Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
1 |
L AND T SEAWOODS RESIDENCES PHASE I
|
TOWER D04
|
31/12/2023
|
2
|
1
|
0
|
15
|
0 |
0 |
150 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2 BHK PREMIERE 2B |
48.82 |
2 |
2 |
2 |
2 BHK PREMIERE 2C |
48.96 |
1 |
1 |
3 |
3 BHK GRANDIO 2B |
72.95 |
2 |
2 |
4 |
2 BHK CLASSIC 4B |
45.74 |
2 |
2 |
5 |
2 BHK CLASSIC 4C |
45.82 |
2 |
2 |
6 |
2 BHK CLASSIC 4D |
45.92 |
1 |
1 |
7 |
3 BHK GRANDIO 2A |
72.84 |
14 |
14 |
8 |
3 BHK GRANDIO 4A |
72.87 |
12 |
12 |
9 |
2 BHK ELEGANTE 4A |
55.64 |
4 |
4 |
10 |
2 BHK ELEGANTE 4B |
55.87 |
4 |
4 |
11 |
2 BHK PREMIERE 2A |
48.80 |
11 |
11 |
12 |
2 BHK ELEGANTE 4C |
55.89 |
20 |
20 |
13 |
2 BHK CLASSIC 4F |
46.05 |
11 |
11 |
14 |
2 BHK CLASSIC 2A |
44.80 |
11 |
11 |
15 |
Shop |
173.55 |
1 |
0 |
16 |
2 BHK CLASSIC 4E |
46.00 |
11 |
11 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
90
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
15
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
0
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
0
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
0
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
30.5
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
2 |
L AND T SEAWOODS RESIDENCES PHASE I
|
TOWER D05
|
31/12/2023
|
2
|
1
|
0
|
15
|
0 |
0 |
152 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2 BHK CLASSIC 2B |
44.93 |
12 |
12 |
2 |
2 BHK CLASSIC 4A |
45.48 |
2 |
2 |
3 |
2 BHK CLASSIC 4B |
45.73 |
4 |
4 |
4 |
2 BHK ELEGANTE 3B |
55.42 |
22 |
22 |
5 |
2 BHK PREMIERE 4A |
51.78 |
7 |
7 |
6 |
2 BHK PREMIERE 4B |
51.80 |
6 |
6 |
7 |
2 BHK CLASSIC |
43.98 |
14 |
14 |
8 |
3 BHK GRANDIO 2B |
72.96 |
1 |
1 |
9 |
3 BHK GRANDIO 4B |
72.96 |
12 |
12 |
10 |
2 BHK CLASSIC 4C |
45.80 |
8 |
8 |
11 |
3 BHK GRANDIO 2A |
72.87 |
14 |
14 |
12 |
2 BHK ELEGANTE 3A |
55.14 |
4 |
4 |
13 |
2 BHK ELEGANTE 3C |
55.55 |
2 |
2 |
14 |
2 BHK PREMIERE 4C |
51.96 |
1 |
1 |
15 |
3 BHK GRANDIO 2C |
73.03 |
1 |
1 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
90
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
0
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
0
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
0
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
0
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
0
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
19
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
3 |
L AND T SEAWOODS RESIDENCES PHASE I
|
TOWER D06
|
31/12/2023
|
2
|
1
|
0
|
15
|
0 |
0 |
145 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2 BHK CLASSIC 3A |
45.53 |
2 |
2 |
2 |
2 BHK PREMIERE 1B |
48.56 |
2 |
2 |
3 |
2 BHK PREMIERE 1C |
48.89 |
1 |
1 |
4 |
2 BHK PREMIERE 1D |
49.06 |
1 |
1 |
5 |
3 BHK IMPERIO 3C |
64.44 |
1 |
1 |
6 |
2 BHK CLASSIC 3B |
45.76 |
26 |
26 |
7 |
2 BHK PREMIERE 1A |
48.46 |
24 |
24 |
8 |
3 BHK IMPERIO 3A |
62.42 |
10 |
10 |
9 |
3 BHK IMPERIO 3B |
62.49 |
14 |
14 |
10 |
3 BHK SUPREME 1A |
81.51 |
2 |
2 |
11 |
3 BHK SUPREME 1B |
81.59 |
4 |
4 |
12 |
3 BHK SUPREME 1C |
81.72 |
7 |
6 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
