MahaRERA Application

General Information

Other Than Individual

Organization

M/S SHREE HARI DEVELOPERS
Partnership
NA
Do you have any Past Experience ?
No

Address Details

SR NO 9/2
SHRI HARI KRISHNA NIVAS
OMKAR COLONY
NEAR RAM KRISHNA KARYALAYA
PIMPLE GURAV
MAHARASHTRA
Pune
Pune
Haveli
Pimpale Gurav
411061

Organization Contact Details

00000000000

Past Experience Details

Member Information

Member Name Designation Photo
JAYSHREE VRAJLAL TANK Partner View Photo
DAYALJI MAVJI SAPARIYA Partner View Photo
RAKESH AMARSHI TANK Partner View Photo
DHANUBEN AMARSHI TANK Partner View Photo
RAKESH CHAGANLAL GOHIL Authorized Signatory View Photo

Project

MARUTI RESIDENCY
New Project
30/09/2022
No
Residential
No
PLOT NO 42, CTS NO 7414, SR NO 390/1
30 FEET ROAD
PLOT NO 41
30 FEET ROAD
PLOT NO 47
MAHARASHTRA
Pune
Pune
Mawal
Talegaon Dabhade (M Cl)
PLOT NO 47, CTS NO 7414, SR NO 390/1
JAVHERI COLONY, TALEGAON DABHADE
410506
483
1
1
0
0

FSI Details

577.37
0
577.37

Bank Details

HDFC BANK LTD
HDFC0000900

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 8 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 AS PER RULES
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 SMALL CABIN
LIFT : YES 0 4 PERSON CAPCITY
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 MUNCIPALITY
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 TWO WATER TANK
Storm Water Drains : YES 0 AS PER RULES
Landscaping & Tree Planting : YES 0 AROUND COMPOUND WALL
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 AS PER RULES
Solid Waste Management And Disposal : YES 0 IN COMMON AREA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 MARUTI RESIDENCY MARUTI RESIDENCY 30/09/2021 0 1 0 5 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 8.3 2 0
2 SHOP 8.88 2 0
3 1BHK 39.57 8 0
4 1BHK 40.47 7 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
RAKESH VRAJLAL TANK NA Contractor
MR NAVIN V TANK NA Architect
DEEPESH ASHOK TANK NA Engineer
JIGNESH GUNVANT CHOTALIYA NA Chartered Accountant

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement