MahaRERA Application

General Information

Other Than Individual

Organization

EKTA EVERGLADE HOMES PRIVATE LIMITED
Company
NA
Do you have any Past Experience ?
No

Address Details

401
HALLMARK BUSINESS PLAZA
SANT DYANESHWAR MARG
KALANAGAR, BANDRA EAST
OPP. GURUNANAK HOSPITAL
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400051

Organization Contact Details

02261152424
WWW.EKTAWORLD.COM

Past Experience Details

Member Information

Member Name Designation Photo
ASHOK GOBINDRAM MOHANANI Managing Director View Photo
VIVEK ASHOK MOHANANI Authorized Signatory View Photo

Project

EKTA TRIPOLIS PHASE I
On-Going Project
31/12/2020
30/06/2021
30/12/2023
Yes
Residential
No
CTS 22A/10 22A/11A, 22A/14 PT, 2601/1
18-3 METER WIDE ROAD
22A-10 PT 22A-14 PT
13-4 METER WIDE ROAD
12-2 METER WIDE ROAD
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
Road no 8 & 2
Siddharth Nagar
400104
2821.83
2
2
0
1050.81

FSI Details

40356.34
0
40356.34

Bank Details

ICICI BANK LTD
ICIC0001231

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 479 276 40

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 complete
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 100 complete
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 complete
CHILDREN`S PLAY AREA WITH PLAYING EQUIPMENT : YES 50 Work In Progress
CLUB HOUSE : YES 0 for whole project & to be handed over to apex body
E Charging Car Point : YES 0 Work In Progress
GYMNASIUM WITH FITNESS EQUIPMENT TO BE PART OF THE CLUB HOUSE : YES 50 RCC Complete. Internal finishing in progress
INDOOR GAMES ZONE with games like table tennis,chess & it will be a part of CLUB HOUSE. : YES 75 RCC Complete. Internal finishing in progress
JOGGING and WALKING TRACK : YES 0 for whole project & to be handed over to apex body
KIDS POOL of 20 feet x 12 feet : YES 75 RCC Complete. Internal finishing in progress
LAWN : YES 75 In Progress
MEDITATION & TRANQUILITY GARDEN : YES 75 In progress
Mini Open Amphitheatre : YES 0 To be complete in phase II
MULTIPURPOSE COURT : YES 0 for whole project & to be handed over to apex body
OPEN JACUZZI : YES 75 RCC Complete. Internal finishing in progress
OUTDOOR CHESS BOARD : YES 0 To be complete in phase ii
POOL DECK is provided along the swimming pool : YES 0 for whole project & to be handed over to apex body
SEATING AREAS FORMING PART OF THE LANDSCAPE : YES 100 RCC Complete. Internal finishing in progress
SENIOR CITIZEN GARDEN : YES 0 for whole project & to be handed over to apex body
SHADE SHELTER : YES 0 for whole project & to be handed over to apex body
SNOOKER TABLE PART OF THE CLUB HOUSE : YES 0 for whole project & to be handed over to apex body
SQUASH COURT of size 9m x 6m will be in Club House : YES 75 RCC Complete. Internal finishing in progress
SWIMMING POOL of size 25m x 9m : YES 75 RCC Complete. Internal finishing in progress
SWINGING CORNER : YES 0 for whole project & to be handed over to apex body
TRELLIS ON PERGOLAS ABOVE DECK : YES 100 COMPLETED
WATER FEATURE PART OF LANDSCAPE : YES 0 To be complete in phase II
Aggregate area of recreational Open Space : YES 50 Work In Progress
Open Parking : NO 0 NA
Water Supply : YES 95 External Connection Balance
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 95 STP Complete. Connection pending.
Storm Water Drains : YES 100 complete
Landscaping & Tree Planting : YES 60 Work in progress
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 95 Only Connection Balance.
Solid Waste Management And Disposal : YES 95 Only Connection Balance.

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 EKTA TRIPOLIS PHASE I WING A 31/12/2020 1 1 3 38 1 12 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 BHK TYPE 1 80.06 70 60
2 2BHK 67.60 61 58
3 3 BHK TYPE 2 95.76 70 69
4 SHOP NO 1 2 164.47 1 1
5 SHOP NO 3 62.96 1 1
6 SHOP NO 4 77.1 1 1
7 SHOP NO 5 46.62 1 1
8 SHOP NO 6 59.1 1 1
9 SHOP NO 7 80.69 1 1
10 SHOP NO 8 81.35 1 1
11 SHOP NO 9 63.28 1 1
12 SHOP NO 10 63.28 1 1
13 SHOP NO 11 63.28 1 1
14 SHOP NO 12 86.98 1 1
15 SHOP NO 13 62.76 1 1
16 SHOP NO 14 15 41.51 1 1
17 SHOP NO 16 17 41.51 1 1
18 SHOP NO 18 19 41.51 1 1
19 SHOP NO 75 53 1 0
20 SHOP NO 76 54.64 1 1
21 SHOP NO 77 54.55 1 1
22 SHOP NO 78 54.2 1 1
23 SHOP NO 101 102 171 1 1
24 SHOP NO 103 178 1 0
25 SHOP NO 104 101.89 1 0
26 SHOP NO 105 111.85 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 96
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 12
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 97
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
11 Overall Percentage of Completion of the work done For the entire Building /Wing 87.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 EKTA TRIPOLIS PHASE I WING B 31/12/2020 1 1 3 38 1 23 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 BHK TYPE 1 80.06 70 69
2 3 BHK TYPE 2 95.76 70 67
3 3 BHK TYPE 3 104.56 1 0
4 4 BHK TYPE 2 144.69 1 0
5 2 BHK 67.60 61 58
6 4 BHK TYPE 1 122.84 1 0
7 SHOP NO 20 21 41.51 1 1
8 SHOP NO 22 23 41.51 1 1
9 SHOP NO 24 25 41.51 1 1
10 SHOP NO 26 27 38.24 1 1
11 SHOP NO 28 33.84 1 1
12 SHOP NO 29 30 41.51 1 1
13 SHOP NO 31 32 41.51 1 1
14 SHOP NO 33 34 41.26 1 0
15 SHOP NO 35 36 40.52 1 0
16 SHOP NO 37 38 41.51 1 1
17 SHOP NO 39 40 41.51 1 0
18 SHOP NO 41 42 41.51 1 0
19 SHOP NO 43 44 41.51 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 93
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 12
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 96
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
11 Overall Percentage of Completion of the work done For the entire Building /Wing 87.1

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SPACE MODULERS NA Architect
JW CONSULTANTS LLP NA Engineer
ICICI Home Finance Company Limited A51800000727 Real Estate Agent
JONES LANG LASALLE RESIDENTIAL PRIVATE LIMITED A51900000108 Real Estate Agent
HDFC Realty Limited A51900000107 Real Estate Agent
Mumbai Property Exchange Pvt Ltd A51900000211 Real Estate Agent
RAVI MOHAN GEHI A51800002016 Real Estate Agent
Property Buyers Club LLP A51900000915 Real Estate Agent
SUNNY RAMESH PUNJABI A51800000191 Real Estate Agent
RIDDHI SIDDHI HOUSING LLP A51800001069 Real Estate Agent
Bobby John A51800000345 Real Estate Agent
Karan Suraj Bathija A51800000353 Real Estate Agent
Divya Housing Agency A51800001059 Real Estate Agent
SQUARE FEET PROPERTY CONSULTANT PRIVATE LIMITED A51800000818 Real Estate Agent
B E BILLIMORIA AND CO LTD NA Contractor
REZA KABUL ARCHITECTS NA Architect
B KANDHARI PROPERTIES LLP A51800003272 Real Estate Agent
Real Deal Housing Private Limited A51800000540 Real Estate Agent
The Corporate Real Estate World A51900001462 Real Estate Agent
Property Buyers Club LLP A51900000915 Real Estate Agent
Sagar Suresh Pishori A51800000472 Real Estate Agent
GODREJ & BOYCE MFG CO LTD NA Contractor
CANTER ENGINEERS PVT LTD NA Contractor
REZA KABUL ARCHITECTS NA Other Professional
VIKAS BHOSEKAR NA Other Professional
JM Financial Products Limited A51900000277 Real Estate Agent
RAHEJA ESTATE AGENCY A51800003110 Real Estate Agent
MumbaiProperties Consulting Private Limited A51800000606 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
EKTA TRIPOLIS PHASE I City civil court Dindoshi 536 Civil Yes Suit NA 2017 Disposed off
EKTA TRIPOLIS PHASE I Bombay High Court 175 Civil Yes Suit NA 2018 Pending
EKTA TRIPOLIS PHASE I Bombay High Court 513 Civil Yes Writ Petition NA 2023 Pending
EKTA TRIPOLIS PHASE I Bombay High Court 513 Civil Yes Writ Petition NA 2023 Pending

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 a Details of encumbrances concerned to Finance
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
7 Disclosure of sold/ booked inventory
8 Disclosure of sold/ booked inventory
9 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
4 Other
5 Other
6 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC006000000000113 KARISHMA PATEL View Orders
2 CC006000000012703 Suresh V Tahilramani View Orders
3 CC006000000054656 Vidur Sarin View Orders
4 CC006000000056721 Digant Nandlal Thakkar View Orders
5 CC006000000057923 VIDUR SARIN View Orders
6 CC006000000089941 Suresh Tahilramani View Orders
7 CC006000000090164 DEEPA JETHO BHATIA View Orders
8 CC006000000151216 Chander Sen Khanchandani View Orders
9 CC006000000151216 Jyoti Khanchandani View Orders
10 CC006000000161434 Mohammad Naimur Rehman & Tarrannum Mohammad Naimur Rehman View Orders
11 CC006000000161455 1 Anand H Dubey, 2 Manisha Dubey, 3 Harish D Dubey, 4 Shahsi H Dubey View Orders
12 CC006000000171529 Bhavesh Shah View Orders
13 CC006000000171797 Ashwin Gedam View Orders
14 CC006000000192835 Amit Misra View Orders
15 CC006000000192977 Wayne Jordan Saldanha View Orders
16 CC006000000192977 Marilyn Theresa Saldanha View Orders
17 CC006000000193895 TANU BHARTI View Orders
18 CC006000000194343 BHASKAR AND ARPITA CHAKRABORTY View Orders
19 CC006000000194799 Harkishan Mohanlal Malkan and Chetan Harkishan Malkan View Orders
20 CC006000000195024 Yogendrasinh Yashvantsinh Vansia HUF View Orders
21 CC006000000195024 Yogendrasinh Yashvantsinh Vansia HUF View Orders
22 CC006000000195507 Anjan Kumar and Jaya Kumar View Orders
23 CC006000000195508 N D Krishnaprakash Iyer and Vidya Iyer View Orders
24 CC006000000198875 Mr Pawan Koyal and Mrs Sangita Koyal View Orders
25 CC006000000209428 EKTA EVERGLADE HOMES PRIVATE LIMITED View Orders
26 CC006000000209554 KAMLESH YADAV View Orders
27 CC006000000209758 Mr Sonik Nirmal Puri & Mrs Veronica Sonik Puri View Orders
28 CC006000000209940 Mr Pradeep Gopal Krishnan & Mrs Vilasini Subramaniam View Orders
29 CC006000000210483 Mr Pankaj Verma & Mrs Seema Verma View Orders
30 CC006000000210520 Mrs Jyoti Sunil Chaudhari & Mr Sunil Anandrao Chaudhari View Orders
31 CC006000000220625 Jaikishan Ganesh Kacherla View Orders
32 CC006000000220673 Reju Gopal Nair View Orders
33 CC006000000220734 Mr Sandeep Kaura And Mrs Beenu Malhotra Kaura View Orders
34 CC006000000220741 Sanket Shah View Orders
35 CC006000000220750 Mr Rajan Chhabria And Mrs Sanya Chhabria View Orders
36 CC006000000251435 Haresh A. Khilnani View Orders
37 CC006000000251435 Pinky H. Khilnani View Orders
38 CC006000000251552 SS Joseph Subbu Reddi View Orders
39 CC006000000282207 Chandravadan M Mistry View Orders
40 CC006000000292768 Lucas Rodrigues View Orders
41 CC006000000292769 Lucas Rodrigues View Orders
42 CC006000000292769 Elsa Rodrigues View Orders
43 CC006000000303212 Chandrakant Annaji Patil View Orders
44 CC006000000303214 Sheetal Chandrakant Patil View Orders
45 CC006000000303547 Ananthakrishnan Vishwanathan View Orders
46 CC006000000303547 Geeta Ananthakrishnan View Orders
47 CC006000000303743 Amit Kumar Ramesh Kumar Jalan View Orders
48 CC006000000303728 Nitu Sanjeev Seth View Orders
49 CC006000000374767 Seema Narain Shroff View Orders
50 CC006000000374767 Mr. Narain Motumal Shroff View Orders
51 CC006000000374767 Ms. Vinny Shroff View Orders
52 CC006000000374767 Mr. Mohit Shroff View Orders
53 CC006000000374786 Abhishek Shaw View Orders
54 CC006000000374786 Neha Mehta View Orders
55 CC006000000375402 VINIT PADIA View Orders
56 CC006000000395738 Jigna Bhavesh Shah View Orders
57 CC006000000395738 BHAVESH SHAH View Orders