MahaRERA Application

General Information

Individual

Individual

Rohini
Rao
Suhas Sabaji Shelatkar
No

Address For Official Communication

410
Arenja Corner
Sector-17
Vashi Navi Mumbai
Next to Shiv Center
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
400703

Contact Details

02227578799

Past Experience Details

Project

Fine Lotus
New Project
30/12/2022
No
Others
No
H-6-A
15 Mtrs Wide Road
Plot No-H-6
30 Mtrs Wide Road
8 Mtrs Wide Road
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
Plot No-H-6-A, Sector-14
Diwalpada, CBD Belapur, Navi Mumbai
400714
533
1
1
0
53.3

FSI Details

773.42
0
773.42

Bank Details

Bank of Baroda
BARB0SANPAD

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 25 0 60

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 70 In Progress
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 50 In Progress
Aggregate area of recreational Open Space : YES 50 In Progress
Open Parking : YES 50 In Progress
Water Supply : YES 0 Not Stated
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 50 In Progress
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : YES 0 Not Stated
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Fine Lotus Fine Lotus 30/12/2021 1 1 0 5 1 4 25
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 21.11 8 0
2 1RK 21.28 1 0
3 1BHK 29.02 4 0
4 1BHK 29.90 3 0
5 2BHK 43.23 4 0
6 2BHK 51.38 3 0
7 Shop 1 8.91 1 0
8 Shop 2 46.75 1 0
9 Shop 3 22.01 1 0
10 Shop 4 34.93 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 70
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 20
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 2
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 10
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

10
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 2
11 Overall Percentage of Completion of the work done For the entire Building /Wing 41.4

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Triarch Design Studio NA Architect
BS Sukthankar & Associates NA Engineer
A T Upadhye & Co NA Chartered Accountant
Vandana Enterprises NA Contractor
Sukesh Bawkar NA Other Professional

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 a Details of encumbrances concerned to Finance
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
2 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement