MahaRERA Application

General Information

Other Than Individual

Organization

ROYALE URBANSPACE LLP
Others
limited liability partnership
Do you have any Past Experience ?
No

Address Details

4
NANJI DAYABHAI CHAWL
Vallabh baug lane
GHATKOPAR EAST
NEAR HDFC BANK
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
400077

Organization Contact Details

02225091011

Past Experience Details

Other Organization Type Member Information

Name Member Type
BIMAL M.SELARKA Individual
KOMAX BUILDCON LLP Others
DREAM LIFESPACE LLP Others
LIFESPACE BUILDCON LLP Others
VELGREEN LAND DEVELOPER LLP Others

Project

FENNEL H
On-Going Project
31/12/2022
30/12/2023
No
Residential
No
183
184
181
185
182
MAHARASHTRA
Konkan
Thane
Shahapur
Kalambhe
SHAHAPUR
SHAHAPUR
421601
365.48
2
2
0
0

FSI Details

1794.51
0
1794.51

Bank Details

PUNJAB NATIONAL BANK
PUNB0002310

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 55 INTERNAL ROAD WILL BE PROVIDED..WIP
Water Conservation, Rain water Harvesting : YES 0 RAIN WATER HARVESTING WILL BE PROVIED
Energy management : YES 0 SOLAR WATER HEATING SYSTEM WILL BE PROVIDED
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 ONLY ELECTRIC METER ROOM WILL BE PROVIDED
Aggregate area of recreational Open Space : YES 0 RG COMMON FOR LAYOUT
Open Parking : NO 0 NA
Water Supply : YES 0 GROUND WATER
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 STP FOR COMMON BETWEEN 4 BLDG
Storm Water Drains : YES 0 WIP
Landscaping & Tree Planting : YES 0 TREE PLANTING ONLY
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 FENNEL H FENNEL H 1 0 1 0 5 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK TYPE 1 25.70 9 7
2 1 BHK TYPE 2 25.65 5 4
3 1 RK TYPE 1 17.41 15 10
4 1 RK TYPE 2 18.74 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 94
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 94
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 94
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

94
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 76.6
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 FENNEL H FENNEL H2 0 1 0 5 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 RK TYPE 2 18.74 1 0
2 1 BHK TYPE 1 25.70 9 5
3 1 BHK TYPE 2 25.65 5 2
4 1 RK TYPE 1 17.41 15 11
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 94
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 94
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 94
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

94
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 76.6

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
TRIARCH DESIGN STUDIO NA Architect
VINAYAK CHOPDEKAR NA Engineer
ASHOK KUMAR RAMRANG DUBE A51700007766 Real Estate Agent
JMB ENTERPRISES A51900002212 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
3 Certificates of CA (Form 5)
4 Certificates of CA (Form 5)
5 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement