MahaRERA Application

General Information

Other Than Individual

Organization

ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP)
Company
NA
Do you have any Past Experience ?
Yes

Address Details

SURVEY 83/A/4A
CODE NAME GREENS
MUNDWA
MUNDWA
PUNE
MAHARASHTRA
Pune
Pune
Pune City
Keshavnagar-Mundwa
411036

Organization Contact Details

02266881155

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1INSPIRE BKC PHASE 1 GROUND TO FORTH FLOORCommercialNA12395.36VILLAGE KOLE KALYAN OPP ICICI BANK NEAR MAHANAGAR GAS LTD BANDRA KURLA COMPLEX BANDRA E MUMBAI 4000517643 PART 5370 PART 4207 PART1612017-12-312017-10-16
2INSPIRE BKC PHASE 2 SIXTH AND SEVENTH FLOORCommercialNA12395.36VILLAGE KOLE KALYAN OPP ICICI BANK NEAR MAHANAGAR GAS LTD BANDRA KURLA COMPLEX BANDRA E 4000517643 PART 5370 PART 4207 PART1112017-12-312017-10-16
3WESTERN HEIGHTS - PHASE 1 RESIDENTIALResidentialNA7547.51JP ROAD OPP GURU DWARA FOUR BUNGALOWS ANDHERI WEST MUMBAI 400058866/B/114202018-06-302018-12-31
4WESTERN HEIGHTS PHASE 2 COMMERCIAL 1ST AND 2ND FLOORCommercialNA7547.51JP ROAD OPP GURU DWARA FOUR BUNGALOWS ANDHERI WEST MUMBAI 400058866/B/11442018-06-302018-12-31
5Meadows A,B AND CResidentialNA24476Shantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421318, 319, 320, 345-P AND 32635122018-06-302018-06-30
6Meadows D,E AND FResidentialNA23109Shantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421318, 319, 320, 345P AND 32636122018-06-302018-06-30
7Meadows G,H AND IResidentialNA21701.31Shantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421318, 319, 320, 345P AND 32634402017-12-312017-12-31
8Meadows J AND KResidentialNA14301.18Shantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421318, 319, 320, 345P AND 32623652017-12-312017-12-31
9WATERLILY PHASE 2ResidentialNA9738Shantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421385 TO 388, 389, 392, 393, 397 AND 32641722017-12-312017-12-31
10WATERLILY PHASE 3ResidentialNA8967Shantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421385 TO 388, 389, 392, 393, 397 AND 32621202017-12-312017-12-31
11WATERLILIY PHASE 4ResidentialNA21473Shantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421385 TO 388, 389, 392, 393, 397 AND 32641722018-06-302018-06-30
12SHOPPERS PLAZACommercialNA6350Shantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421327P1852017-03-312017-03-31

Member Information

Member Name Designation Photo
AJAY AMARCHAND MUNOT Authorized Signatory View Photo
AJAY AMARCHAND MUNOT Director View Photo

Project

ATELIER GREENS
New Project
30/09/2023
Yes
Residential
No
83A/4A
CTS NO 1275 PART
CTS NO 1283 PART
CTS NO 1279 PART
ROAD
MAHARASHTRA
Pune
Pune
Pune City
Keshavnagar-Mundwa
NORTH MAIN ROAD
MUNDWA
411036
12100
7
6
1
1114.41

FSI Details

2500
30075
32575.00

Bank Details

AXIS BANK
UTIB0003414

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 468 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 NA
Water Conservation, Rain water Harvesting : YES 0 NA
Energy management : YES 0 NA
Fire Protection And Fire Safety Requirements : YES 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 NA
Aggregate area of recreational Open Space : YES 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 NA
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 NA
Storm Water Drains : YES 0 NA
Landscaping & Tree Planting : YES 0 NA
Street Lighting : YES 0 NA
Community Buildings : YES 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 NA
Solid Waste Management And Disposal : YES 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 ATELIER GREENS TOWER A1 30/09/2023 2 0 0 12 1 0 92
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2.5 BHK 97.97 10 0
2 2 BHK 83.98 10 0
3 1 BHK 47.42 1 0
4 2 BHK 69.85 1 0
5 3 BHK 100.05 1 0
6 3 BHK 105.01 1 0
7 2 BHK 72.90 1 0
8 2 BHK 69.40 1 0
9 3 BHK 98.65 1 0
10 3 BHK 103.59 1 0
11 2 BHK 72.44 1 0
12 2.5 BHK 93.49 10 2
13 2 BHK 72.48 4 3
14 2 BHK 72.53 5 1
15 2 BHK 81.68 10 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 ATELIER GREENS TOWER A2 30/09/2023 2 0 0 12 1 0 93
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 84.73 9 0
2 2.5 BHK 100.91 9 0
3 2 BHK 80.49 3 0
4 2 BHK 80.52 5 0
5 2.5 BHK 100.92 9 0
6 2 BHK 84.74 9 0
7 1 BHK 52.74 1 0
8 2 BHK 72.90 1 0
9 3 BHK 111.02 1 0
10 3 BHK 112.82 1 0
11 2 BHK 72.90 1 0
12 2 BHK 72.45 1 0
13 3 BHK 110.08 1 0
14 3 BHK 111.40 1 0
15 2 BHK 72.44 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 ATELIER GREENS TOWER A3 30/09/2023 2 0 0 12 1 0 101
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 89.77 3 0
2 2.5 BHK 102.35 9 0
3 2.5 BHK 94.69 9 0
4 1 BHK 61.56 1 0
5 2 BHK 72.90 1 0
6 3 BHK 124.19 1 0
7 3 BHK 122.95 1 0
8 2 BHK 79.46 1 0
9 2 BHK 72.45 1 0
10 3 BHK 123.24 1 0
11 3 BHK 121.97 1 0
12 2 BHK 78.99 1 0
13 2.5 BHK 109.51 9 3
14 2 BHK 84.73 9 2
15 2 BHK 89.73 5 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 ATELIER GREENS TOWER B1 30/09/2023 2 0 0 12 1 0 67
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 BHK 105.09 1 0
2 3 BHK 105.66 1 0
3 3 BHK 104.63 1 0
4 1 BHK 71.49 1 0
5 2.5 BHK 87.12 10 2
6 2.5 BHK 91.77 10 1
7 2.5 BHK 92.20 9 1
8 3 BHK 106.12 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 ATELIER GREENS TOWER B2 30/09/2023 2 0 0 12 1 0 67
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2.5 BHK 89.79 10 0
2 2.5 BHK 98.67 9 0
3 1 BHK 74.97 1 0
4 3 BHK 111.70 1 0
5 3 BHK 112.29 1 0
6 3 BHK 110.70 1 0
7 2.5 BHK 93.20 10 1
8 3 BHK 112.75 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 ATELIER GREENS TOWER C 30/09/2023 2 0 0 12 1 0 48
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 BHK 151.43 9 0
2 3 BHK 133.83 1 0
3 3 BHK 120.85 1 0
4 3 BHK 125.02 1 0
5 3 BHK 120.85 1 0
6 3 BHK 124.44 1 0
7 3 BHK 154.24 10 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
7 ATELIER GREENS LIG TOWER 30/09/2023 2 0 0 11 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 46.68 42 0
2 2 BHK 72.84 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
VOUSSOIRS NA Architect
JW CONSULTANTS LLP NA Structural Engineer
PROPERTY CHEF CONSULTING SERVICES A52100000044 Real Estate Agent
Lalitkumar Chhaganlal Jain A52100001922 Real Estate Agent
MOHIT SINHA A52100012759 Real Estate Agent
Nimbleland Infracon LLP A52100004080 Real Estate Agent
PRERANA VENTURES LLP A52100001056 Real Estate Agent
Premlata Landmarks LLP A52100013295 Real Estate Agent
VIKAS SATISH GUPTA A52100002607 Real Estate Agent
DEEPA MAHENDRA MISHRA A52100008204 Real Estate Agent
Vijay Anand A52100000084 Real Estate Agent
CORAZON HOMES AND SECURITIES A52100000096 Real Estate Agent
Mr Ganeshkumar Somla Jadhav A52100004136 Real Estate Agent
FULL BASKET PROPERTY SERVICES PRIVATE LIMITED A52100005036 Real Estate Agent
Sudhir Patil A52100013283 Real Estate Agent
Saideep Satish Patil A52100013984 Real Estate Agent
PROPOZONE TECHNOLOGIES PRIVATE LIMITED A52100002247 Real Estate Agent
WISTERIA REAL VISION PVT LTD A52100003089 Real Estate Agent
Vikram Bajaj A52100000503 Real Estate Agent
Risshi Tandoan A52100006769 Real Estate Agent
SHAMSUDDIN BADRUDDIN PIRANI A52100003812 Real Estate Agent
AMIT BABANRAO GAIKI A52100002350 Real Estate Agent
ACCORD ASSOCIATES A52100008789 Real Estate Agent
PROPERTY PLAN IT A52100005890 Real Estate Agent
Shalini Ravi Varma A52100000047 Real Estate Agent
PROPBUYING REALTORS PVT LTD A52100000476 Real Estate Agent
Devender Singh Pawar A52100012716 Real Estate Agent
M/s. Enviro Analysts and Engineers Private Limited NA
Artech Engineering Solutions NA

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
ATELIER GREENS DIVISIONAL OFFICER PUNE 494 Civil No Appeal 2014 ORDER AWAITED
NA
ATELIER GREENS CIVIL JUDGE SENIOR DIVISION 445 Civil Yes Suit 2016 Order passed that till final disposal of main suit defendant is restrained frm recovery
ATELIER GREENS CIVIL JUDGE SENIOR DIVISION 508 Civil No Suit 2013 NOTICE NOT SERVED
NA

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other