MahaRERA Application

General Information

Other Than Individual

Organization

MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Company
NA
Do you have any Past Experience ?
No

Address Details

34
VTP HOUSE
WADGAON SHERI
WADGAON SHERI
INORBIT MALL
MAHARASHTRA
Pune
Pune
Haveli
VADGAONSHERI
411014

Organization Contact Details

02066850037
WWW.vtprealty.in

Past Experience Details

Member Information

Member Name Designation Photo
Bhushan Vilas Palresha Authorized Signatory View Photo
AYUSH JHANWAR Director View Photo
SUMIT RAMESH DIWANE Director View Photo
NILESH VILAS PALRESHA Authorized Signatory View Photo

Project

EARTH 1 BY VTP LUXE PHASE 1
New Project
31/12/2027
Yes
Residential
No
SNO 39/1 Part and SNO 39/2 part
15m Wide Road
SNO 39 Part
Sector 30
Sector 12
MAHARASHTRA
Pune
Pune
Mulshi
Mahalunge
Mhalunge Maan Road
Mhalunge
411045
4653.63
4
4
0
0

FSI Details

101802.23
2500
104302.23

Bank Details

HDFC Bank
HDFC0000007

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 150 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 yet to start
Water Conservation, Rain water Harvesting : YES 0 yet to start
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 yet to start
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 yet to start
Aggregate area of recreational Open Space : YES .0 yet to start
Open Parking : YES 0 yet to start
Water Supply : YES 0 yet to start
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 yet to start
Storm Water Drains : YES 0 yet to start
Landscaping & Tree Planting : YES 0 yet to start
Street Lighting : YES 0 yet to start
Community Buildings : YES 0 yet to start
Treatment And Disposal Of Sewage And Sullage Water : YES 0 yet to start
Solid Waste Management And Disposal : YES 0 yet to start

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 EARTH 1 BY VTP LUXE PHASE 1 Tower -1 31/12/2027 0 1 3 35 1 15 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 105.34 70 65
2 2BHK 62.59 70 65
3 2BHK 71.21 70 45
4 3BHK 91.06 70 68
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 10
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 EARTH 1 BY VTP LUXE PHASE 1 Tower -2 31/12/2027 0 1 3 35 1 10 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 57.58 70 65
2 2BHK 61.98 35 33
3 2BHK 62.35 6 4
4 2BHK 62.82 35 20
5 2BHK 66.34 70 30
6 3BHK 77.02 64 63
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 10
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 EARTH 1 BY VTP LUXE PHASE 1 Tower-3 31/12/2027 0 1 3 35 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 101.13 6 1
2 3BHK 119.39 64 49
3 4BHK 144.95 70 22
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 98
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 9.8
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 EARTH 1 BY VTP LUXE PHASE 1 Tower -6 31/12/2027 0 1 3 35 1 10 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 62.31 140 88
2 2BHK 66.31 140 54
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 85
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 8.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
360 REALTORS LLP A51900000246 Real Estate Agent
Realtors Compass A52100001849 Real Estate Agent
SHAILESH PRAKASH DESHMUKH A52100000067 Real Estate Agent
SAURAJ TIWARI A52100001440 Real Estate Agent
DGCON CONSULTING SERVICES PRIVATE LIMITED A52100002078 Real Estate Agent
SQUARE YARDS CONSULTING PRIVATE LIMITED A51800000454 Real Estate Agent
Big Deal Properties (India) Pvt. Ltd A52100000579 Real Estate Agent
Ashish Shrikrishna Khamkar A52100000048 Real Estate Agent
BHARATKUMAR ASHOKRAO TAUR A52100000841 Real Estate Agent
Big Deal Properties (India) Pvt. Ltd A52100000579 Real Estate Agent
Ashish Shrikrishna Khamkar A52100000048 Real Estate Agent
BHARATKUMAR ASHOKRAO TAUR A52100000841 Real Estate Agent
PROPERTY CHEF CONSULTING SERVICES A52100000044 Real Estate Agent
Shakruddin Mujawar A52100000742 Real Estate Agent
PROPBUYING REALTORS PVT LTD A52100000476 Real Estate Agent
Paresh Lachman Hardwani A52100000163 Real Estate Agent
Vk arch NA Architect
Deepak Kulkarni NA Engineer
SAC & Co LLP NA Chartered Accountant
KRISHNA KUMAR PANDAY A52100012550 Real Estate Agent
Brickfolio Solutions Private Limited A52100018143 Real Estate Agent
PROPERTYPISTOL REALTY PRIVATE LIMITED A51700000043 Real Estate Agent
BULLMEN REALTY INDIA PRIVATE LIMITED A51900009197 Real Estate Agent
MAGICSTONE SPACES LLP A52100024317 Real Estate Agent
KEY MANSIONS PRIVATE LIMITED A51900001761 Real Estate Agent
Investoxpert Advisors Private Limited A09200023052 Real Estate Agent
SMC REAL ESTATE ADVISORS PRIVATE LIMITED A51900000042 Real Estate Agent
KingsFort Developers Private Limited A52100041819 Real Estate Agent
FIRSTKEY REALTORS PRIVATE LIMITED A52100042970 Real Estate Agent
PROPENGINE REALTECH PRIVATE LIMITED A52100000628 Real Estate Agent
KPRBSK REALTORS PRIVATE LIMITED A52100012415 Real Estate Agent
PROPNIVESH PRIVATE LIMITED A52100024528 Real Estate Agent
ANAROCK Property Consultants Pvt. Ltd. A51900000108 Real Estate Agent
CLEARSPACE PROP-TECH INDIA PRIVATE LIMITED A52100037727 Real Estate Agent
LIVNEST TECHNOLOGIES PRIVATE LIMITED A51700015221 Real Estate Agent
FIRSTDOOR REALTY LLP A52100038557 Real Estate Agent
RAHRI SERVICES PVT LTD A52100039967 Real Estate Agent
SPACEWALK ADVISORS LLP A52100027240 Real Estate Agent
Paresh Sureshrao Mamidwar A52100038204 Real Estate Agent
ROCKWELLROYAL HOMES PRIVATE LIMITED A52100043863 Real Estate Agent
ProIndia Realty Private Limited A52100033900 Real Estate Agent
BASIL REALTY & INFRA SOLUTION LLP A51700020379 Real Estate Agent
Bharat Shankar Tawar proprietor of Sai real estate solution A52100019915 Real Estate Agent
CHASING SPACES PRIVATE LIMITED A52100036977 Real Estate Agent
SANTOSH PANDE A52100014785 Real Estate Agent
WILLOW STONE REALTY PRIVATE LIMITED A51700017784 Real Estate Agent
Homesfy Realty Limited A51900000136 Real Estate Agent
REALTY ASSISTANT PRIVATE LIMITED A09300024338 Real Estate Agent
HIREN NATVARLAL TRIVEDI A52100001413 Real Estate Agent
KUMRA & BINDAL CONSULTANTS PRIVATE LIMITED A52100031490 Real Estate Agent
Kamaal Khan A51900011464 Real Estate Agent
PropBiz Advisors Private Limited A52100036034 Real Estate Agent
RAHUL KUMAR SINGH A52100040431 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
EARTH 1 BY VTP LUXE PHASE 1 Civil Judge SD 161 Civil No Appeal NA 2021 Pending
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
1 a Details of encumbrances concerned to Finance
2 a Details of encumbrances concerned to Finance
3 a Details of encumbrances concerned to Finance
4 a Details of encumbrances concerned to Finance
5 a Details of encumbrances concerned to Finance
1 b Details of encumbrances concerned to Legal
2 b Details of encumbrances concerned to Legal
3 b Details of encumbrances concerned to Legal
4 b Details of encumbrances concerned to Legal
5 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
4 Building Plan Approval / NA Order for plotted development
5 Building Plan Approval / NA Order for plotted development
6 Building Plan Approval / NA Order for plotted development
7 Building Plan Approval / NA Order for plotted development
8 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
2 Proforma of Agreement for sale
1 Proforma of Allotment letter
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement