MahaRERA Application

General Information

Other Than Individual

Organization

Wadhwa Construction and Infrastructure Private Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

301, 3rd Floor
C-59, Platina
MMRDA Road
G-Block, Bandra Kurla Complex
Above Ferrari Showroom
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
400098

Organization Contact Details

02239578400
www.thewadhwagroup.com

Past Experience Details

Member Information

Member Name Designation Photo
Manohar Moolchand Chhabria Authorized Signatory View Photo
Navin Amarlal Makhija Director View Photo
Manohar Moolchand Chhabria Director View Photo

Project

Wise City, South Block Phase I, Plot RZ8, Building 3 Wing C3
New Project
30/12/2026
No
Residential
Yes
11918
Future Development
Plot RZ8 Building Number 2 Wing B4
Future Development
Layout Boundary
MAHARASHTRA
Konkan
Raigarh
Panvel
Wardoli
36 M wide DP road
Wadhwa Wise City
410206
452.48
1
1
0
0

FSI Details

6515.77
9635.37
16151.14

Bank Details

ICICI Bank Limited
ICIC0000038

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Wise City, South Block Phase I, Plot RZ8, Building 3 Wing C3 Valuable Properties Private Limited Company Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 4.5 As per Road Layout
Water Conservation, Rain water Harvesting : YES 0 RWH pit will be provided
Energy management : YES 0 NA
Fire Protection And Fire Safety Requirements : YES 0 As per CFO NOC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Sub station on township level
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 on ground level
Water Supply : YES 0 CIDCO/ NAINA
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 As per Consultant remarks
Storm Water Drains : YES 0 AS per consultant remarks
Landscaping & Tree Planting : YES 4.3 On Ground & Podium
Street Lighting : YES 1.9 NA
Community Buildings : YES 0 Common for township
Treatment And Disposal Of Sewage And Sullage Water : YES 0 STP
Solid Waste Management And Disposal : YES 0 On township level

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Wise City, South Block Phase I, Plot RZ8, Building 3 Wing C3 Wisecity South Block, Phase-1, Plot RZ-9,Building-1 Wing C3 31/12/2025 0 1 0 27 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 34.02 44 35
2 2BHK 48.12 53 31
3 1BHK 34.05 52 19
4 2BHK 44.75 52 14
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
RELIANCE HOME FINANCE LIMITED A51800007014 Real Estate Agent
RAMNARAYAN PHOOLCHANDRA PATHAK A51900018310 Real Estate Agent
Capacite Infra Projects Pvt Ltd NA Contractor
Hiten Seth Associates NA Architect
S R Estimate NA Engineer
GmJ & CO NA Chartered Accountant
Mr Pragnesh Mehta NA Other Professional
Visionary Design Architects NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
5 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
2 Declaration in FORM B
3 Declaration in FORM B
4 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
5 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement