MahaRERA Application

General Information

Other Than Individual

Organization

Shivam Development Ventures LLP
Partnership
NA
Do you have any Past Experience ?
Yes

Address Details

S.No 214/217, CTS 123A/2
Sainath Compound,
Datta Mandir Road
malad (East)
Opp. Times Of India, W.E. Highway
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
400097

Organization Contact Details

02228602259
www.ghanwatgroup.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1GHANWAT PLAZACommercialNA3345Gat No.482 Chakan - Talegaon Road Nanekarwadi Tal - Khed Dist - PuneGat No 48221112013-09-302016-08-04
2SHIVAM MAJESTICAResidentialNA3195S.No 127 1 chowdhari parrk Area wakad Punes no 127/1/16,23,34,41,48,53,55,643882012-09-302013-07-19
3SHIVAM NITYAResidentialNA300S No 127 1 Choundhari Park Area Wakad Punes no 127/56, Plot No 32182015-01-312015-07-22

Member Information

Member Name Designation Photo
Rajendra Popat Ghanwat Partner View Photo
Popat Maruti Ghanwat Partner View Photo
Changuna Popat Ghanwat Partner View Photo
Rajendra Popat Ghanwat Authorized Signatory View Photo

Project

19 GRAND WEST - C WING and D WING
New Project
31/12/2024
No
Residential
No
23/2/1/3 P and 23/2/1/4 P
CTS NO 5401
CHINCHWAD ROAD
CTS 5247 5251
CTS 5216 5217 5227 5232 5241
MAHARASHTRA
Pune
Pune
Mulshi
Thergaon
ADITYA BIRLA HOSPITAL ROAD
THERGAON
411033
5037.39
2
2
0
505

FSI Details

14972.09
2878.91
17851.00

Bank Details

STATE BANK OF INDIA
SBIN0004523

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 101 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 As Per Drawing Obtained from Consultant
Water Conservation, Rain water Harvesting : YES 0 As Per Drawing Obtained from Consultant
Energy management : YES 0 As Per Drawing Obtained from Consultant
Fire Protection And Fire Safety Requirements : YES 0 As Per Drawing Obtained from Consultant
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 As Per Drawing Obtained from Consultant
Aggregate area of recreational Open Space : YES 0 505
Open Parking : NO 0 NA
Water Supply : YES 0 As Per Drawing Obtained from Consultant
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 As Per Drawing Obtained from Consultant
Storm Water Drains : YES 0 As Per Drawing Obtained from Consultant
Landscaping & Tree Planting : YES 0 As Per Drawing Obtained from Consultant
Street Lighting : YES 0 As Per Drawing Obtained from Consultant
Community Buildings : YES 0 As Per Drawing Obtained from Consultant
Treatment And Disposal Of Sewage And Sullage Water : YES 0 As Per Drawing Obtained from Consultant
Solid Waste Management And Disposal : YES 0 As Per Drawing Obtained from Consultant

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 19 GRAND WEST - C WING and D WING 19 Grand West - C Wing 31/12/2024 1 1 2 16 2 0 2
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK C 1204 58.83 1 1
2 3 BHK C 707 59.95 1 1
3 3 BHK C 801 59.95 1 1
4 3 BHK C 602 59.96 1 1
5 1 BHK MHADA C 202 34.31 1 1
6 1 BHK MHADA C 302 34.31 1 1
7 1 BHK MHADA C 209 42.38 1 1
8 2 BHK MHADA C 106 49.95 1 1
9 2 BHK MHADA C107 49.95 1 1
10 2 BHK MHADA C 204 49.95 1 1
11 2 BHK MHADA C 205 49.95 1 1
12 2 BHK MHADA C 206 49.95 1 1
13 1 BHK MHADA C 408 45.06 1 1
14 1 BHK MHADA C 102 34.31 1 1
15 3 BHK C 507 59.95 1 0
16 1 BHK MHADA C 109 42.38 1 1
17 2 BHK MHADA C 306 49.95 1 1
18 2 BHK MHADA C 305 49.95 1 1
19 2 BHK MHADA C 406 49.95 1 1
20 1 BHK MHADA C 309 42.38 1 1
21 2 BHK C 704 59.62 1 1
22 2 BHK C 1103 59.62 1 1
23 2 BHK C 103 50.39 1 1
24 2 BHK MHADA C 201 48.91 1 1
25 2 BHK C 506 53.97 1 1
26 3 BHK C 902 59.96 1 1
27 3 BHK C 1002 59.96 1 1
28 1 BHK MHADA C 308 45.06 1 1
29 2 BHK C 1205 54.06 1 1
30 3 BHK C 1001 59.95 1 1
31 3 BHK C 1101 59.95 1 1
32 3 BHK C 1107 59.95 1 1
33 2 BHK C 1203 58.59 1 1
34 2 BHK C 1304 58.59 1 0
35 2 BHK C 1102 44.19 1 0
36 2 BHK C 706 53.97 1 1
37 2 BHK C 805 53.97 1 1
38 2 BHK C 806 53.97 1 1
39 2 BHK C 906 53.97 1 1
40 2 BHK C 1106 53.97 1 1
41 3 BHK C 607 59.95 1 1
42 3 BHK C 807 59.95 1 1
43 3 BHK C 907 59.95 1 1
44 2 BHK MHADA C 207 49.95 1 1
45 2 BHK MHADA C 301 48.91 1 0
46 2 BHK MHADA C 303 48.27 1 0
47 2 BHK C 606 53.97 1 1
48 2 BHK C 705 53.97 1 1
49 2 BHK C 905 53.97 1 1
50 1 BHK C 101 43.05 1 0
51 2 BHK C 702 44.19 1 1
52 2 BHK MHADA C 401 48.91 1 0
53 2 BHK C 1003 59.62 1 1
54 2 BHK C 1104 59.62 1 1
55 2 BHK C 503 59.62 1 1
56 2 BHK C 504 59.62 1 1
57 2 BHK C 604 59.62 1 1
58 2 BHK C 804 59.62 1 1
59 2 BHK C 904 59.62 1 1
60 2 BHK C 505 53.97 1 1
61 3 BHK C 501 59.95 1 1
62 3 BHK C 601 59.95 1 1
63 3 BHK C 701 59.95 1 1
64 2 BHK C 1305 54.06 1 0
65 2 BHK C 703 59.62 1 1
66 2 BHK C 803 59.62 1 1
67 2 BHK C 903 59.62 1 1
68 2 BHK C 1105 53.97 1 1
69 2 BHK MHADA 407 49.95 1 1
70 2 BHK MHADA C 404 49.95 1 1
71 2 BHK MHADA C 203 48.27 1 1
72 1 BHK MHADA C 108 45.06 1 1
73 2 BHK MHADA C 405 49.95 1 1
74 1 BHK MHADA C 208 45.06 1 1
75 1 BHK MHADA 409 42.38 1 1
76 3 BHK C 1302 59.79 1 1
77 2 BHK C 1006 53.97 1 1
78 2 BHK C 1005 53.97 1 1
79 3 BHK C 1301 59.95 1 1
80 2 BHK C 1303 58.59 1 1
81 3 BHK C 1201 59.95 1 0
82 3 BHK C 502 59.96 1 1
83 2 BHK C 603 59.62 1 1
84 3 BHK C 1202 59.79 1 1
85 3 BHK C 1307 59.93 1 0
86 2 BHK C 1206 54.08 1 0
87 2 BHK C 1004 59.62 1 1
88 2 BHK MHADA C 403 48.27 1 1
89 3 BHK C 1207 59.93 1 1
90 2 BHK MHADA C 307 49.95 1 0
91 1 BHK MHADA C 402 34.31 1 0
92 2 BHK C 1306 54.08 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 98
