MahaRERA Application

General Information

Other Than Individual

Organization

KRISHA ASSOCIATES
Partnership
NA
Do you have any Past Experience ?
No

Address Details

A/8
PITRUCHAYA APARTMENT
DON LANE
ACHOLE ROAD, NALLASOPARA EAST
ACHOLE ROAD
MAHARASHTRA
Konkan
Palghar
Vasai
Vasai-Virar City (M Corp)
401209

Organization Contact Details

07666722535

Past Experience Details

Member Information

Member Name Designation Photo
NAEEM GULAMNABI KAGZI Partner View Photo
VISHAL SUDAM PATIL Partner View Photo
SANJAY LAXMAN RATHOD Partner View Photo
SURESH GHISULAL GEHLOT Partner View Photo
JAYESH RAMESH RUPARALIA Partner View Photo
MEHUL SUDHIR MAJITHIA Partner View Photo
KAMLESH RATILAL THAKKER Partner View Photo
CHIRAG YOGESH THAKKAR Authorized Signatory View Photo
DHARMESH ARVIND GHANDHI Partner View Photo

Project

BUILDING NO.9
New Project
31/12/2022
No
Residential
No
GUT NO.224, G.NO.226/2, G.NO.226/3
GUT NO 222 AND 218
GUT NO 226-1 AND 227
GUT NO 230 AND 232
MAKANE VILLAGE
MAHARASHTRA
Konkan
Palghar
Palghar
Makane
MAKANE MARATHI SCHOOL
MAKANE
401102
2107.48
2
2
0
0

FSI Details

0
2022.83
2022.83

Bank Details

HDFC BANK
HDFC0000662

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 NOT YET STARTED
Water Conservation, Rain water Harvesting : YES 0 NOT YET STARTED
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 NOT STARTED YET
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 BORE WELL
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 NOT YET STARTED
Storm Water Drains : YES 0 NOT YET STARTED
Landscaping & Tree Planting : YES 0 NOT YET STARTED
Street Lighting : YES 0 NOT YET STARTED
Community Buildings : YES 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 NOT YET STARTED
Solid Waste Management And Disposal : YES 0 NOT YET STARTED

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 BUILDING NO.9 TYPE B2 31/12/2022 0 1 0 5 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 16.42 10 0
2 1BHK 28.52 5 0
3 1BHK 25.32 10 0
4 2BHK 39.57 5 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 BUILDING NO.9 TYPE B3 31/12/2022 0 1 0 5 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 RK 16.56 1 0
2 1 RK 16.42 10 0
3 1 BHK 28.52 5 0
4 1 BHK 25.32 9 0
5 2 BHK 39.57 5 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
LABH ENTERPRISES NA Contractor
ARCHITECT ROSHAN PATIL & ASSOCIATES NA Architect
JAY SHREE KRISHNA NA Structural Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval (IOD)
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Status of Conveyance
Status of Conveyance
Status of Conveyance
Other