MahaRERA Application

General Information

Individual

Individual

Rajesh
Dharamvir
Gulati
Dharamvir Gulati
Yes

Address For Official Communication

Office no 1204/05/06
Maithili Signet
plot no 39/4 , sector 30
Vashi , Navi Mumbai
Inorbit Mall
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
400705

Contact Details

02227811000
www.satyaminfra.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1SATYAM EMPRESSResidentialNA1149.55KHARGHAR104 AND 1051302016-02-292017-04-28
2SATYAM EXOTICAResidentialNA799.72ULWE351242014-12-312015-08-11
3SATYAM IMPERIAL HEIGHTSResidentialNA1154.04ROADPALI591342014-12-312015-11-03
4SATYAM PRIDEResidentialNA799.91ROADPALI53 AND 541222014-12-312015-06-23
5SATYAM MAJESTICResidentialNA1848.45ULWE281532014-12-312016-09-29

Project

SATYAM OASIS
New Project
30/09/2024
No
Others
No
PLOT NO 87 B SECTOR 23
PLOT NO 87 A
20 M WIDE ROAD AND METRO STATION
15 M WIDE ROAD
PLOT NO 87
MAHARASHTRA
Konkan
Raigarh
Panvel
Pendhar
PLOT NO 87B SECTOR 23
TALOJA PHASE 2
410206
2349.90
1
1
0
678.49

FSI Details

0
3523.33
3523.33

Bank Details

TAMILNAD MERCANTILE BANK
TMBL0000117

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 50 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 LATER STAGE
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 LATER STAGE
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 LATER STAGE
CHILDRENS PLAY AREA : YES 0 LATER STAGE
GARDEN : YES 0 LATER STAGE
GYMNASIUM : YES 0 LATER STAGE
Aggregate area of recreational Open Space : YES 0 LATER STAGE
Open Parking : YES 0 LATER STAGE
Water Supply : YES 0 LATER STAGE
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 LATER STAGE
Storm Water Drains : YES 0 LATER STAGE
Landscaping & Tree Planting : YES 0 LATER STAGE
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 SATYAM OASIS SATYAM OASIS 31/03/2024 0 1 3 21 4 7 50
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 47.47 17 0
2 1BHK 30.21 31 0
3 1BHK 30.33 34 0
4 SHOP 26.14 1 0
5 SHOP 24.90 2 0
6 SHOP 61.40 1 0
7 SHOP 29.48 12 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 20

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
STAPL PVT LTD NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other