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 19 GRAND WEST - C WING and D WING 19 Grand West - D Wing 31/12/2024 1 2 2 15 2 0 2
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK D 708 57.79 1 1
2 2 BHK D 1107 57.24 1 1
3 3 BHK D 203 59.84 1 1
4 3 BHK D 403 59.84 1 1
5 2 BHK D 1008 57.79 1 1
6 2 BHK D 807 57.24 1 1
7 2 BHK D 905 57.79 1 1
8 2 BHK D 706 57.24 1 1
9 2 BHK D 707 57.24 1 1
10 2 BHK D 806 57.24 1 1
11 2 BHK D 1007 57.24 1 1
12 2 BHK D 1208 59.39 1 1
13 2 BHK D 1207 58.64 1 1
14 2 BHK D 1206 58.64 1 1
15 3 BHK D 1201 59.94 1 1
16 2 BHK D 906 57.24 1 1
17 2 BHK D 907 57.24 1 1
18 2 BHK D 1006 57.24 1 1
19 3 BHK D 502 59.84 1 1
20 2 BHK D 1308 59.39 1 1
21 2 BHK D 1305 59.39 1 1
22 2 BHK D 1306 58.64 1 1
23 3 BHK D 602 59.84 1 1
24 3 BHK D 702 59.84 1 1
25 3 BHK D 202 59.84 1 0
26 3 BHK D 302 59.84 1 0
27 3 BHK D 1004 59.96 1 0
28 3 BHK D 1304 59.94 1 0
29 2 BHK D 1307 58.64 1 0
30 2 BHK D 1407 58.64 1 1
31 3 BHK D 1104 59.96 1 1
32 2 BHK D 1408 59.39 1 1
33 2 BHK D 208 57.79 1 1
34 3 BHK D 1203 59.96 1 1
35 3 BHK D 902 59.84 1 1
36 3 BHK D 1303 59.96 1 1
37 2 BHK D 105 57.68 1 0
38 2 BHK D 106 57.24 1 0
39 3 BHK D 201 59.95 1 0
40 2 BHK D 505 57.79 1 1
41 3 BHK D 802 59.84 1 1
42 3 BHK D 102 59.84 1 1
43 2 BHK D 305 57.79 1 1
44 2 BHK D 103 59.84 1 1
45 2 BHK D 605 57.79 1 1
46 2 BHK D 1105 57.79 1 1
47 3 BHK D 1003 59.84 1 1
48 3 BHK D 1402 59.96 1 1
49 3 BHK D 1403 59.96 1 1
50 3 BHK D 904 59.96 1 1
51 2 BHK D 107 57.24 1 1
52 3 BHK D 303 59.84 1 1
53 3 BHK D 402 59.84 1 1
54 3 BHK D 1301 59.94 1 1
55 2 BHK D 1205 59.39 1 1
56 3 BHK D 1202 59.96 1 1
57 3 BHK D 1204 59.94 1 1
58 2 BHK D 606 57.24 1 1
59 3 BHK D 1302 59.96 1 1
60 3 BHK D 101 59.95 1 1
61 3 BHK D 704 59.96 1 1
62 3 BHK D 804 59.96 1 1
63 3 BHK D 903 59.84 1 1
64 2 BHK D 808 57.79 1 1
65 2 BHK D 908 57.79 1 1
66 3 BHK D 801 59.95 1 1
67 2 BHK D 506 57.24 1 1
68 2 BHK D 507 57.24 1 1
69 2 BHK D 206 57.24 1 1
70 3 BHK D 603 59.84 1 1
71 2 BHK D 308 57.79 1 1
72 2 BHK D 408 57.79 1 1
73 2 BHK D 805 57.79 1 1
74 3 BHK D 503 59.84 1 1
75 3 BHK D 304 59.96 1 1
76 3 BHK D 703 59.84 1 1
77 3 BHK D 104 59.96 1 1
78 2 BHK D 405 57.79 1 1
79 2 BHK D 705 57.79 1 1
80 3 BHK D 501 59.95 1 1
81 3 BHK D 601 59.95 1 1
82 3 BHK D 701 59.95 1 1
83 3 BHK D 1103 59.84 1 1
84 3 BHK D 301 59.95 1 1
85 3 BHK D 401 59.95 1 1
86 3 BHK D 1102 59.84 1 1
87 2 BHK D 207 57.24 1 1
88 2 BHK D 306 57.24 1 1
89 2 BHK D 307 57.24 1 1
90 2 BHK D 406 57.24 1 1
91 3 BHK D 204 59.96 1 1
92 3 BHK D 404 59.96 1 1
93 3 BHK D 504 59.96 1 1
94 3 BHK D 1002 59.84 1 1
95 2 BHK D 508 57.79 1 1
96 2 BHK D 608 57.79 1 1
97 2 BHK D 1106 57.24 1 1
98 3 BHK D 1402 59.96 1 0
99 3 BHK D 1403 59.96 1 0
100 2 BHK D 1407 58.63 1 0
101 2 BHK D 1408 57.79 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 95
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 98

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Kimaya Associates Architect & Planners NA Architect
MSDN & Associates NA Chartered Accountant
Mr Shital Shamarao Kadam NA Engineer
G A Bhilare Consultants Pvt Ltd NA Other Professional
Nagesh Ganeshrao Bale A52100025628 Real Estate Agent
RK's Marketing A52100000582 Real Estate Agent
R-Constellation Pvt. Ltd. A52100000304 Real Estate Agent
SPACEINDIA NEST PRIVATE LIMITED A52100002248 Real Estate Agent
Nagesh Ganeshrao Bale A52100025628 Real Estate Agent
SACHIN POWAR A52100002750 Real Estate Agent
Santosh Ashok Mamidwar A52100014212 Real Estate Agent
MINAKSHI DEVI A52100024843 Real Estate Agent
Namrata Jagdish Kariya A52100027203 Real Estate Agent
Prabhat Kumar Birendra Kumar Singh A52100030361 Real Estate Agent
BUDDHARATNA SURYBHAN MANOHAR A52100028420 Real Estate Agent
VIKAS MANIK SUPNAR A52100025872 Real Estate Agent
Kingdom Key Enterprises A52100003869 Real Estate Agent
KIRAN SURESH TIPE A52100018317 Real Estate Agent
MANGESH JAGADALE A52100003518 Real Estate Agent
SPACEINDIA NEST PRIVATE LIMITED A52100002248 Real Estate Agent
OMKAR KAILAS AGALE A52100025017 Real Estate Agent
Hari Manbahadur Sonar A52100021830 Real Estate Agent
Yogesh Pandurang Ingole A52100021313 Real Estate Agent
ASHISH SHANTARAM SHINDE A52100020943 Real Estate Agent
Property Hint Consulting Services A52100019672 Real Estate Agent
R-Constellation Pvt. Ltd. A52100000304 Real Estate Agent
MAISON CHASSE PRIVATE LIMITED A52100000327 Real Estate Agent
KPRBSK REALTORS PRIVATE LIMITED A52100012415 Real Estate Agent
SACHIN SHRIDHAR DESHPANDE A52100006948 Real Estate Agent
Sameer Vinayak Ubale A52100018507 Real Estate Agent
SACHIN ANANDA SANKPAL A52100027847 Real Estate Agent
SPACEINDIA NEST PRIVATE LIMITED A52100002248 Real Estate Agent
SHUBHANGI RAMCHANDRA THAKARE A52100020940 Real Estate Agent
Sumit Sanjayrao Kotalwar A52100020120 Real Estate Agent
KISHOR DHANAJIRAO KASHID A52100025873 Real Estate Agent
GLOBAL REALTORS A52100000018 Real Estate Agent
SATYAJEET TATYASAHEB NIKAM A52100021007 Real Estate Agent
BHARAT DIGAMBAR BELDAR A52100016513 Real Estate Agent
SURAJ SHIVAJI SHIRSAT A52100029834 Real Estate Agent
R-Constellation Pvt. Ltd. A52100000304 Real Estate Agent
Nikhil Bapu Chaudhari A52100027805 Real Estate Agent
PRASHANT SUNIL KAMBLE A52100020801 Real Estate Agent
Sameer Dattatray Dodake A52100023684 Real Estate Agent
Nilkanth Keshavrao Shelke A52100024867 Real Estate Agent
Asheesh Mishra A52100004326 Real Estate Agent
JM Financial Products Limited A51900000277 Real Estate Agent
MAYA KRISHNAJEE SINGH A52100017835 Real Estate Agent
DATTATRYA MARUTI PAWAR A52100026256 Real Estate Agent
Prince Gurjar A52100024084 Real Estate Agent
MagikNest Private Limited A52100025737 Real Estate Agent
Estatepedia LLP A52100019543 Real Estate Agent
BUDDHARATNA SURYBHAN MANOHAR A52100028420 Real Estate Agent
WISTERIA REAL VISION PVT LTD A52100003089 Real Estate Agent
Soumitra Ramesh Bhagwat A52100023084 Real Estate Agent
Lalit Mohan Badgujar A52100029537 Real Estate Agent
POOJA SUBHASHCHANDRA GUPTA A52100024036 Real Estate Agent
Priyanka Santosh Lakhera A52100019574 Real Estate Agent
Prashant Popat Jadhav A52100007463 Real Estate Agent
Pankaj Suryakant Noubade A52300012780 Real Estate Agent
VAIBHAV BHAGWAT ARGADE A52100026398 Real Estate Agent
Mahesh Ankush Babar A52100019168 Real Estate Agent
Shankar Balasaheb Borkar Proprietor Of Pentagon Properties A52100023546 Real Estate Agent
KISHOR DHONDIBA CHOUGULE A52100006700 Real Estate Agent
Shelter Mentors Private Limited A52100024539 Real Estate Agent
Pankaj Prabhakar Mandwe A52100015684 Real Estate Agent
RAHUL RAMESH BALE A52100021380 Real Estate Agent
Pankaj Apparao Dhole A52100028129 Real Estate Agent
RUSHIKESH SUDHIR DURAPHE A52100026516 Real Estate Agent
VISHAL PRAKASH GHATGE A52100002250 Real Estate Agent
Achala Sachin Pradhan A52100019972 Real Estate Agent
Achala Sachin Pradhan A52100019972 Real Estate Agent
FLEXINEST LLP A52100027514 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
12 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
11 Engineer’s Certificate on Cost Incurred on Project (Form 2)
12 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
7 Disclosure of sold/ booked inventory
8 Disclosure of sold/ booked inventory
9 Disclosure of sold/ booked inventory
10 Disclosure of sold/ booked inventory
11 Disclosure of sold/ booked inventory
12 Disclosure of sold/ booked inventory
13 Disclosure of sold/ booked inventory
14 Disclosure of sold/ booked inventory
15 Disclosure of sold/ booked inventory
16 Disclosure of sold/ booked inventory
17 Disclosure of sold/ booked inventory
18 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement