MahaRERA Application

General Information

Individual

Individual

VINOD
PREMCHAND
CHANDWANI
PREMCHAND MANUMAL CHANDWANI
Yes

Address For Official Communication

sno 130,131
ROSELAND RESIDENCY
PIMPLE SAUDAGAR
PIMPLE SAUDAGAR
NEAR PERIWINKLE CLUB
MAHARASHTRA
Pune
Pune
Haveli
Pimpale Saudagar
411027

Contact Details

02027201313

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1BLUE BELLSResidentialNA4000GAT NO 127 BORADEWADI MOSHIGAT NO 12731022014-09-302014-09-19
2ROYALE HILLSResidentialNA8800S NO 76 RVET PCMCS NO 7642402016-12-312016-12-08

Project

SILVERLAND RESIDENCY PHASE-1
On-Going Project
31/12/2019
30/12/2021
No
Residential
No
63 2,64 7 RAVET
LAND OF MATE
PART LAND OF GK ASSOCIATES
SENTOSA RESORT
D P ROAD
MAHARASHTRA
Pune
Pune
Haveli
Pimpri Chinchawad (M Corp.)
412101
14808
7
7
0
1461.79

FSI Details

26305.71
1944
28249.71

Bank Details

BANK OF MAHARASHTRA
MAHB0001443

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 597 323 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 AS PER AGREEMENT
Energy management : YES 100 AS PER AGREEMENT
Fire Protection And Fire Safety Requirements : YES 100 AS PER AGREEMENT
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 AS PER AGREEMENT
Aggregate area of recreational Open Space : YES 100 AS PER PLAN
Open Parking : YES 100 AS PER PLAN
Water Supply : YES 100 AS PER AGREEMENT
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 AS PER AGREEMENT
Storm Water Drains : YES 100 AS PER AGREEMENT
Landscaping & Tree Planting : YES 100 AS PER AGREEMENT
Street Lighting : YES 100 AS PER AGREEMENT
Community Buildings : YES 100 AS PER AGREEMENT
Treatment And Disposal Of Sewage And Sullage Water : YES 100 AS PER AGREEMENT
Solid Waste Management And Disposal : YES 100 AS PER AGREEMENT

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 SILVERLAND RESIDENCY PHASE-1 A 31/12/2020 0 1 0 11 1 35 6
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 19.14 1 1
2 SHOP 20.06 1 1
3 SHOP 17.16 1 1
4 SHOP 23.63 1 1
5 SHOP 21.73 1 1
6 1BHK 37.96 9 9
7 1BHK 41.94 10 10
8 1BHK 43.51 10 10
9 1BHK 41.85 10 10
10 SHOP 14.98 1 1
11 SHOP 17.60 1 1
12 SHOP 13.40 1 1
13 SHOP 19.01 6 6
14 1BHK 39.24 9 9
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 SILVERLAND RESIDENCY PHASE-1 B 31/12/2020 0 1 1 13 1 0 123
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 46.91 5 5
2 2BHK 49.83 11 11
3 2BHK 47.65 6 6
4 2BHK 47.72 11 11
5 3BHK 60.67 22 22
6 2BHK 46.94 10 10
7 2BHK 49.95 20 20
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 SILVERLAND RESIDENCY PHASE-1 C 31/12/2020 0 1 1 13 1 10 136
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 45.42 10 10
2 2BHK 51.39 44 44
3 2BHK 45.01 22 22
4 2BHK 45.74 10 10
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 SILVERLAND RESIDENCY PHASE-1 D 31/12/2020 0 1 1 13 1 0 91
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 46.94 10 10
2 3BHK 58.03 22 22
3 2BHK 47.33 11 11
4 2BHK 49.32 11 11
5 2BHK 50.20 11 11
6 2BHK 49.95 20 20
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 SILVERLAND RESIDENCY PHASE-1 E 31/12/2020 0 1 1 13 1 0 84
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 28.33 6 6
2 1BHK 31.37 5 5
3 1BHK 29.08 5 5
4 1BHK 28.17 5 5
5 1BHK 31.53 5 5
6 1BHK 29.23 6 6
7 1BHK 29.91 10 10
8 1BHK 30.07 10 10
9 1BHK 34.98 11 10
10 1BHK 35.06 10 10
11 1BHK 35.03 11 11
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 SILVERLAND RESIDENCY PHASE-1 F 31/12/2020 0 1 1 13 1 0 105
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 31.33 11 11
2 1BHK 28.24 11 11
3 2BHK 42.16 11 11
4 1BHK 33.58 9 9
5 2BHK 47.62 10 10
6 1BHK 33.85 10 10
7 1BHK 30.28 11 11
8 1BHK 32.80 10 10
9 1BHK 32.49 11 11
10 1BHK 32.93 11 11
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
7 SILVERLAND RESIDENCY PHASE-1 G 31/12/2020 0 1 1 10 1 5 52
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 40.93 4 0
2 2BHK 48.01 4 0
3 2BHK 44.89 4 0
4 2BHK 40.80 1 0
5 2BHK 44.72 3 0
6 2BHK 41.23 3 0
7 2BHK 48.06 4 0
8 2BHK 45.19 4 0
9 2BHK 44.52 4 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
RAHUL WEDPATHAK NA Architect
MS G A BHILARE CONSULTANTS PVT LTD NA Engineer
ABHIJIT SAHEBRAO SABBARWAR A52100000382 Real Estate Agent
CORAZON HOMES AND SECURITIES A52100000096 Real Estate Agent
SACHIN SHRIDHAR DESHPANDE A52100006948 Real Estate Agent
JINENDRA BABARAO DURUGKAR A52100007450 Real Estate Agent
VINEET KUMAR A52100013885 Real Estate Agent
KAILASH MORE A52100000417 Real Estate Agent
VINEET KUMAR A52100013885 Real Estate Agent
ABHIJIT SAHEBRAO SABBARWAR A52100000382 Real Estate Agent
Kamlesh Prabhakar Pawar A52100013183 Real Estate Agent
PROPINN PROPERTIES PRIVATE LIMITED A52100011114 Real Estate Agent
MANGESH JAGADALE A52100003518 Real Estate Agent
Dharmendra Kumar Shahi A52100003454 Real Estate Agent
Pin Click Property Management Pvt Ltd. A52100012083 Real Estate Agent
RAVI KUNDANLAL HIRANANDANI A52100004391 Real Estate Agent
SPACEINDIA NEST LLP A52100002248 Real Estate Agent
RAHUL KUMAR CHOUDHARY A52100012237 Real Estate Agent
CORAZON HOMES AND SECURITIES A52100000096 Real Estate Agent
Abhijeet Bhagwan Sabale A52100014389 Real Estate Agent
Ravi Ranjan Kumar Gautam A52100007332 Real Estate Agent
ANIKET GATE A52100006164 Real Estate Agent
Vaibhav Shivaji Jadhaw A52100004052 Real Estate Agent
Preeti Tiwari A52100000400 Real Estate Agent
VAIBHAV BALASAHEB BORKAR A52100012711 Real Estate Agent
IRFAN KHAN PAWAR A52100012496 Real Estate Agent
ANJALI VIKAS TALIKHEDE A52100004525 Real Estate Agent
RAHUL PRAKASH JADHAV A52100005376 Real Estate Agent
AMIT KHANDU KHANDAGALE A52100009165 Real Estate Agent
MYREALTOR A52100005735 Real Estate Agent
Asheesh Mishra A52100004326 Real Estate Agent
ELARA MARKETING SERVICES PRIVATE LIMITED A51700000030 Real Estate Agent
Nikunj Investments and Home Solutions A52100002995 Real Estate Agent
Vijay Ganesh Rai A52100014625 Real Estate Agent
SANGAMESH NIJAGUNI PATIL A52100016128 Real Estate Agent
LIFE SPACE PROPERTY SOLUTIONS PVT LTD A52100000993 Real Estate Agent
Pradip Kundlik Bhosale A52100015474 Real Estate Agent
NestHawk Properties Private Limited A52100015578 Real Estate Agent
MAGIC HOMES A52100002308 Real Estate Agent
Bapusaheb Kondiram Chindhe A52100014102 Real Estate Agent
subodh shukla A52100006838 Real Estate Agent
PROPFINDER INDIA PRIVATE LIMITED A52100004005 Real Estate Agent
ROHIL KUMAR NARAYANRAO MULEY A52100000518 Real Estate Agent
Lokesh kumra A52100006340 Real Estate Agent
Prashant Hukum chand Jain A52100012914 Real Estate Agent
VITTHAL CHANDARRAO KASALE A52100009918 Real Estate Agent
MAYANK BARHOLIA A52100003500 Real Estate Agent
Property Pointer Private Limited A52100000787 Real Estate Agent
Pratibha Sharma A52100014915 Real Estate Agent
SURYAJI DURYODHAN SHRIKHANDE A52100014943 Real Estate Agent
SUPRIYA SACHIN THORAT A52100010369 Real Estate Agent
R-Constellation Pvt. Ltd. A52100000304 Real Estate Agent
FLATONS ADVISORS A52100004415 Real Estate Agent
Pankaj Suryakant Noubade A52300012780 Real Estate Agent
PROPTIGER MARKETING SERVICES PRIVATE LIMITED A51700000030 Real Estate Agent
SANTOSH PANDE A52100014785 Real Estate Agent
Asheesh Mishra A52100004326 Real Estate Agent
MYREALTOR A52100005735 Real Estate Agent
AMIT KHANDU KHANDAGALE A52100009165 Real Estate Agent
RAHUL PRAKASH JADHAV A52100005376 Real Estate Agent
ANJALI VIKAS TALIKHEDE A52100004525 Real Estate Agent
IRFAN KHAN PAWAR A52100012496 Real Estate Agent
VAIBHAV BALASAHEB BORKAR A52100012711 Real Estate Agent
Preeti Tiwari A52100000400 Real Estate Agent
Vaibhav Shivaji Jadhaw A52100004052 Real Estate Agent
ANIKET GATE A52100006164 Real Estate Agent
Ravi Ranjan Kumar Gautam A52100007332 Real Estate Agent
Abhijeet Bhagwan Sabale A52100014389 Real Estate Agent
CORAZON HOMES AND SECURITIES A52100000096 Real Estate Agent
RAHUL KUMAR CHOUDHARY A52100012237 Real Estate Agent
SPACEINDIA NEST LLP A52100002248 Real Estate Agent
RAVI KUNDANLAL HIRANANDANI A52100004391 Real Estate Agent
Pin Click Property Management Pvt Ltd. A52100012083 Real Estate Agent
Dharmendra Kumar Shahi A52100003454 Real Estate Agent
MANGESH JAGADALE A52100003518 Real Estate Agent
PROPINN PROPERTIES PRIVATE LIMITED A52100011114 Real Estate Agent
Kamlesh Prabhakar Pawar A52100013183 Real Estate Agent
SACHIN SHRIDHAR DESHPANDE A52100006948 Real Estate Agent
ABHIJIT SAHEBRAO SABBARWAR A52100000382 Real Estate Agent
KAILASH MORE A52100000417 Real Estate Agent
JINENDRA BABARAO DURUGKAR A52100007450 Real Estate Agent
VINEET KUMAR A52100013885 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
2 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement