MahaRERA Application

General Information

Other Than Individual

Organization

EKTA PARKSVILLE HOMES PVT. LTD.
Company
NA
Do you have any Past Experience ?
No

Address Details

401
HALLMARK BUSINESS PLAZA
SANT DYANESHWAR MARG
KALANAGAR, BANDRA EAST
OPP. GURUNANAK HOSPITAL
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400051

Organization Contact Details

02261152424
WWW.EKTAWORLD.COM

Past Experience Details

Member Information

Member Name Designation Photo
CHANDRA PRAKASH GOYAL Authorized Signatory View Photo
DILIP LAXMAN BORHADE Director View Photo
PRAKASH TRIBHUVANDAS TANNA Director View Photo

Project

EKTA PARKSVILLE PHASE II
On-Going Project
30/11/2019
30/06/2021
31/12/2024
Yes
Residential
No
90/183 7/4 7/5PT, 91/176 1PT, 2PT, 93/177 2 PT 90/183 4PT 7PT
12 METER WIDE ROAD
CS NO 91-176PT 94-182PT
CS NO 93-177PT
12 METER WIDE INTERNAL ROAD
MAHARASHTRA
Konkan
Palghar
Vasai
Vasai-Virar City (M Corp)
401103
2321.34
8
8
0
990.74

FSI Details

23198.1
0
23198.10

Bank Details

HDFC BANK LIMITED
HDFC0000835

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 603 164 80

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 COMPLETED
Energy management : YES 100 SOLAR LIGHTS PROVIDED IN PODIUM AREA
Fire Protection And Fire Safety Requirements : YES 85 Wing C work balance
Electrical Meter Room, Sub-Station, Receiving Station : YES 75 WORK IN PROGRESS
GAZEBO : YES 100 COMPLETED
Jogging Track : YES 100 COMPLETED
MULTI PURPOSE COURT : YES 100 COMPLETED
OPEN GYMNASIUM : YES 100 COMPLETED
OPEN LAWN : YES 100 COMPLETED
OUTDOOR CHESS BOARD : YES 100 COMPLETED
OUTDOOR PLAYING AREA WITH PLAY EQUIPMENTS : YES 100 COMPLETED
SHRUB BED : YES 100 COMPLETED
Aggregate area of recreational Open Space : YES 100 COMPLETED
Open Parking : NO 0 NA
Water Supply : YES 88 WORK IN PROGRESS
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 95 WORK IN PROGRESS
Storm Water Drains : YES 95 WORK IN PROGRESS
Landscaping & Tree Planting : YES 100 COMPLETED
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 COMPLETED
Solid Waste Management And Disposal : YES 100 OWC Machine in Operation

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 EKTA PARKSVILLE PHASE II LINCOLN PARK A WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 47.45 12 12
2 2BHK 51.00 14 14
3 2 BHK 46.52 28 27
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 85
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 98.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 EKTA PARKSVILLE PHASE II LINCOLN PARK B WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 31.43 54 54
2 2BHK 40.80 14 14
3 3BHK 74.28 14 14
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 83
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 98.3
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 EKTA PARKSVILLE PHASE II LINCOLN PARK C WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 TYPE III 50.70 14 4
2 TYPE IV 53.85 14 12
3 TYPE II 45 15 7
4 Shop 18.09 1 0
5 Shop 19.25 1 1
6 Shop 14.33 1 1
7 Shop 10.17 1 1
8 Shop 19.59 1 1
9 Shop 16.47 1 1
10 Shop 13.61 1 1
11 Shop 18.37 1 1
12 TYPE 1 31.43 56 52
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 75
5 X number of Slabs of Super Structure 25
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 40
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 EKTA PARKSVILLE PHASE II LINCOLN PARK D WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP167 15.26 1 1
2 SHOP159 14.50 1 1
3 SHOP160 11.23 1 1
4 SHOP161 13.61 1 1
5 SHOP162 17.39 1 1
6 SHOP163 10.20 1 1
7 SHOP164 17.65 1 1
8 SHOP165 13.95 1 1
9 SHOP166 11.77 1 1
10 2BHK 50.7 56 55
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 99
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 EKTA PARKSVILLE PHASE II LINCOLN PARK E WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP153 17.36 1 1
2 SHOP154 10.06 1 1
3 SHOP155 12.27 1 1
4 SHOP157 12.14 1 1
5 SHOP158 15.40 1 1
6 1BHK 31.43 28 28
7 1BHK 34.60 28 28
8 SHOP156 12.33 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 81
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 98.1
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 EKTA PARKSVILLE PHASE II LINCOLN PARK F WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP148 10.92 1 1
2 SHOP149 15.26 1 1
3 SHOP150 16.92 1 1
4 SHOP151 12.07 1 1
5 SHOP152 16.12 1 1
6 2BHK 45.00 15 15
7 SHOP140 16.38 1 1
8 SHOP141 12.86 1 1
9 SHOP142 17.13 1 1
10 SHOP143 14.66 1 1
11 SHOP144 11.40 1 1
12 SHOP145 14.67 1 1
13 SHOP146 15.68 1 1
14 SHOP147 11.11 1 1
15 1BHK 34.60 56 56
16 3BHK 74.28 15 14
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 86
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 98.6
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
7 EKTA PARKSVILLE PHASE II LINCOLN PARK G WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP138 12.87 1 1
2 SHOP139 16.29 1 1
3 1BHK 31.43 28 28
4 1BHK 34.60 28 28
5 SHOP134 17.40 1 1
6 SHOP135 10.76 1 1
7 SHOP136 13.12 1 1
8 SHOP137 13.20 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 79
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 97.9
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
8 EKTA PARKSVILLE PHASE II LINCOLN PARK H WING 31/12/2020 0 1 0 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 31.43 28 28
2 1BHK 34.60 28 28
3 SHOP130 16.86 1 1
4 SHOP131 10.36 1 1
5 SHOP132 12.62 1 1
6 SHOP133 12.71 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 82
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 98.2

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
AJAY WADE AND ASSOCIATES NA Architect
J W CONSULTANTS NA Engineer
JM Financial Products Limited A51900000277 Real Estate Agent
VAIBHAV RAMESH KULKARNI A51700003316 Real Estate Agent
RAJNIKANT M SHETH A51800002278 Real Estate Agent
SHIVSHAKTI KAMLESH SINGH A51800002793 Real Estate Agent
RAKESH SHARMA A51800006030 Real Estate Agent
MINERVA PROPERTIES A51800010405 Real Estate Agent
DINESH JANGID A51800010411 Real Estate Agent
RANJEET NAIPAL YADAV A51800011251 Real Estate Agent
KEY MANSIONS PRIVATE LIMITED A51900001761 Real Estate Agent
Vipul Harinder singh A51900006416 Real Estate Agent
Manish Manohar Lanjewar A51900014561 Real Estate Agent
VINAY SINGH A51900015465 Real Estate Agent
MOSES THOMAS NADAR A99000000329 Real Estate Agent
SUNIL NAMDEO MOTWANI A99000007740 Real Estate Agent
SANDEEP SURYANATH DUBEY A99000010980 Real Estate Agent
RAHEJA ESTATE AGENCY A51800003110 Real Estate Agent
MumbaiProperties Consulting Private Limited A51800000606 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
EKTA PARKSVILLE PHASE II BOMBAY CITY CIVIL COURT 887 Civil Yes Suit NA 2016 Withdrawal
EKTA PARKSVILLE PHASE II BOMBAY CITY CIVIL COURT 889 Civil Yes Suit NA 2016 WITHDRAWAL
EKTA PARKSVILLE PHASE II BOMBAY CITY CIVIL COURT 890 Civil Yes Suit NA 2016 Withdrawal

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
4 Details of encumbrances
5 Details of encumbrances
6 a Details of encumbrances concerned to Finance
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
7 Building Plan Approval (IOD)
8 Building Plan Approval (IOD)
9 Building Plan Approval (IOD)
10 Building Plan Approval (IOD)
11 Building Plan Approval (IOD)
12 Building Plan Approval (IOD)
13 Building Plan Approval (IOD)
14 Building Plan Approval (IOD)
15 Building Plan Approval (IOD)
16 Building Plan Approval (IOD)
17 Building Plan Approval (IOD)
18 Building Plan Approval (IOD)
19 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
5 Commencement Certificates / NA Order for plotted development
6 Commencement Certificates / NA Order for plotted development
7 Commencement Certificates / NA Order for plotted development
8 Commencement Certificates / NA Order for plotted development
9 Commencement Certificates / NA Order for plotted development
10 Commencement Certificates / NA Order for plotted development
11 Commencement Certificates / NA Order for plotted development
12 Commencement Certificates / NA Order for plotted development
13 Commencement Certificates / NA Order for plotted development
14 Commencement Certificates / NA Order for plotted development
15 Commencement Certificates / NA Order for plotted development
16 Commencement Certificates / NA Order for plotted development
17 Commencement Certificates / NA Order for plotted development
18 Commencement Certificates / NA Order for plotted development
19 Commencement Certificates / NA Order for plotted development
20 Commencement Certificates / NA Order for plotted development
21 Commencement Certificates / NA Order for plotted development
22 Commencement Certificates / NA Order for plotted development
23 Commencement Certificates / NA Order for plotted development
24 Commencement Certificates / NA Order for plotted development
25 Commencement Certificates / NA Order for plotted development
26 Commencement Certificates / NA Order for plotted development
27 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
7 Disclosure of sold/ booked inventory
8 Disclosure of sold/ booked inventory
9 Disclosure of sold/ booked inventory
10 Disclosure of sold/ booked inventory
11 Disclosure of sold/ booked inventory
12 Disclosure of sold/ booked inventory
13 Disclosure of sold/ booked inventory
14 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
2 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
2 Status of Formation of Legal Entity (Society/Co Op etc.)
3 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
4 Other
5 Other
6 Other
7 Other
8 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC006000000000637 Praful Prakash Pawar View Orders
2 CC006000000000461 Prasenjit Halder View Orders
3 CC006000000023194 Sandeep L Dalvi View Orders
4 CC006000000023360 Suresh Tehilramani View Orders
5 CC006000000054811 Harsha B Bulchand and Bholaram I Bulchand View Orders
6 CC006000000054835 Bholaram I Bulchand and Harsha B Bulchand View Orders
7 CC006000000055848 PAWAN UMESHCHANDRA TIWARI View Orders
8 CC006000000055800 RAJKUMAR TIWARI View Orders
9 CC006000000044006 ROHIT ARORA View Orders
10 CC006000000022958 NAIM SHAIKH View Orders
11 CC006000000023737 Maria Abbas Jamali View Orders
12 CC006000000056638 Deepak Mehra View Orders
13 CC006000000079020 Prasenjit Halder View Orders
14 CC006000000100195 Amita Soni View Orders
15 CC006000000110792 praveen kumar View Orders
16 CC006000000056635 Reshma Vishal Parkala View Orders
17 CC006000000079300 Ashfaque A Halde View Orders
18 CC006000000078954 NAIM SHAIKH View Orders
19 CC006000000181962 Tejas Patel View Orders
20 CC006000000078954 NAIM SHAIKH View Orders
21 CC006000000171614 Regimol Jose & Jose Thomas View Orders
22 CC006000000198221 Prasenjit Halder View Orders
23 CC006000000194339 Surendra Poojar View Orders
24 CC006000000023737 Maria Abbas Jamali View Orders
25 CC006000000292738 Praful Prakash Pawar View Orders
26 CC006000000057176 POONAM BATHIJA View Orders
27 CC006000000171742 Hillari Dsouza View Orders
28 CC006000000171742 Sonia Dsouza View Orders
29 CC006000000192580 SUNIR WADHWA and NEHA WADHWA View Orders
30 CC006000000192588 RENUKA WADHWA and SULBHA WADHWA View Orders
31 CC006000000197935 Sanjay Shivram Bansode View Orders