90
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
40
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
0
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
0
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
0
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
0
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
23
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
4 |
L AND T SEAWOODS RESIDENCES PHASE I
|
TOWER D07
|
31/12/2023
|
2
|
1
|
0
|
15
|
0 |
0 |
143 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2 BHK PREMIERE 3E |
49.66 |
10 |
10 |
2 |
2 BHK CLASSIC 5A |
43.83 |
1 |
1 |
3 |
2 BHK CLASSIC 2C |
45.36 |
6 |
6 |
4 |
2 BHK PREMIERE 3B |
49.05 |
8 |
8 |
5 |
3 BHK IMPERIO 2B |
59.81 |
10 |
10 |
6 |
3 BHK SUPREME 1A |
81.45 |
6 |
6 |
7 |
3 BHK SUPREME 2C |
82.14 |
1 |
1 |
8 |
2 BHK CLASSIC 2D |
45.5 |
6 |
6 |
9 |
2 BHK PREMIERE 3D |
49.21 |
6 |
6 |
10 |
2 BHK ELEGANTE 1B |
50.2 |
1 |
1 |
11 |
2 BHK PREMIERE 3A |
48.25 |
1 |
1 |
12 |
2 BHK CLASSIC 5C |
48.83 |
11 |
11 |
13 |
2 BHK CLASSIC 5D |
48.92 |
2 |
2 |
14 |
2 BHK CLASSIC 5F |
49.11 |
4 |
4 |
15 |
2 BHK PREMIERE 3C |
49.1 |
1 |
1 |
16 |
2 BHK CLASSIC 5E |
49.05 |
9 |
9 |
17 |
3 BHK SUPREMIE 2B |
81.45 |
4 |
4 |
18 |
3 BHK IMPERIO 1 |
58.63 |
2 |
2 |
19 |
3 BHK IMPERIO 2A |
59.69 |
1 |
1 |
20 |
2 BHK ELEGANTE 1A |
49.82 |
10 |
10 |
21 |
2 BHK CLASSIC 5B |
44.04 |
1 |
1 |
22 |
2 BHK PREMIERE 3F |
52.51 |
1 |
1 |
23 |
3 BHK SUPREME 2A |
79.05 |
2 |
2 |
24 |
Shop |
113.99 |
1 |
0 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
90
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
65
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
0
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
0
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
0
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
35.5
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
5 |
L AND T SEAWOODS RESIDENCES PHASE I
|
TOWER D08
|
31/12/2023
|
2
|
1
|
0
|
15
|
0 |
0 |
173 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
3 BHK GRANDIO 5A |
74.10 |
12 |
12 |
2 |
3 BHK GRANDIO 6A |
75.16 |
6 |
6 |
3 |
3 BHK GRANDIO 5B |
74.25 |
2 |
2 |
4 |
3 BHK GRANDIO 6B |
75.50 |
6 |
6 |
5 |
3 BHK SUPREME 2D |
83.60 |
4 |
4 |
6 |
3 BHK SUPREME 2E |
84.96 |
1 |
1 |
7 |
2 BHK ELEGANTE 2A |
53.08 |
1 |
1 |
8 |
3 BHK GRANDIO 1 |
74.85 |
6 |
6 |
9 |
3 BHK GRANDIO 3B |
74.98 |
1 |
1 |
10 |
3 BHK GRANDIO 5C |
76.13 |
1 |
1 |
11 |
3 BHK GRANDIO 6C |
75.59 |
1 |
1 |
12 |
3 BHK SUPREME 1D |
84.14 |
6 |
6 |
13 |
2 BHK ELEGANTE 4D |
55.99 |
13 |
13 |
14 |
2 BHK ELEGANTE 2B |
53.12 |
13 |
13 |
15 |
3 BHK GRANDIO 3A |
74.89 |
6 |
6 |
16 |
3 BHK GRANDIO 4C |
74.18 |
12 |
12 |
17 |
3 BHK GRANDIO 5D |
76.15 |
1 |
1 |
18 |
Shop |
118.49 |
1 |
0 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
90
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
70
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
0
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
0
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
0
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
36
|
|