MahaRERA Application

General Information

Other Than Individual

Organization

Ananta Landmarks Pvt Ltd
Company
NA
Do you have any Past Experience ?
No

Address Details

101
Kalpataru Synergy
Vakola
Santacruz East
Opp Grand Hyatt
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400055

Organization Contact Details

02230645000
www.kalpataru.com

Past Experience Details

Member Information

Member Name Designation Photo
Narendra Lodha Authorized Signatory View Photo
Amit Shah Authorized Signatory View Photo

Project

Paramount D
New Project
30/06/2025
Yes
Residential
No
S No.115/14 pt 115/15 pt 115/10/2 part of village Majiwade and S No.212/2A pt 213/1A part of village balkum
SNo 115-15pt 115-14 pt 115-10-2 pt of majiwade
SNo 115-14pt of majiwade and SNo 212-2A of balkum
S No 115-14 pt 115-10-2 pt of village majiwade
SNo115-14ptMajiwade n SNo212-2A pt 213-1A ofbalkum
MAHARASHTRA
Konkan
Thane
Thane
Thane (M Corp.)
Bhiwandi Road
Balkum
400608
700.10
1
1
0
0

FSI Details

11637.16
350
11987.16

Bank Details

HDFC Bank Ltd
HDFC0000060

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 463 189 93

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 57 To be done before completion of Whole Project
Internal Roads & Footpaths : YES 0 To be done before completion of Whole Project
Internal Roads & Footpaths : YES 0 To be done before completion of Whole Project
Water Conservation, Rain water Harvesting : YES 67 To be done before completion of Whole Project
Energy management : YES 0 To be done before completion of Whole Project
Energy management : YES 40 To be done before completion of Whole Project
Fire Protection And Fire Safety Requirements : YES 90 To be done before completion of Whole Project
Electrical Meter Room, Sub-Station, Receiving Station : YES 38 Electric Meter Room and Sub-station only
Electrical Meter Room, Sub-Station, Receiving Station : YES 56 Electric Meter Room and Sub-station only
Electrical Meter Room, Sub-Station, Receiving Station : YES 95 Electric Meter Room and Sub-station only
2 Nos of Common Basement : YES 1 Common Develpoment as per AFS
2 Nos of Common Basement : YES 66 Common Develpoment as per AFS
3 Nos of Common Podiums : YES 0 Common Develpoment as per AFS
3 Nos of Common Podiums : YES 63 Common Develpoment as per AFS
Club House, Fitness Centre, Swimming Pool and other Recreational Areas : YES 0 Common development as per AFS
Club House, Fitness Centre, Swimming Pool and other Recreational Areas : YES 54 Common development as per AFS
Aggregate area of recreational Open Space : YES 0 5460 Sq.Mtr common RG as per AFS
Aggregate area of recreational Open Space : YES 40 5460 Sq.Mtr common RG as per AFS
Open Parking : YES 0 To be done before completion of Whole Project
Water Supply : YES 0 Suppy from local authority
Water Supply : YES 79 Suppy from local authority
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 81 STP only
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 89 STP only
Storm Water Drains : YES 31 To be done before completion of Whole Project
Storm Water Drains : YES 68 To be done before completion of Whole Project
Landscaping & Tree Planting : YES 4 To be done before completion of Whole Project
Landscaping & Tree Planting : YES 49 To be done before completion of Whole Project
Street Lighting : YES 0 To be done before completion of Whole Project
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 To be done before completion of Whole Project
Treatment And Disposal Of Sewage And Sullage Water : YES 90 To be done before completion of Whole Project
Solid Waste Management And Disposal : YES 100 To be done before completion of Whole Project
Solid Waste Management And Disposal : YES 90 To be done before completion of Whole Project

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Paramount D Tower 4 - Camellia 31/12/2023 1 1 3 35 1 13 463
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 10342.56 192 192
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 55
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 13
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

69
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 65.7

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
Paramount D Bombay High Court 971 Civil Yes Writ Petition NA 2005 Pending
Paramount D Additional Collector Appeal Thane 10 Civil No Appeal NA 2012 Pending
NA
Paramount D Bombay High Court 4977 Civil Yes Writ Petition NA 2018 Pending
Paramount D Bombay High Court 13451 Civil Yes Writ Petition NA 2018 Pending

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
2 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A)
2 Engineers Certificate on Quality Assurance (Form 2A)
3 Engineers Certificate on Quality Assurance (Form 2A)
4 Engineers Certificate on Quality Assurance (Form 2A)
5 Engineers Certificate on Quality Assurance (Form 2A)
6 Engineers Certificate on Quality Assurance (Form 2A)
7 Engineers Certificate on Quality Assurance (Form 2A)
8 Engineers Certificate on Quality Assurance (Form 2A)
9 Engineers Certificate on Quality Assurance (Form 2A)
10 Engineers Certificate on Quality Assurance (Form 2A)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement