.99 1 0
3 2.5BHKGF 77.68 1 0
4 3BHKCF 81.31 1 0
5 2.5BHKGF 81.53 1 0
6 3BHKGF 88.67 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 88

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
VIKAS ACHALKAR NA Architect
Thirty Six Properties Pvt Ltd A51700001354 Real Estate Agent
NARESH RAMNIKLAL SATRA A51700001076 Real Estate Agent
Structural Concept Designs Pvt. Ltd NA Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
3 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement