MahaRERA Application

General Information

Other Than Individual

Organization

Vilas Javdekar Eco Developers Pvt. Ltd.
Company
NA
Do you have any Past Experience ?
Yes

Address Details

306
Siddharth Towers
Sangam Press Road
Kothrud
Opposite Contacare Eye Hospital
MAHARASHTRA
Pune
Pune
Haveli
Kothrud
411038

Organization Contact Details

02067648000
www.javdekars.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Palladio Phase 1ResidentialNA6236Survey no 84 1A 1 and Survey no 84 1A 2 behind D Y Patil College Tathawade Pune 411033Survey no 84 1A 1 and Survey no 84 1A 234142014-11-012014-11-01

Member Information

Member Name Designation Photo
Vilas Yashwant Javdekar Director View Photo
Aditya Vilas Javdekar Authorized Signatory View Photo

Project

Palladio Phase 2
New Project
30/12/2022
No
Others
No
84/1A/1 , 84/1A/2
24 meter wide DP road
Adjacent survey no 87 P
12 meter wide DP road
Adjacent survey no 84 P
MAHARASHTRA
Pune
Pune
Mulshi
Tathwade
Tathwade
behind D Y Patil college
411033
9764
3
3
0
976.4

FSI Details

27359.69
0
27359.69

Details of RERA Designated Separate Bank Account

Kotak Mahindra Bank
KKBK0001751

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 90 Internal Roads in Tremix Conrete
Water Conservation, Rain water Harvesting : YES 100 As per drawings obtained from Consultant
Energy management : YES 75 As per drawings obtained from Consultant
Fire Protection And Fire Safety Requirements : YES 60 As per drawing from Consultant and Fire Department
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 As per drawings obtained from Consultant
All these facilities : YES 0 To be shared with Phase 1 building B
Aggregate area of recreational Open Space : YES 95 As per approved sanction plan by PCMC
Open Parking : YES 60 Parking allotment to be made by society
Water Supply : YES 60 Water supply by PCMC / borewell / tanker
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 90 STP capacity 240 cu.m.per day
Storm Water Drains : YES 60 As per drawings obtained from Consultant
Landscaping & Tree Planting : YES 75 As per drawings obtained from Consultant
Street Lighting : YES 30 As per drawings obtained from Consultant
Community Buildings : YES 100 Club House in Recreational Open Space
Treatment And Disposal Of Sewage And Sullage Water : YES 90 As per drawings obtained from Consultant
Solid Waste Management And Disposal : YES 100 OWC capacity 606 kg per day

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Palladio Phase 2 Building A 31/03/2020 0 1 1 12 1 22 21
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 70.99 11 11
2 2 BHK 71.10 11 11
3 3 BHK 94.23 6 6
4 3 BHK 94.35 6 6
5 3 BHK 94.41 6 6
6 3 BHK 94.53 6 6
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Palladio Phase 2 Building E 31/12/2021 1 1 1 21 2 0 152
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 62.93 21 21
2 2 BHK 65.21 21 21
3 3 BHK 78.06 18 18
4 3 BHK 78.11 60 60
5 2 BHK 59.50 42 42
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 8
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
11 Overall Percentage of Completion of the work done For the entire Building /Wing 81.8
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Palladio Phase 2 Commercial 31/12/2021 0 1 0 2 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 1 35.77 1 1
2 SHOP 2 35.87 1 1
3 SHOP 3 43.86 1 1
4 SHOP 4 43.98 1 1
5 SHOP 5 44.02 3 2
6 SHOP 6 45.45 4 3
7 SHOP 7 59.04 5 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Sameer Valimbe NA Architect
Jayant Vinayak Inamdar NA Engineer
360 REALTORS LLP A51900000246 Real Estate Agent
MADAN MOHAN AGARWAL A52100002429 Real Estate Agent
Avinash Gajanan Bhangale A52100012039 Real Estate Agent
Amanco Realtors Pvt Ltd A52100006230 Real Estate Agent
Apna Ghar Lifespaces LLP A52100008848 Real Estate Agent
Sonali dilip shirke A52100009551 Real Estate Agent
Jitendra Ramesh Newadkar A52100001030 Real Estate Agent
MAYANK BARHOLIA A52100003500 Real Estate Agent
CORAZON HOMES AND SECURITIES A52100000096 Real Estate Agent
Mukundi Lal Vishwakarma A52100003071 Real Estate Agent
ATUL SANTU MANDE A52100001458 Real Estate Agent
UMESH RAMESH PAWAR A52100000006 Real Estate Agent
ATUL SANTU MANDE A52100001458 Real Estate Agent
EstateMint Pvt Ltd A52100004278 Real Estate Agent
ATUL SAVADIA A52100007035 Real Estate Agent
Fourth Dimension Business Solutions Private Limited A52100001293 Real Estate Agent
FULL BASKET PROPERTY SERVICES PRIVATE LIMITED A52100005036 Real Estate Agent
YOGESH YADAV A52100013755 Real Estate Agent
AMIT KUMAR MANGALAM A52100005479 Real Estate Agent
JUST DEAL REALTY PRIVATE LIMITED A52100005780 Real Estate Agent
NITESH KUMAR SINGH A52100002854 Real Estate Agent
MAGIC HOMES A52100002308 Real Estate Agent
MAISON CHASSE PRIVATE LIMITED A52100000327 Real Estate Agent
NITIN SHANKAR KADDE A52100000577 Real Estate Agent
Omkar Raghunath Mandvekar A52100013785 Real Estate Agent
Pankaj Suryakant Noubade A52300012780 Real Estate Agent
Vaibhav Shivaji Jadhaw A52100004052 Real Estate Agent
Pearlquest Associates Pvt Ltd A52100001979 Real Estate Agent
SAGAR RADHESHYAM TAWARI A52100005443 Real Estate Agent
PROPENGINE REALTECH LLP A52100000628 Real Estate Agent
Saurabh Sudhir Shedolkar A52100008716 Real Estate Agent
Viral Singh Chauhan A52100008416 Real Estate Agent
ELARA MARKETING SERVICES PRIVATE LIMITED A51700000030 Real Estate Agent
PropZapper Consultancy Pvt Ltd A52100011506 Real Estate Agent
PROPFINDER INDIA PRIVATE LIMITED A52100004005 Real Estate Agent
RANJEET SINGH YADAV A52100000402 Real Estate Agent
MOHSIN ABDUL KHAN A52100009864 Real Estate Agent
R-Constellation Pvt. Ltd. A52100000304 Real Estate Agent
Realtors Compass A52100001849 Real Estate Agent
KPRBSK REALTORS PRIVATE LIMITED A52100012415 Real Estate Agent
RK's Marketing A52100000582 Real Estate Agent
SMC REAL ESTATE ADVISORS PRIVATE LIMITED A51900000042 Real Estate Agent
SOURABH BELIYA A52100010736 Real Estate Agent
subodh shukla A52100006838 Real Estate Agent
STAR HOUSING REALTY A52100000810 Real Estate Agent
SUBRAT SUDHIR JAIN A52100003460 Real Estate Agent
SWATI JAIN A52100008300 Real Estate Agent
Vilas Javdekar Engineering Services LLP A52100014969 Real Estate Agent
NITIN KUMAR PANDEY A52100010746 Real Estate Agent
WISTERIA REAL VISION PVT LTD A52100003089 Real Estate Agent
SPACEINDIA NEST LLP A52100002248 Real Estate Agent
SQUARE YARDS CONSULTING PRIVATE LIMITED A51800000454 Real Estate Agent
BAJAJ FINANCE LTD A52100003465 Real Estate Agent
YOGESH RAGHAVENDRA KOSE A52100012955 Real Estate Agent
AVINASH PANDA A52100014316 Real Estate Agent
YOGESH KUMAR A52100007189 Real Estate Agent
IRFAN KHAN PAWAR A52100012496 Real Estate Agent
SURYAJI DURYODHAN SHRIKHANDE A52100014943 Real Estate Agent
KAJAL MAHAWAR A52100010846 Real Estate Agent
Kingdom Key Enterprises A52100003869 Real Estate Agent
Lokesh kumra A52100006340 Real Estate Agent
LIFE SPACE PROPERTY SOLUTIONS PVT LTD A52100000993 Real Estate Agent
Propdeal Realtors and Consulting Private Limited A52100007278 Real Estate Agent
SANTOSH POPAT GUJAR A52200012152 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)
1 Proforma of Agreement for sale
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
3 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
2 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
2 Status of Formation of Legal Entity (Society/Co Op etc.)
3 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement
1 Other
1 Other – Finance
1 Other – Technical