MahaRERA Application

General Information

Other Than Individual

Organization

SAMRIN INFRA PRIVATE LIMITED
Company
NA
Do you have any Past Experience ?
No

Address Details

PLOT NO. A 221
SAMRIN HOUSE
16V
WAGLE INDUSTRIAL ESTATE
BEHIND BRADMA COMPANY
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
400604

Organization Contact Details

02225811199
www.samrinheritage.com

Past Experience Details

Member Information

Member Name Designation Photo
MUSTAK SAIFAN SHAIKH Authorized Signatory View Photo
MUSTAK SAIFAN SHAIKH Managing Director View Photo
MOHAMMED TAHIR MUSTAK SHAIKH Director View Photo
NAJMA MUSTAK SHAIKH Director View Photo

Project

SAMRIN HERITAGE
New Project
30/12/2023
29/12/2024
No
Others
Yes
377
Patil Compound
12Pt20mt wide TP Road
12Pt20mt wide TP Road
24Pt40mt wide Almeda Road
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
Almeda Road
Panchpakhadi
400602
8423.1
4
4
0
795.8

FSI Details

33896.46
0
33896.46

Bank Details

HDFC BANK LTD
HDFC0001235

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
SAMRIN HERITAGE PRABHUDAYAL J PATHAK Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Upload Agreement / MoU Copy
9 Upload Agreement / MoU Copy
10 Upload Agreement / MoU Copy
11 Upload Agreement / MoU Copy
12 Upload Agreement / MoU Copy
13 Upload Agreement / MoU Copy
14 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
SAMRIN HERITAGE OMPRAKASH J PATHAK Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Upload Agreement / MoU Copy
9 Upload Agreement / MoU Copy
10 Upload Agreement / MoU Copy
11 Upload Agreement / MoU Copy
12 Upload Agreement / MoU Copy
13 Upload Agreement / MoU Copy
14 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
SAMRIN HERITAGE DURGAPRASAD J PATHAK Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Upload Agreement / MoU Copy
9 Upload Agreement / MoU Copy
10 Upload Agreement / MoU Copy
11 Upload Agreement / MoU Copy
12 Upload Agreement / MoU Copy
13 Upload Agreement / MoU Copy
14 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
SAMRIN HERITAGE SURENDRAKUMAR J PATHAK Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Upload Agreement / MoU Copy
4 Upload Agreement / MoU Copy
5 Upload Agreement / MoU Copy
6 Upload Agreement / MoU Copy
7 Upload Agreement / MoU Copy
8 Upload Agreement / MoU Copy
9 Upload Agreement / MoU Copy
10 Upload Agreement / MoU Copy
11 Upload Agreement / MoU Copy
12 Upload Agreement / MoU Copy
13 Upload Agreement / MoU Copy
14 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 504 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 INTERNAL ROADS
Water Conservation, Rain water Harvesting : YES 0 WILL BE DONE PRIOR TO OC
Energy management : YES 0 SOLAR WATER HEATING
Fire Protection And Fire Safety Requirements : YES 0 FIRE FIGHTING SYSTEM
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 WILL BE DONE PRIOR TO OC
Club House : YES 0 WILL BE DONE PRIOR TO OC
Swimming Pool : YES 0 WILL BE DONE PRIOR TO OC
Aggregate area of recreational Open Space : YES 0 WILL BE DONE PRIOR TO OC
Open Parking : NO 0 NA
Water Supply : YES 0 TMC WATER SUPPLY
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 STP
Storm Water Drains : YES 0 WILL BE DONE PRIOR TO OC
Landscaping & Tree Planting : YES 0 GARDEN
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 WILL BE DONE PRIOR TO OC
Solid Waste Management And Disposal : YES 0 SOLID WASTE MGMT

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 SAMRIN HERITAGE S1 30/12/2023 0 1 0 37 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 67.01 29 3
2 2BHK 67.14 29 4
3 2BHK 78.81 5 0
4 3BHK 99.65 53 15
5 Shop 302.56 10 6
6 Office space 572.77 16 7
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 78
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 20
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 10
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

20
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 32.8
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 SAMRIN HERITAGE S2 30/12/2023 0 1 0 37 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 55.7 5 2
2 2BHK 65.19 29 7
3 2BHK 65.72 29 14
4 2BHK 74.31 29 12
5 2BHK 74.68 24 10
6 Office space 233.85 13 7
7 Shop 21.39 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 81
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 25
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 10
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

20
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 33.6
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 SAMRIN HERITAGE S3 30/12/2023 0 1 0 21 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 51.15 1 0
2 2BHK 135.01 1 0
3 Office space 315.10 8 6
4 1BHK 13.86 1 0
5 1BHK 34.06 19 12
6 1BHK 36.35 19 13
7 1BHK 39.07 15 8
8 Shop 144.18 2 2
9 1BHK 39.12 16 16
10 2BHK 47.59 3 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 95
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 60
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

80
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 50
11 Overall Percentage of Completion of the work done For the entire Building /Wing 65
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 SAMRIN HERITAGE PARKING 30/12/2023 0 1 0 20 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 BIKE PARKING 0 342 0
2 PARKING 14110.55 494 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
NEXSTEP CONSULTANT NILESH SAWANT NA Architect
AJAY MAHALE & ASSOCIATES NA Engineer
ENVIROCON CMS VINAY NIKAM NA Other Professional
CNS CONSULTANTS NA Other Professional
CHURUWALA HOMES LLP A51800000197 Real Estate Agent
Karan Bharat Chandan A51900026113 Real Estate Agent
MACHINDRA CHOUDHRI A51700019544 Real Estate Agent
Pratik Mohan Narvekar A51700014195 Real Estate Agent
SURABHI REALTORS AND PROPERTY MANAGEMENT CONSULTANTS LLP A51700007389 Real Estate Agent
Prop Leader Realty A51700005043 Real Estate Agent
KUNAL KISHOR VYAS A51800016043 Real Estate Agent
Suhas Uttam Bagade A51700000440 Real Estate Agent
BULLMEN REALTY INDIA PRIVATE LIMITED A51900009197 Real Estate Agent
KAYCOMM REALTY LLP A52100022646 Real Estate Agent
VINOD KUMAR PARASNATH UPADHYAY A51700019886 Real Estate Agent
Dhiraj Ashok Bagal A51700012788 Real Estate Agent
Home Street Realtors A51700006797 Real Estate Agent
EKTA KUNAL BHARTHIYA A51700016499 Real Estate Agent
Pravin Suresh Mhapadi A51700028383 Real Estate Agent
Bhupinder Singh Saini A51700001823 Real Estate Agent
SACHIN BHANDARI A51700000738 Real Estate Agent
Ashwa Realtors A51700002855 Real Estate Agent
Vipul Shethia A51700001066 Real Estate Agent
Abhay Balaji Rao A51800014484 Real Estate Agent
RAHUL RAMESH PAITHANKAR A51700007223 Real Estate Agent
Rajesh Varia A51700014324 Real Estate Agent
PRAKASH DHONDU PAYARE A51700001227 Real Estate Agent
CHURUWALA HOMES LLP A51800000197 Real Estate Agent
Mystic India Realtors LLP A51900006152 Real Estate Agent
JM Financial Products Limited A51900000277 Real Estate Agent
Ecstasy Properties & Investments Company A51700004010 Real Estate Agent
QUICK HOMES PROPERTY ADVISORY A51800005188 Real Estate Agent
BLUE LOTUS A51700003670 Real Estate Agent
AMIT KUMAR GUPTA A51700000728 Real Estate Agent
SUNIL OMPRAKASH MANGLA A51700009160 Real Estate Agent
DHARMEN GIRISH THAKKER A51700000056 Real Estate Agent
usha ramesh paithankar A51700018122 Real Estate Agent
JYOTI CHETAN PAITHANKAR A51700018107 Real Estate Agent
CHETNA RAHUL PAITHANKAR A51700018100 Real Estate Agent
Netra Realty Solutions Pvt Ltd NA Other Professional

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 a Details of encumbrances concerned to Finance
4 Details of encumbrances
5 a Details of encumbrances concerned to Finance
1 b Details of encumbrances concerned to Legal
2 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
5 Copy of Layout Approval (in case of layout)
6 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
7 Building Plan Approval (IOD)
8 Building Plan Approval (IOD)
9 Building Plan Approval (IOD)
10 Building Plan Approval (IOD)
11 Building Plan Approval (IOD)
12 Building Plan Approval (IOD)
13 Building Plan Approval (IOD)
14 Building Plan Approval (IOD)
15 Building Plan Approval (IOD)
16 Building Plan Approval (IOD)
17 Building Plan Approval (IOD)
18 Building Plan Approval (IOD)
19 Building Plan Approval (IOD)
20 Building Plan Approval (IOD)
21 Building Plan Approval (IOD)
22 Building Plan Approval (IOD)
23 Building Plan Approval (IOD)
24 Building Plan Approval (IOD)
25 Building Plan Approval (IOD)
26 Building Plan Approval (IOD)
27 Building Plan Approval (IOD)
28 Building Plan Approval (IOD)
29 Building Plan Approval (IOD)
30 Building Plan Approval (IOD)
31 Building Plan Approval (IOD)
32 Building Plan Approval (IOD)
33 Building Plan Approval (IOD)
34 Building Plan Approval (IOD)
35 Building Plan Approval (IOD)
36 Building Plan Approval (IOD)
37 Building Plan Approval (IOD)
38 Building Plan Approval (IOD)
39 Building Plan Approval (IOD)
40 Building Plan Approval (IOD)
41 Building Plan Approval (IOD)
42 Building Plan Approval (IOD)
43 Building Plan Approval (IOD)
44 Building Plan Approval (IOD)
45 Building Plan Approval (IOD)
46 Building Plan Approval (IOD)
47 Building Plan Approval (IOD)
48 Building Plan Approval (IOD)
49 Building Plan Approval (IOD)
50 Building Plan Approval (IOD)
51 Building Plan Approval (IOD)
52 Building Plan Approval (IOD)
53 Building Plan Approval (IOD)
54 Building Plan Approval (IOD)
55 Building Plan Approval (IOD)
56 Building Plan Approval (IOD)
57 Building Plan Approval (IOD)
58 Building Plan Approval (IOD)
59 Building Plan Approval (IOD)
60 Building Plan Approval (IOD)
61 Building Plan Approval (IOD)
62 Building Plan Approval (IOD)
63 Building Plan Approval (IOD)
64 Building Plan Approval (IOD)
65 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
5 Commencement Certificates / NA Order for plotted development
6 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
2 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
2 CERSAI details
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
7 Disclosure of sold/ booked inventory
8 Disclosure of sold/ booked inventory
9 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
2 Proforma of Agreement for sale
3 Proforma of Agreement for sale
4 Proforma of Agreement for sale
5 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
4 Proforma of Allotment letter
5 Proforma of Allotment letter
6 Proforma of Allotment letter
7 Proforma of Allotment letter
8 Proforma of Allotment letter
9 Proforma of Allotment letter
10 Proforma of Allotment letter
11 Proforma of Allotment letter
12 Proforma of Allotment letter
13 Proforma of Allotment letter
14 Proforma of Allotment letter
15 Proforma of Allotment letter
16 Proforma of Allotment letter
17 Proforma of Allotment letter
18 Proforma of Allotment letter
19 Proforma of Allotment letter
20 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
4 Other
5 Other
6 Other
7 Other
8 Other
9 Other
10 Other
11 Other
12 Other
13 Other
14 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement