MahaRERA Application

General Information

Other Than Individual

Organization

Bharat Builders and Developers
Partnership
NA
Do you have any Past Experience ?
No

Address Details

B wing, 1st floor
Bharat Bazar
API compound
Chikalthana
near Prozone Mall
MAHARASHTRA
Aurangabad
Aurangabad
Aurangabad
Aurangabad (M Corp.)
431001

Organization Contact Details

02402481519

Past Experience Details

Member Information

Member Name Designation Photo
Aditya Agrawal Authorized Signatory View Photo
RUPESH SITARAM AGRAWAL Partner View Photo
SITARAM RATANLAL AGRAWAL Partner View Photo

Project

CITY PLAZA
New Project
30/06/2026
No
Commercial
No
GUT NO 184 AND OTHERS
A PLOT BOUNDARY WALL
30 M WIDE ROAD
DRIVE WAY
DRIVE WAY
MAHARASHTRA
Pune
Pune
Khed
Kharabwadi (CT)
CHAKAN TALEGAON ROAD
CHAKAN
410501
11276.54
3
3
0
0.00

FSI Details

13264.29
267.56
13531.85

Bank Details

JANATA SAHAKARI BANK
JSBP0000040

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 00 00 00
Covered Parking ( In Numbers) 44 00 00

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 TRIMIX ROADS
Water Conservation, Rain water Harvesting : YES 0 AS PER NORMS
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 AS PER FIRE NOC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 METER ROOM AND REST AS PER MSEDCL SANCTION
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 OPEN PARKING
Water Supply : YES 0 GRAMPANCHAYAT WATER SUPPLY
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 AS PER PLUMBING CONSULTANT
Storm Water Drains : YES 0 AS PER PLUMBING CONSULTANT
Landscaping & Tree Planting : YES 0 AS PER LANDSCAPE DESIGNER
Street Lighting : YES 0 AS PER ELECTRICAL CONSULTANT
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 SEWAGE TREATMENT PLANT
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 CITY PLAZA A BLOCK 30/06/2025 0 1 0 7 1 0 22
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Third Floor 16.72 4 4
2 Second Floor 13.42 8 8
3 Third Floor 13.42 8 8
4 Lower Ground 12.08 2 2
5 Upper Ground 14.7 10 10
6 Lower Ground 14.96 4 4
7 Upper Ground 15.28 2 2
8 Upper Ground 15.67 2 2
9 Second Floor 15.67 2 2
10 Upper Ground 16.72 4 3
11 Lower Ground 14.02 2 2
12 Lower Ground 14.7 10 9
13 First Floor 14.7 10 10
14 LowerGround 13.42 8 8
15 Upper Ground 13.42 8 8
16 Second Floor 16.72 4 4
17 Second Floor 15.28 2 2
18 Third Floor 15.28 2 2
19 First Floor 15.67 2 2
20 Third Floor 15.67 2 2
21 First Floor 16.72 4 4
22 First Floor 13.42 8 8
23 Second Floor 14.7 10 10
24 Third Floor 14.7 10 10
25 First Floor 15.28 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
11 Overall Percentage of Completion of the work done For the entire Building /Wing 81
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 CITY PLAZA B BLOCK 30/06/2025 0 1 0 7 1 0 22
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Second Floor 9.29 3 3
2 First Floor 15.67 17 17
3 Third Floor 14.56 2 2
4 Third Floor 9.29 3 3
5 First Floor 16.78 2 2
6 First Floor 14.56 2 2
7 Second Floor 14.56 2 2
8 Second Floor 16.78 2 2
9 Third Floor 16.78 2 2
10 First Floor 18.91 4 4
11 Second Floor 18.91 4 4
12 Third Floor 18.91 4 4
13 Firt Floor 13.42 20 20
14 Second Floor 13.42 20 20
15 Lower Ground 4.8 3 3
16 First Floor 9.29 3 3
17 Upper Ground 16.78 2 2
18 Third Floor 15.67 17 17
19 Lower Ground 14.56 2 2
20 Upper Ground 14.56 2 2
21 Lower Ground 13.42 20 20
22 Lower Ground 16.93 1 1
23 Lower Ground 18.91 3 3
24 Upper Ground 13.42 20 20
25 Lower Ground 16.78 2 2
26 Lower Ground 15.67 17 16
27 Upper Ground 18.91 4 4
28 Third Floor 13.42 20 20
29 Upper Ground 9.29 3 1
30 Second Floor 15.67 17 17
31 Upper Ground 15.67 17 17
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 50
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
11 Overall Percentage of Completion of the work done For the entire Building /Wing 81
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 CITY PLAZA BLOCK C 30/06/2025 0 1 0 6 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Lower Ground 13.42 25 23
2 First Floor 13.42 25 25
3 Second Floor 13.42 25 25
4 Upper Ground 15.67 17 13
5 First Floor 15.67 17 17
6 Second Floor 15.67 17 17
7 Third Floor 15.67 17 17
8 Upper Ground 13.42 25 25
9 Lower Ground 15.67 10 10
10 Third Floor 13.42 25 25
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 87

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
APPA NARSALE NA Contractor
DESIGN ARCHITECT ADVANTAGE ARCHITECT NA Architect
LISIONING ARCHITECT ABS ARCHITECT NA Architect
RAHUL PAWAR NA Engineer
M B JAJU NA Chartered Accountant
RATTCON INFRATECH PRIVATE LIMITED A52100021582 Real Estate Agent
AJEET KUMAR PANDEY A52100013889 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
4 Building Plan Approval / NA Order for plotted development
5 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)
1 Proforma of Agreement for sale
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement