MahaRERA Application

General Information

Other Than Individual

Organization

MAAN HINJE TOWNSHIP DEVELOPERS LLP
Others
LIMITED LIAIBILITY PARTNERSHIP
Do you have any Past Experience ?
No

Address Details

5
GODREJ ONE
EASTERN EXPRESS HIGHWAY
VIKHROLI EAST
PIROJSHAHNAGAR
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
400079

Organization Contact Details

02066410200

Past Experience Details

Other Organization Type Member Information

Name Member Type
Ashdan Township Ventures Private Limited Company
Godrej Properties Limited Company

Project

GODREJ WOODSVILLE
New Project
30/11/2026
Yes
Residential
No
SECTOR R19 SURVEY NO. 208/5(p),208/6/3,207(P),206/1(P)
SR NO 189-3 189-4190-1
208-5P 207P 206-1P 36 MTR WIDE Road
SR NO 208P
SR NO 206-2-1
MAHARASHTRA
Pune
Pune
Mulshi
Hinjavadi (CT)
HINJEWADI
HINJEWADI AND MAAN
411057
20000.50
4
4
0
2086.86

FSI Details

82990.14
0
82990.14

Bank Details

ICICI BANK
ICIC0007565

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 4717 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 As per sanctioned plan
Water Conservation, Rain water Harvesting : YES 0 Recharge pits provided
Energy management : YES 0 Solar PV or SHW as per design
Fire Protection And Fire Safety Requirements : YES 0 Hydrant/ sprinkler wet risers & Fire alarm system
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Meter Room
Others : YES 0 Work yet to be started
Parking : YES 0 all parkings include cycle scooters and cars
Aggregate area of recreational Open Space : YES 0 as per sanctioned plan
Open Parking : YES 0 as per sanctioned plan
Water Supply : YES 0 Municipal/ Tanker water on chargeable basis
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 STP
Storm Water Drains : YES 0 as per approved drawings
Landscaping & Tree Planting : YES 0 As per sanctioned plan
Street Lighting : YES 0 As per design
Community Buildings : YES 0 As per sanctioned plan
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Treated water to be used for gardening &WCflushing
Solid Waste Management And Disposal : YES 0 OWC for wet garbage

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 GODREJ WOODSVILLE TOWER 1 30/06/2026 0 1 4 30 0 11 1270
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 62.46 5 5
2 2BHK 71.48 5 5
3 1BHK 43.41 2 2
4 1BHK 43.79 2 2
5 2BHK 61.44 57 57
6 2BHK 61.4 29 20
7 2BHK 61.73 29 28
8 3BHK 78.95 30 28
9 3BHK 79.42 32 32
10 3BHK 81.36 57 55
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 12
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 21.2
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 GODREJ WOODSVILLE Tower 2 30/06/2026 0 1 4 30 0 11 1220
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 43.48 2 2
2 1BHK 47.93 2 2
3 2BHK 73.27 5 5
4 2BHK 62.77 30 29
5 2BHK 61.48 53 50
6 2BHK 62.53 5 5
7 2BHK 62.75 32 31
8 2BHK 65.93 60 58
9 2BHK 65.95 2 2
10 3BHK 81.36 32 32
11 3BHK 81.39 25 25
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 9
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 20.9
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 GODREJ WOODSVILLE Tower 3 30/06/2026 0 1 4 30 0 8 940
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Studio 23.71 5 5
2 1BHK 43.9 2 2
3 3BHK 81.45 1 1
4 3BHK 81.48 1 1
5 1BHK 43.84 55 55
6 1BHK 51.81 5 5
7 3BHK 81.71 1 1
8 1BHK 42.32 58 58
9 3BHK 81.79 1 1
10 2BHK 62.73 55 52
11 2BHK 62.82 60 60
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 26
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 22.6
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 GODREJ WOODSVILLE Tower 4 30/06/2026 0 1 4 30 0 11 1287
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 43.73 2 2
2 1BHK 43.41 2 2
3 2BHK 64.42 1 1
4 2BHK 62.41 6 6
5 3BHK 79.42 30 30
6 2BHK 64.41 2 2
7 2BHK 71.57 6 6
8 2BHK 61.4 58 58
9 2BHK 61.73 58 55
10 3BHK 78.95 30 30
11 3BHK 81.36 57 52
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 26
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 22.6

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
VK:A Architecture NA Architect
Abhishek M Loya Director - Samartha Constro Consultants LLP NA Engineer
M D Deshpande & Co NA Chartered Accountant
Sarfaraz Shaikh John Mech-EI Technologies (P) Ltd NA Other Professional
Sheetalkumar Shah Sarika Infratech NA Contractor
360 REALTORS LLP A51900000246 Real Estate Agent
3B CONSULTING PRIVATE LIMITED A51700004497 Real Estate Agent
A K Properties A52100000622 Real Estate Agent
Addressofchoice Realty Pvt Ltd A52100000116 Real Estate Agent
AMIT VINODKUMAR GUPTA A52100000529 Real Estate Agent
ASHISH MODI A52100003744 Real Estate Agent
ATUL SAVADIA A52100007035 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
GODREJ WOODSVILLE Arbitrator 446 Civil No Arbitration Petition NA 2020 Pending
NA
GODREJ WOODSVILLE Commercial District Court Pune 25 Civil No Suit NA 2022 Pending
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
3 Copy of the legal title report
4 Copy of the legal title report
5 Copy of the legal title report
6 Copy of the legal title report
1 a Details of encumbrances concerned to Finance
2 a Details of encumbrances concerned to Finance
3 a Details of encumbrances concerned to Finance
1 b Details of encumbrances concerned to Legal
2 b Details of encumbrances concerned to Legal
3 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
7 Disclosure of sold/ booked inventory
8 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
2 Other – Finance
3 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement