MahaRERA Application

General Information

Other Than Individual

Organization

Runwal Residency Private Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

4th Floor, Runwal & Omkar Esquare
Opp. Sion Chunabhatti Signal
off: eastern Exp. Highway,
Sion East
Chunabhatti Signal
MAHARASHTRA
Konkan
Mumbai City
Mumbai City
Mumbai City
400022

Organization Contact Details

02261162000

Past Experience Details

Member Information

Member Name Designation Photo
Vijay Kisan Patil Director View Photo
Saurabh Shankar Natu Authorized Signatory View Photo
Lucy Roychoudhury Director View Photo
Subodh Subhash Runwal Authorized Signatory View Photo

Project

Runwal Gardens Phase 8 Bldg No. 43 and 45
New Project
31/12/2026
No
Residential
No
Old Survey no. 44/15 (pt), 44/19 (pt), New Survey no. 4/B/20(pt)
24 m wide DP Road
Building No 44 and RG 23
Runwal Gardens Phase 1 and Internal Driveway
PG 21
MAHARASHTRA
Konkan
Thane
Kalyan
gharivle
Kalyan Shilphata Road
Dombivali
421204
1245.15
2
2
0
1054.53

FSI Details

36905.43
3000
39905.43

Bank Details

IndusInd Bank Ltd
INDB0000056

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 931 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 For all Residential Buildings in the project/Phase
Water Conservation, Rain water Harvesting : YES 0 For all Residential Buildings in the project/Phase
Energy management : YES 0 For all Residential Buildings in the project/Phase
Fire Protection And Fire Safety Requirements : YES 0 For all Residential Buildings in the project/Phase
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 For all Residential Buildings in the project/Phase
club house : YES 0 Provision made on 7th podium
DG Backup for essential common area : YES 0 For emergency services - all bldgs in the project
Double height entrance lobby : YES 0 For all Residential Buildings in the project/Phase
Elevators of reputed brands : YES 0 For all Residential Buildings in the project/Phase
half basket ball court : YES 0 For all Residential Buildings in the project/phase
Aggregate area of recreational Open Space : YES 0 For all Residential Buildings in the project/Phase
Open Parking : NO 0 NA
Water Supply : YES 0 For all Residential Buildings in the project/Phase
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 For all Residential Buildings in the project/Phase
Storm Water Drains : YES 0 For all Residential Buildings in the project/Phase
Landscaping & Tree Planting : YES 0 For all Residential Buildings in the project/phase
Street Lighting : YES 0 For all Residential Buildings in the project/Phase
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 For all Residential Buildings in the project/Phase
Solid Waste Management And Disposal : YES 0 For all Residential Buildings in R Gardens

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Runwal Gardens Phase 8 Bldg No. 43 and 45 Bldg No 43 31/12/2026 0 1 7 36 0 0 931
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2.5 BHK 73.93 28 0
2 2BHK 63.35 28 0
3 2BHK 61.80 36 0
4 2BHK 63.18 29 0
5 1BHK 44.62 6 0
6 2.5 BHK 74.16 36 0
7 2BHK 64.53 28 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 20
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Runwal Gardens Phase 8 Bldg No. 43 and 45 Bldg No 45 31/12/2026 0 1 7 36 0 0 931
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4 BHK Duplex 179.41 2 0
2 3 BHK Large 107.72 24 0
3 3 BHK Medium 88.58 28 0
4 3 BHK Medium 88.53 28 0
5 4BHK 131.03 19 0
6 6 BHK Duplex 221.56 2 0
7 3BHK 111.56 5 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 35
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 13.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Sandeep Prabhu Sakaar NA Architect
Chetan Sampat NA Engineer
Kshirsagar and Associates NA Chartered Accountant
MEP Consulting Engineering NA Other Professional
Mahimtura Consultant Pvt Ltd NA Other Professional
NILESH NEMJI DEDHIA A51700027378 Real Estate Agent
Seema Sandesh Chikhale A51700031764 Real Estate Agent
New Project Deals A51900003045 Real Estate Agent
YASH JAYDEEP SHAH A51700022152 Real Estate Agent
NAMAYARANJAN SAHOO A52000037295 Real Estate Agent
S. V. INCORPORATION A52000006542 Real Estate Agent
ASHOK KUMAR RAMRANG DUBE A51700007766 Real Estate Agent
Ravindra Sitaram Bhangre A51700009935 Real Estate Agent
Godfrey Martin Viegas Proprietor Of Saint Teresa Real Estate A51800019431 Real Estate Agent
MAHAMAYA SPACES PVT LTD A51900002064 Real Estate Agent
Winnie T Thomas A51700031751 Real Estate Agent
AMIT BHASKARAN A51700025221 Real Estate Agent
DARSHAN DEEPAK WARANGE A51700028929 Real Estate Agent
Ankit Dharmendra Agarwal A51700011786 Real Estate Agent
Ravindra Sitaram Bhangre A51700009935 Real Estate Agent
sumeet vijay sharma A51700000709 Real Estate Agent
MEGHA VIVEK TALOSKAR A51900018747 Real Estate Agent
PRAGATI PRATIK KHILARI A51700030153 Real Estate Agent
SWAPNIL KARBHARI LAHIRE A51700024636 Real Estate Agent
Suresh Prabhu A51700017706 Real Estate Agent
Himanshu Bhagwanji Gori A51700022326 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 a Details of encumbrances concerned to Finance
2 a Details of encumbrances concerned to Finance
1 b Details of encumbrances concerned to Legal
2 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
4 Building Plan Approval / NA Order for plotted development
5 Building Plan Approval / NA Order for plotted development
6 Building Plan Approval / NA Order for plotted development
7 Building Plan Approval / NA Order for plotted development
8 Building Plan Approval / NA Order for plotted development
9 Building Plan Approval / NA Order for plotted development
10 Building Plan Approval / NA Order for plotted development
11 Building Plan Approval / NA Order for plotted development
12 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
2 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
2 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement