MahaRERA Application

General Information

Other Than Individual

Organization

SRS PROJECTS JV
Others
Association of Persons AOP
Do you have any Past Experience ?
No

Address Details

813 - 816
Sacred World
Jagtap Chowk
Wanowrie
Mc. Donald's
MAHARASHTRA
Pune
Pune
Haveli
wanwadi
411040

Organization Contact Details

02041236336
www.srs-group.in

Past Experience Details

Other Organization Type Member Information

Name Member Type
Surendra R Sanas Individual
Siddhanth S Sanas Individual

Project

Eastwoods
On-Going Project
30/06/2018
30/06/2018
30/06/2019
No
Residential
No
S No 29 Hissa No 10/1 10/2 and 10/4
S No 29 H No 10-3 H No 31Part
S No 29 H No 31 open space
S No 29 H No 8-1 and Internal Road
Internal Road
MAHARASHTRA
Pune
Pune
Haveli
kondhwa khurd
411048
2816.6
1
1
0
281.66

FSI Details

3638.47
1713.07
5351.54

Bank Details

HDFC BANK LTD
HDFC0000148

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 52 31 95

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 WBM+Interlock blocks
Water Conservation, Rain water Harvesting : YES 100 Recaharging borewells
Energy management : YES 100 Solar water heating
Fire Protection And Fire Safety Requirements : YES 100 Fire extinguisher and fire fighting system
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 From existing MSEDCL Supply
CCTV : YES 100 CCTV in common areas
Generator : YES 100 Power backup for complete building
Home Automation : YES 100 Light and Fan points in Living and Master bedroom
Intercom : YES 100 Between flats and security cabin
Lifts : YES 100 Schindler make Lifts
Recretional Area : YES 100 Children play area and Garden.
Terrace Lounge : YES 100 Multi utility deck area with Cabana
Video Door Phone : YES 100 Video door phone on the main door of the flat
Aggregate area of recreational Open Space : YES 100 281.66 Sq.mtr.
Open Parking : NO 0 NA
Water Supply : YES 100 Tanker
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 PMC Drainage
Storm Water Drains : YES 100 Surface drain
Landscaping & Tree Planting : YES 100 As per PMC requirements.
Street Lighting : YES 100 LED Lighting
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 disposal into PMC drainage
Solid Waste Management And Disposal : YES 100 Rotary composter

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Eastwoods Eastwoods 0 1 0 12 2 0 52
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 77.27 2 1
2 2BHK 76.93 5 5
3 2BHK 84.55 3 3
4 2BHK 77.21 3 2
5 2BHK 76.25 6 5
6 2BHK 84.57 3 3
7 4 BHK 156.94 1 1
8 4BHK 163.90 1 1
9 4BHK 154.54 1 0
10 4BHK 161.86 2 2
11 4BHK 161.69 2 1
12 3BHK 137.80 2 1
13 4BHK 154.33 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Pundlik S Joshi NA Architect
Vithal Damodar Bhadale NA Contractor
Shanakr Megha Rathod NA Contractor
Harishankar Sidhuram Yadav NA Contractor
Revatram Jiyaram Suthar NA Contractor
Asif Shaikh NA Contractor
EXCELLENT WATERPROOOFING CO. Prop. Ashok Mali NA Contractor
Madhuban Yadav NA Contractor
LAVHE CONSTRUCTION Prop. Bhujang Lavhe NA Contractor
Mr. Kuleen Dharamshi Thakker NA Contractor
Rajesh Chandrashekhar Ratkalkar NA Engineer
Ravi Chaitanya Varma A52100000903 Real Estate Agent
Shalini Ravi Varma A52100000047 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Certificates of Architect (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement