MahaRERA Application

General Information

Other Than Individual

Organization

AKHIETCHDEVELOPERS
Partnership
NA
Do you have any Past Experience ?
No

Address Details

SHOP NO-1
PATEL CORNER
PLOT NO-73/6
SECTOR-27
NERUL NAVI MUMBAI
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
400706

Organization Contact Details

02227717865

Past Experience Details

Member Information

Member Name Designation Photo
KHAMRUDDIN SUBHAI PATEL Authorized Signatory View Photo
SHAMSUDDIN SUBHANI PATEL Partner View Photo
AZARUDDIN KHAMRUDDIN PATEL Partner View Photo
IQBAL AHMED DEDRANI Partner View Photo
PRAFUL MANJI BHAI KAPUPARA Partner View Photo
BRIJESH VRAJLAL MAVANI Partner View Photo
ATUL MANJIBHAI KAPUPARA Partner View Photo

Project

PATEL ROYAL
New Project
30/12/2022
No
Others
No
PLOT NO-07
24 MTR ROAD
PLOT NO 67
PLOT NO 08
PLOT NO 5-6
MAHARASHTRA
Konkan
Raigarh
Panvel
Ulawe
SECTOR-03
ULWE
410206
899.95
1
1
0
0

FSI Details

1332.98
00
1332.98

Bank Details

AXIS BANK LTD
UTIB0001365

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 11 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 WORK COMPLETED
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 100 WORK COMPLETED
Electrical Meter Room, Sub-Station, Receiving Station : YES 80 Electrical meter room will be provided
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 As per drawing
Water Supply : YES 0 PROPVIDE UP TO SITE BY CIDCO
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 WORK COMPLETED
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : YES 100 9 no. of trees-WORK COMPLETED
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 PATEL ROYAL PATEL ROYAL 31/12/2021 0 1 0 8 1 05 11
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 FLAT 23.015 2 0
2 FLAT 41.103 2 0
3 FLAT 40.138 2 0
4 FLAT 16.060 1 0
5 FLAT 28.810 2 0
6 FLAT 26.095 2 0
7 SHOP 22.835 5 1
8 FLAT 25.661 6 1
9 FLAT 41.124 6 1
10 FLAT 44.103 2 2
11 FLAT 26.471 8 5
12 FLAT 15.760 1 1
13 FLAT 19.438 2 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
JAYDIP A KABARIA NA Contractor

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Proforma of Allotment letter
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement