MahaRERA Application

General Information

Other Than Individual

Organization

VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
Partnership
NA
Do you have any Past Experience ?
No

Address Details

306
Siddharth Towers
Sangam Press Road
Kothrud
Opposite Contacare Eye Hospital
MAHARASHTRA
Pune
Pune
Haveli
Kothrud
411038

Organization Contact Details

02067648000
http://javdekars.com

Past Experience Details

Member Information

Member Name Designation Photo
Aditya Vilas Javdekar Partner View Photo
Vilas Javdekar Lifestyle Developers Private Limited Through its Nominee Sarvesh Vilas Javdekar Authorized Signatory View Photo

Project

Yashwin Orizzonte Phase II
New Project
31/12/2025
No
Others
Yes
67/2, 67/5/1, 67/5/2
Nala
Sr no 67 1 and 67 3
24 m road and Wagholi road
Sr no 67 10 and 67 11
MAHARASHTRA
Pune
Pune
Haveli
KHARADI
Kharadi Wagholi street
Opposite Panchashil Tower
411014
14030
3
3
0
1403

FSI Details

57531.69
8274.67
65806.36

Bank Details

State Bank of India
SBIN0004523

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Yashwin Orizzonte Phase II Arvind Dnyanoba Rajguru and others Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 30 Internal Roads in Tremix concrete
Water Conservation, Rain water Harvesting : YES 20 As per drawings from Consultant
Energy management : YES 0 As per drawings from Consultant
Fire Protection And Fire Safety Requirements : YES 30 As per plans Fire Department Competent Authority
Electrical Meter Room, Sub-Station, Receiving Station : YES 40 As per drawings from Consultant
Aggregate area of recreational Open Space : YES 0 As per sanctioned plans by Competent Authority
Open Parking : YES 0 Plan and allotment to be made by society decision
Water Supply : YES 30 Provision by PMC borewell tanker and recylingwater
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 50 As per drawings from Consultant
Storm Water Drains : YES 30 As per drawings from Consultant
Landscaping & Tree Planting : YES 0 As per drawings from Consultant
Street Lighting : YES 0 As per drawings from Consultant
Community Buildings : YES 0 As per drawings from Consultant
Treatment And Disposal Of Sewage And Sullage Water : YES 40 As per drawings from Consultant
Solid Waste Management And Disposal : YES 0 As per drawings from Consultant

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Yashwin Orizzonte Phase II Building C and Shops under Inclusive Housing Building 31/12/2025 1 1 1 28 1 0 42
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 20 53.88 1 1
2 Shop 21 54.11 1 1
3 Shop 15 39.48 1 1
4 Shop 16 40.36 1 1
5 Shop 18 43.75 1 1
6 Shop 19 45.27 1 1
7 Shop 10 26.31 1 1
8 Shop 12 30.52 1 1
9 Shop 13 30.53 1 1
10 Shop 11 27.85 1 1
11 2BHK 58.41 5 5
12 2BHK 58.50 1 1
13 2BHK 61.52 31 31
14 3BHK 134.52 1 1
15 Shop 22 61.72 1 1
16 Shop 2 20.23 1 1
17 Shop 3 20.68 1 1
18 Shop 1 17.30 1 1
19 Shop 7 24.84 1 1
20 Shop 8 24.91 1 1
21 Shop 9 25.60 1 1
22 3BHK 71.83 69 69
23 Shop 6 24.26 1 1
24 Shop 5 23.38 1 1
25 Shop 4 23.32 1 1
26 Shop 17 42.88 1 1
27 Shop 14 33.18 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 20
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

10
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 58
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Yashwin Orizzonte Phase II Building D 31/12/2025 1 1 1 28 1 0 86
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 62.01 1 1
2 1BHK 45.14 5 1
3 2BHK 60.67 49 42
4 2 BHK Sanctioned 62.26 110 100
5 3BHK 73.61 53 53
6 2BHK 121.34 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 20
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

10
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 58
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Yashwin Orizzonte Phase II Building E 31/12/2025 1 1 1 28 1 0 108
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 84.26 54 54
2 3BHK 84.02 1 1
3 3BHK 77.38 27 27
4 4BHK 73.64 26 26
5 1BHK 47.36 5 5
6 2BHK 62.04 1 1
7 2BHK 63.15 106 106
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 10
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 55

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Holding Bricks Pvt Ltd A52100023033 Real Estate Agent
KEY MANSIONS PRIVATE LIMITED A51900001761 Real Estate Agent
MDN Properties Private Limited A52100017448 Real Estate Agent
RAVI KUNDANLAL HIRANANDANI A52100004391 Real Estate Agent
AB HOUSING REALTY PRIVATE LIMITED A52100021653 Real Estate Agent
Jayson Raj A52100023814 Real Estate Agent
IMRAN MOHAMMED A52100016058 Real Estate Agent
PROPERTYPISTOL REALTY PRIVATE LIMITED A51700000043 Real Estate Agent
Brickfolio Solutions Private Limited A52100018143 Real Estate Agent
SMC REAL ESTATE ADVISORS PRIVATE LIMITED A51900000042 Real Estate Agent
R-Constellation Pvt. Ltd. A52100000304 Real Estate Agent
ANGEL REALTY A52100027862 Real Estate Agent
ELITE LANDBASE PRIVATE LIMITED A52100015504 Real Estate Agent
YOGESH PANDURAANG RAJGURUU A52100019945 Real Estate Agent
PROPNIVESH PRIVATE LIMITED A52100024528 Real Estate Agent
REALTY ASSISTANTS HUB PVT.LTD. A09300024338 Real Estate Agent
SQUARE YARDS CONSULTING PRIVATE LIMITED A51800000454 Real Estate Agent
Prince Gurjar A52100024084 Real Estate Agent
CORAZON HOMES PRIVATE LIMITED A52100028952 Real Estate Agent
PROPTIGER MARKETING SERVICES PRIVATE LIMITED A51700000030 Real Estate Agent
Bhavana Avinash Zambare A49900023696 Real Estate Agent
Lokesh kumra A52100006340 Real Estate Agent
RK's Marketing A52100000582 Real Estate Agent
Ajinkya Satish Pawar A53000023925 Real Estate Agent
Estatepedia LLP A52100019543 Real Estate Agent
KAYCOMM REALTY LLP A52100022646 Real Estate Agent
proprise property consulting private limited A52100025032 Real Estate Agent
Vaibhav Shivaji Jadhaw A52100004052 Real Estate Agent
MANGESH JAGADALE A52100003518 Real Estate Agent
Saurabh Sudhir Shedolkar A52100008716 Real Estate Agent
Vilas Javdekar Engineering Services LLP A52100014969 Real Estate Agent
Sameer Murari Valimbe NA Architect
Kunal Navale NA Architect
Sarvesh Javdekar NA Engineer
Abhijit Mundada NA Chartered Accountant
Supriya Abhijit Mundada NA Chartered Accountant
Jayant Vinayak Inamdar NA Other Professional
Anuja Joshi NA Architect
Shrutika Hadimani NA Architect
Ninad Kulkarni NA Architect
DATTATRAYA HANUMANT KHARPUDE A52100000501 Real Estate Agent
shashi prushotam singh A52100023738 Real Estate Agent
360 REALTORS LLP A51900000246 Real Estate Agent
Adarsh Chouksey A52100028374 Real Estate Agent
CASCADE HOMES PRIVATE LIMITED A52100035356 Real Estate Agent
Jayson Raj A52100023814 Real Estate Agent
GAURAV SHIVHARI GOLE A53000029009 Real Estate Agent
Vijay Shankar Tiwari A46000029349 Real Estate Agent
Jatin Hari Kalra A52100026487 Real Estate Agent
MAGIC STONE PROP CONSULTANTS LLP A52100024317 Real Estate Agent
IMRAN MOHAMMED A52100016058 Real Estate Agent
NAGARJUN SUBBAYA TADIKALA A52100015525 Real Estate Agent
PRASHANT SHAHURAO LANDE A52100008324 Real Estate Agent
PROPERTY CHEF CONSULTING SERVICES A52100000044 Real Estate Agent
PROPERTY JUNCTIONS AND INFRASTRUCTURE PRIVATE LIMITED A52100023853 Real Estate Agent
PROPERTYPISTOL REALTY PRIVATE LIMITED A51700000043 Real Estate Agent
R-Constellation Pvt. Ltd. A52100000304 Real Estate Agent
RISHABH JAIN A52100022928 Real Estate Agent
Housewalas A52100018230 Real Estate Agent
SHUBHRAJ GIRIRAJ SUMAN A51900029145 Real Estate Agent
Siddarth Parshuram Divate A52100027275 Real Estate Agent
Trespect India Private Ltd A51900020838 Real Estate Agent
Vinodkumar Ramshankar Pal A52100022955 Real Estate Agent
Priya Saddalgi Honmute NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
4 Building Plan Approval / NA Order for plotted development
5 Building Plan Approval / NA Order for plotted development
6 Building Plan Approval / NA Order for plotted development
7 Building Plan Approval / NA Order for plotted development
8 Building Plan Approval / NA Order for plotted development
9 Building Plan Approval / NA Order for plotted development
10 Building Plan Approval / NA Order for plotted development
11 Building Plan Approval / NA Order for plotted development
12 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
2 Declaration about Commencement Certificate
3 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement