MahaRERA Application

General Information

Other Than Individual

Organization

KOLTE-PATIL DEVELOPERS LIMITED
Company
NA
Do you have any Past Experience ?
Yes

Address Details

2ND FLOOR
CITY POINT
DHOLE PATIL ROAD
PUNE
17 BOAT CLUB ROAD
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411001

Organization Contact Details

02066226500

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1GlitteratiOthersResidential and Commercial55463Pimple Nilakh Pune - 41101414 Part61872016-04-302016-04-13
2City BayCommercialNA11636.22Dhole-Patil road Pune-411001FP no 1881272014-04-302014-04-30

Member Information

Member Name Designation Photo
VINAYAK JOGDEO Authorized Signatory View Photo
Milind Digambar Kolte Authorized Signatory View Photo

Project

VAAYU
New Project
31/01/2025
No
Residential
Yes
CTS NO 51, Village Mandpeshwar
9 mtr wide existing road
18 mtr wide Laxman Mhatre road
adjoining CTS Plot No 50 and 44A1
9 mtr wide existing road
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Laxman Mhatre Road, village mandpeshwar
Dahisar west
400068
4994.70
4
3
1
1201.28

FSI Details

12349.56
3024.13
15373.69

Bank Details

Axis Bank Limited
UTIB0000230

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
VAAYU Sagar Vaibhav Co-operative Housing Society Limited Others Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 253 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 50 Internal roads in tremix/Paver blocks/Tiles
Water Conservation, Rain water Harvesting : YES 50 As per design & drawing of consultant
Energy management : YES 50 As per design & drawing of consultant
Fire Protection And Fire Safety Requirements : YES 80 As per provisional Fire NOC received from Fire Dep
Electrical Meter Room, Sub-Station, Receiving Station : YES 40 Meter room & sub-station
Fitness Center : YES 25 As per design & drawing of consultant
Mechanized Parking tower : YES 25 As per design & drawing of consultant
Aggregate area of recreational Open Space : YES 0 1201.28 sq mt
Open Parking : YES 0 17 nos
Water Supply : YES 70 Preconstruction in tankers & post constructionMCGM
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 70 As per design & drawing of consultant
Storm Water Drains : YES 70 As per design & drawing of consultant
Landscaping & Tree Planting : YES 0 As per design & drawing of consultant
Street Lighting : YES 0 As per design & drawing of consultant
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 70 As per design & drawing of consultant
Solid Waste Management And Disposal : YES 70 As per design & drawing of consultant

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 VAAYU Wing A ground floor to 20th floor 31/01/2025 1 1 2 23 1 0 81
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 63.25 20 19
2 2BHK 63.60 20 19
3 2BHK 62.87 20 19
4 2BHK 63.10 17 16
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 55
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 65
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

50
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 59
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 VAAYU Wing A 21st floor to 32nd floor Proposed 31/01/2025 0 0 0 12 0 8 40
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 proposed 0 0 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 VAAYU Wing B 31/01/2024 1 1 2 21 1 4 70
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 50.37 2 2
2 1BHK 40.93 10 10
3 2BHK 64.21 15 15
4 2BHK 67.12 1 1
5 1RK 27.25 1 0
6 1BHK 40.88 18 18
7 1BHK 41.04 18 18
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 85
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 25
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

95
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
11 Overall Percentage of Completion of the work done For the entire Building /Wing 78
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 VAAYU Wing C 31/01/2024 1 1 2 21 1 5 62
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK with Study 82.41 1 1
2 3 BHK with Study 97.48 5 5
3 2BHK 67.15 1 1
4 2BHK 50.43 1 1
5 1BHK 40.94 11 11
6 1BHK 41.04 17 17
7 1BHK with Study 46.01 1 1
8 2BHK 58.30 2 2
9 2BHK 64.23 8 8
10 1BHK 40.88 17 17
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 85
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 25
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

95
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75
11 Overall Percentage of Completion of the work done For the entire Building /Wing 78

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Reza Kabul NA Architect
CA Nikita Bajaj NA Chartered Accountant
JW Consultants LLP NA Other Professional
Umang Shah NA Engineer
ASHISH SURENDRA THAKAR A51800001515 Real Estate Agent
Girish Nandkishor Tulsulkar A51800016966 Real Estate Agent
AVESH KUMAR A51700016699 Real Estate Agent
Yashwant Puran Rana A51800004082 Real Estate Agent
ARIF IMAM RIZVI MEHDI HASAN SYED A51700014768 Real Estate Agent
YUVRAJ MOHAN SALIAN A51800021389 Real Estate Agent
Dipesh H Vora Estate Agent A51800002214 Real Estate Agent
SWEETHOMEREALTY A51800004398 Real Estate Agent
GLEN IVAN CRASTO A51800005618 Real Estate Agent
Manisha Lifespaces Consulting Pvt. Ltd. A51800008040 Real Estate Agent
JM Financial Products Limited A51900000277 Real Estate Agent
360 REALTORS LLP A51900000246 Real Estate Agent
Keyur Hasmukhlal Parekh A51800002834 Real Estate Agent
KISHORE JAIPRAKASH VYAS A51700008031 Real Estate Agent
PERPETUAL ESTATES A51800002681 Real Estate Agent
Avinash Bhomia A51800002235 Real Estate Agent
DHRUHI REALTY LLP A51800006076 Real Estate Agent
Nikhil Paresh Dubal A51800003285 Real Estate Agent
Dipesh H Vora Estate Agent A51800002214 Real Estate Agent
PARAS ESTATE & FINANCE CONSULTANT A51700006339 Real Estate Agent
Navinchandra Bharakhda A51900002608 Real Estate Agent
Asset zone A51800002657 Real Estate Agent
VD Realty A51800003227 Real Estate Agent
SKYLIGHT ADVISORS PRIVATE LIMITED (OPC) A51800001249 Real Estate Agent
VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS NA Chartered Accountant

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
1 CERSAI details
2 CERSAI details
3 CERSAI details
4 CERSAI details
5 CERSAI details
6 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement