MahaRERA Application

General Information

Other Than Individual

Organization

KOLTE-PATIL DEVELOPERS LIMITED
Company
NA
Do you have any Past Experience ?
Yes

Address Details

2ND FLOOR
CITY POINT
DHOLE PATIL ROAD
PUNE
17 BOAT CLUB ROAD
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411001

Organization Contact Details

02066226500

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1GlitteratiOthersResidential and Commercial55463Pimple Nilakh Pune - 41101414 Part61872016-04-302016-04-13
2City BayCommercialNA11636.22Dhole-Patil road Pune-411001FP no 1881272014-04-302014-04-30

Member Information

Member Name Designation Photo
VINAYAK JOGDEO Authorized Signatory View Photo
Milind Digambar Kolte Authorized Signatory View Photo

Project

EVARA
New Project
30/10/2024
Yes
Others
No
F P No 761, TPS-III
FP No 763
FP No 760
Ramchandra M Bhattad Road
FP No 762
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Borivali
Borivali
Borivali
400092
2505.60
4
2
2
512.19

FSI Details

2412.49
6036.84
8449.33

Bank Details

Axis Bank Limited
UTIB0000230

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 37 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 35 Internal Roads in Tremix
Water Conservation, Rain water Harvesting : YES 0 Paver Blocks and tiles
Energy management : YES 0 as per design & drawing of consultant
Fire Protection And Fire Safety Requirements : YES 20 as per design & drawing of consultant
Electrical Meter Room, Sub-Station, Receiving Station : YES 25 as per provisional Fire NOC received from Fire Dep
Fitness Centre : YES 15 excluding substation and receiving station
Aggregate area of recreational Open Space : YES 0 as per design & drawing of consultant
Open Parking : NO 0 Yet to be started
Water Supply : YES 70 NA
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 90 preconstrcution water tankers and post by MCGM
Storm Water Drains : YES 80 asper design& drawing of consultant excluding stp
Landscaping & Tree Planting : YES 15 as per design & drawing of consultant
Street Lighting : YES 30 as per design & drawing of consultant
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : YES 25 as per design & drawing of consultant

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 EVARA A Wing - Ground to 2nd Floor 30/04/2024 0 1 3 6 1 0 18
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1st Floor Shop 72.42 1 1
2 Shop store toilet 8.27 1 1
3 Ground Floor Shop 46.92 1 1
4 Ground Floor Shop 73.14 1 1
5 Ground Floor Shop 59.55 1 1
6 1st Floor Shop 46.73 1 1
7 1st Floor Shop 41.07 1 1
8 Ground Floor Shop 58.31 1 1
9 1st Floor Shop 39.18 1 1
10 Shop Store Toilet 7.59 1 1
11 Shop Toilet 4.42 1 1
12 Shop Store Toilet 5.71 1 1
13 1BHK 43.08 1 1
14 2BHK 56.21 1 1
15 1st Floor Shop 35.24 1 1
16 2BHK 56.70 2 2
17 Ground Floor Shop 66.17 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 33
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

55
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
11 Overall Percentage of Completion of the work done For the entire Building /Wing 65.8
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 EVARA A wing - 3rd to 16th Floor 30/04/2024 0 0 0 14 0 0 58
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 56.21 14 14
2 2BHK 56.7 26 26
3 1BHK 43.08 14 14
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
11 Overall Percentage of Completion of the work done For the entire Building /Wing 32
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 EVARA B Wing - Ground to 2nd Floor 30/04/2024 0 1 3 6 1 0 19
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop Toilet 1.34 1 1
2 Ground Floor Shop 47.07 1 1
3 Ground Floor Shop 63.67 1 1
4 1st Floor Shop 86.11 1 1
5 1st Floor Shop 61.01 1 1
6 Ground Floor Shop 63.86 1 1
7 Ground Floor Shop 94.63 1 1
8 Ground Floor Shop 41.81 1 1
9 1st Floor Shop 38.37 1 1
10 1st Floor Shop 48.93 1 1
11 Shop Toilet 2.39 1 1
12 1st Floor Shop 35.75 1 1
13 Shop store toilet 8.27 1 1
14 2BHK 57.17 1 1
15 2BHK 56.70 2 2
16 2.5 BHK 69.70 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 80
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 33
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

55
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
11 Overall Percentage of Completion of the work done For the entire Building /Wing 63.8
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 EVARA B Wing - 3rd to 16th Floor 30/04/2024 0 0 0 14 0 0 57
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 59.61 2 2
2 3BHK 81.23 1 1
3 2BHK 57.17 13 13
4 2BHK 56.7 25 25
5 2.5 BHK 69.7 12 12
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

60
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 30
11 Overall Percentage of Completion of the work done For the entire Building /Wing 32

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
BNM Associates & Architects NA Architect
Umang Shah NA Engineer
CA Nikita A Bajaj NA Chartered Accountant
JW Consultant LLP NA Other Professional
Manisha Lifespaces Consulting Pvt. Ltd. A51800008040 Real Estate Agent
360 REALTORS LLP A51900000246 Real Estate Agent
KISHORE JAIPRAKASH VYAS A51700008031 Real Estate Agent
Aasha Realtors A51800001005 Real Estate Agent
PERPETUAL ESTATES A51800002681 Real Estate Agent
Avinash Bhomia A51800002235 Real Estate Agent
DHRUHI REALTY LLP A51800006076 Real Estate Agent
Nikhil Paresh Dubal A51800003285 Real Estate Agent
Dipesh H Vora Estate Agent A51800002214 Real Estate Agent
PARAS ESTATE & FINANCE CONSULTANT A51700006339 Real Estate Agent
Asset zone A51800002657 Real Estate Agent
VD Realty A51800003227 Real Estate Agent
SKYLIGHT ADVISORS PRIVATE LIMITED (OPC) A51800001249 Real Estate Agent
DRILLTECH ENGINEERS PVT. LTD. NA Contractor
Generic Engineering & Construction Pvt. Ltd. NA Contractor
JM Financial Products Limited A51900000277 Real Estate Agent
Keyur Hasmukhlal Parekh A51800002834 Real Estate Agent
Navinchandra Bharakhda A51900002608 Real Estate Agent
SQUARE FEET PROPERTY CONSULTANT PRIVATE LIMITED A51800000818 Real Estate Agent
VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS NA Chartered Accountant

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
EVARA Arbitration before the Sole Arbitrator Mr Gautam Mehta Arbitration 2016 Civil No Other Hitech Hafizi Town A Developer vs Om Shree Gokul CHS 2016 cross examination of Claimant witnesses pending
NA
EVARA City Civil Court Dindoshi 0200983 of 2020 Civil No Suit NA 2020 Pending
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
7 Disclosure of sold/ booked inventory
8 Disclosure of sold/ booked inventory
1 CERSAI details
2 CERSAI details
3 CERSAI details
4 CERSAI details
5 CERSAI details
6 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
4 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement