Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1PLOT NO 7 VIVA PIRANGUTResidentialNA4466.21New Gat No 273A Plot No 7 old Gat no 541 Part at village Pirangut Taluka Mulshi District PuneNew Gat No 273/A/Plot No 7 6322022-12-312018-12-14

Member Information

Member Name Designation Photo
ARVIND DIGAMBAR PRABHU Director View Photo
RAMESH MOHANLAL VALECHA Director View Photo

Project

Estrella, Viva, Pirangut
New Project
30/04/2026
Yes
Residential
No
273/B/Plot No.40
12 Mtr wide road
Gat No 594 and 595
Gat No 531
Gat No 589 and 590
MAHARASHTRA
Pune
Pune
Mulshi
Pirangut
Paud road
Pirangut
412115
11040.81
8
8
0
0

FSI Details

7461.38
0
7461.38

Bank Details

The Jammu and Kashmir Bank Ltd
JAKA0ANDERI

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Internal Roads & Footpaths : NO 0 NA
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 Recycling treated water
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : NO 0 NA
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Open Parking : YES 0 open car parkings
Water Supply : NO 0 NA
Water Supply : YES 0 Network
Water Supply : YES 61 Network
Sewerage (Chamber, Lines, Septic Tank , STP) : NO 0 NA
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Network
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 62 Network
Storm Water Drains : NO 0 NA
Storm Water Drains : YES 0 Network
Storm Water Drains : YES 63 Network
Landscaping & Tree Planting : NO 0 NA
Landscaping & Tree Planting : YES 0 Open space & Boundary Plantation
Landscaping & Tree Planting : YES 58 Open space & Boundary Plantation
Street Lighting : NO 0 NA
Street Lighting : YES 0 Bollards
Street Lighting : YES 63 Bollards
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 STP & recycling of treated water
Treatment And Disposal Of Sewage And Sullage Water : YES 63 STP & recycling of treated water
Solid Waste Management And Disposal : NO 0 NA
Solid Waste Management And Disposal : YES 0 recycling manure generation
Solid Waste Management And Disposal : YES 63 recycling manure generation

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Estrella, Viva, Pirangut Townhouse No 12 30/09/2023 0 1 0 3 0 6 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 109.160 2 2
2 3BHK 130.960 2 2
3 2BHK 109.510 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Estrella, Viva, Pirangut Townhouse No 15 31/03/2024 0 1 0 3 0 6 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 130.960 2 2
2 2BHK 109.510 2 2
3 2BHK 109.160 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Estrella, Viva, Pirangut Townhouse No 13 30/11/2023 0 1 0 3 0 6 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 130.960 2 2
2 2BHK 109.160 2 2
3 2BHK 109.510 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 Estrella, Viva, Pirangut Townhouse No 14 31/01/2024 0 1 0 3 0 6 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 109.510 2 2
2 2BHK 109.160 2 2
3 3BHK 130.960 2 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 Estrella, Viva, Pirangut Townhouse No 16 31/05/2024 0 1 0 3 0 6 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 130.960 2 2
2 2BHK 109.510 2 2
3 2BHK 109.160 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 Estrella, Viva, Pirangut Semi-attached Twin Villa F-27 and F-28 30/04/2026 0 1 0 2 0 4 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Bungalow 126.8 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
7 Estrella, Viva, Pirangut Townhouse No 18 30/04/2026 0 1 0 4 0 12 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 109.510 2 0
2 2BHK 109.160 2 0
3 3BHK 130.960 4 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 10
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
8 Estrella, Viva, Pirangut Townhouse No 20 30/04/2026 0 1 0 4 0 12 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 109.510 2 0
2 3BHK 130.960 4 0
3 2BHK 109.16 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 10

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
S N DOSHI AND ASSOCIATES NA Chartered Accountant
PURNENDU PRASAD A52100007668 Real Estate Agent
Nimbleland Infracon LLP A52100004080 Real Estate Agent
PROPENGINE REALTECH LLP A52100000628 Real Estate Agent
RANJEET SINGH YADAV A52100000402 Real Estate Agent
Pin Click Property Management Pvt Ltd. A52100012083 Real Estate Agent
ELITE LANDBASE PRIVATE LIMITED A52100015504 Real Estate Agent
Sachin Mahadeo Khedkar A52100012327 Real Estate Agent
SONIA SODHI A52100007182 Real Estate Agent
360 REALTORS LLP A51900000246 Real Estate Agent
Atul Ramchandra Mazire A52100000560 Real Estate Agent
ASCENT STRUCTURAL ENGINEERS PVT LTD CONSULTING STRUCTURAL ENGINEERS NA Engineer
Kapadia Associates Private Limited Design Architect NA Architect
Laxman Thite Liason Architect NA Architect
LAKEDGE TECHNOLOGIES PRIVATE LIMITED A52100026118 Real Estate Agent
SONIA ARORA A52100021951 Real Estate Agent
BHARTARINATH SUBHASH NALE A52100003741 Real Estate Agent
SUMIT G DAS A51800021271 Real Estate Agent
PRASHANT SHAHURAO LANDE A52100008324 Real Estate Agent
Housewalas A52100018230 Real Estate Agent
AVINASH ARUN DABADE A52100027898 Real Estate Agent
DADHICH KAPIL A52100024116 Real Estate Agent
Avik Sarkar A52100003887 Real Estate Agent
Avik Sarkar A52100003887 Real Estate Agent
Sanjib Rameshwar Srivastava A52100011329 Real Estate Agent
Amanco Realtors Pvt Ltd A52100006230 Real Estate Agent
Ankur Agarwal A52100024329 Real Estate Agent
CHIRAG SHARAD SHAH A52100013950 Real Estate Agent
PROPERTY JUNCTIONS AND INFRASTRUCTURE PRIVATE LIMITED A52100023853 Real Estate Agent
Koustubh Vinayak Vengurlekar A52100029608 Real Estate Agent
Shishu Singh A52100017226 Real Estate Agent
MURTAZA ZOHER LAKDAWALA A51900027735 Real Estate Agent
Housewalas A52100018230 Real Estate Agent
Shelter Mentors Private Limited A52100024539 Real Estate Agent
Shreevatsa Sanjay Shevade A52100010458 Real Estate Agent
Property Hint Consulting Services A52100019672 Real Estate Agent
PANKAJ BALIRAM GAWAI A50000021185 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
Estrella, Viva, Pirangut Civil Judge Senior Division Pune 2085 Civil No Suit NA 2010 Matter is posted for taking steps by the Plaintiff
NA
Estrella, Viva, Pirangut Additional District Court 224 Civil No Appeal NA 2016 Matter is posted for arguments of the Appellant
NA
Estrella, Viva, Pirangut High Court of Bombay 5964 Others No Writ Petition NA 2021 Disposed off as withdrawn
NA
Estrella, Viva, Pirangut High Court of Bombay 5967 Others No Writ Petition NA 2021 Disposed off as withdrawn
NA
Estrella, Viva, Pirangut Sub Divisional officer Maval 185 Others No Appeal NA 2020 Appeal allowed and matter disposed off
NA
Estrella, Viva, Pirangut Sub Divisional officer Maval 186 Others No Appeal NA 2020 Appeal allowed and matter disposed off
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
3 Copy of the legal title report
4 Copy of the legal title report
5 Copy of the legal title report
6 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
4 Details of encumbrances
5 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
5 Copy of Layout Approval (in case of layout)
6 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
4 Building Plan Approval / NA Order for plotted development
5 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
2 Declaration about Commencement Certificate
3 Declaration about Commencement Certificate
4 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
2 CERSAI details
3 CERSAI details
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
7 Disclosure of sold/ booked inventory
8 Disclosure of sold/ booked inventory
9 Disclosure of sold/ booked inventory
10 Disclosure of sold/ booked inventory
11 Disclosure of sold/ booked inventory
12 Disclosure of sold/ booked inventory
13 Disclosure of sold/ booked inventory
14 Disclosure of sold/ booked inventory
15 Disclosure of sold/ booked inventory
16 Disclosure of sold/ booked inventory
17 Disclosure of sold/ booked inventory
18 Disclosure of sold/ booked inventory
19 Disclosure of sold/ booked inventory
20 Disclosure of sold/ booked inventory
21 Disclosure of sold/ booked inventory
22 Disclosure of sold/ booked inventory
23 Disclosure of sold/ booked inventory
24 Disclosure of sold/ booked inventory
25 Disclosure of sold/ booked inventory
26 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
4 Proforma of Allotment letter
5 Proforma of Allotment letter
6 Proforma of Allotment letter
7 Proforma of Allotment letter
8 Proforma of Allotment letter
9 Proforma of Allotment letter
10 Proforma of Allotment letter
11 Proforma of Allotment letter
12 Proforma of Allotment letter
13 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
3 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
4 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
2 Status of Formation of Legal Entity (Society/Co Op etc.)
3 Status of Formation of Legal Entity (Society/Co Op etc.)
4 Status of Formation of Legal Entity (Society/Co Op etc.)
5 Status of Formation of Legal Entity (Society/Co Op etc.)
6 Status of Formation of Legal Entity (Society/Co Op etc.)
7 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
2 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC005000000085389 Neelam Razdan View Orders