MahaRERA Application

General Information

Other Than Individual

Organization

Hinjawadi Infradevelopment Pvt Ltd
Company
NA
Do you have any Past Experience ?
No

Address Details

1
Adams court
Baner road
Baner
Opp.Hotel Mahabaleshwar
MAHARASHTRA
Pune
Pune
Haveli
Baner
411045

Organization Contact Details

02040779900

Past Experience Details

Member Information

Member Name Designation Photo
Bharat Dewakinandan Agarwal Authorized Signatory View Photo
Chetan Sharad Chordia Director View Photo

Project

Building D1 Eon Homes
New Project
30/06/2025
No
Residential
No
Plot R-3/1 Part
Portion of layout
Portion of layout
Tech M Compound wall
Portion of layout
MAHARASHTRA
Pune
Pune
Mulshi
Man
Besides Tech Mahindra
Hinjawadi Phase III
411057
524.27
1
1
0
9086

FSI Details

9000.80
1000
10000.80

Bank Details

ICICI Bank Ltd
ICIC0004103

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 160 34 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 70 Tremix concrete roads
Water Conservation, Rain water Harvesting : YES 0 As per norms
Energy management : YES 0 Solar sysyem
Fire Protection And Fire Safety Requirements : YES 25 As per Norms
Electrical Meter Room, Sub-Station, Receiving Station : YES 90 Seperate strucure completed
Aggregate area of recreational Open Space : YES 0 As per layout
Open Parking : YES 0 Paving blocks
Water Supply : YES 60 MIDC wetersupply UGWT 100%
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 RCC hume pipe and chambers
Storm Water Drains : YES 70 RCC hume pipe and chambers
Landscaping & Tree Planting : YES 0 As per drawings by Landscape designer
Street Lighting : YES 0 8 Mtr pole LED
Community Buildings : YES 70 As per layout
Treatment And Disposal Of Sewage And Sullage Water : YES 50 STP completed
Solid Waste Management And Disposal : YES 0 Garbage chute

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Building D1 Eon Homes Building D1 Eon homes 31/12/2024 1 1 1 21 1 10 160
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 92.98 80 56
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 54
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 30
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

20
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 40.4

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Ms Sudhir Patil and Associates NA Architect
Achyut Watave NA Engineer
Mantri Maru and Co NA Chartered Accountant
Redd Consulting A52100014815 Real Estate Agent
Project Engineer Manmath Kumar Behera NA Engineer
Sai Shree Developers NA Contractor
Roots designs NA Other Professional
Unicorn MEP consultants NA Other Professional
RISHABH JAIN A52100022928 Real Estate Agent
Property Hint Consulting Services A52100019672 Real Estate Agent
PURNENDU PRASAD A52100007668 Real Estate Agent
Shishu Singh A52100017226 Real Estate Agent
RATTCON INFRATECH PRIVATE LIMITED A52100021582 Real Estate Agent
Prince Gurjar A52100024084 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
4 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement