General Information

Other Than Individual

Organization

Credence Property Developers Private Limited
Company
NA
Do you have any Past Experience ?
Yes

Address Details

702
'Natraj' by Rustomjee
M V Road
Andheri East
Junction of Western Express Highway and Andheri Kurla Road
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400069

Organization Contact Details

02266766888

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Rustomjee SangamOthersResidential and Commercial2512.49Junction of SV Road and Sai Baba Road- Santacurz W- Mumbai 400054 CTS No 51- F P No 231672014-02-282014-09-15
2Rustomjee OrianaResidentialNA4840Road Number 7- Gandhi Nagar- Bandra Eas- Mumbai - 400051CTS No- 646 pt21402013-12-312015-11-07
3ElitaResidentialNA12299.75DN Nagar Muncipal School Road- Gharkul Society- Indira Nagar- Four Bungalows- Andheri West- Mumbai - 400053CTS No 195- pt41692016-01-312016-02-26

Member Information

Member Name Designation Photo
Jignesh Mirani Authorized Signatory View Photo

Project

Rustomjee Central Park
On-Going Project
30/04/2018
30/03/2023
29/03/2024
Yes
Commercial
Yes
CTS No. 484, 484 - 1 to 7
19Deg06Min51Pt849Sec N and 72Deg51Min39Pt573Sec E
19Deg06Min51Pt123Sec N and 72Deg51Min36Pt949Sec E
19Deg06Min52Pt419Sec N and 72Deg51Min38Pt208Sec E
19Deg06Min50Pt823Sec N and 72Deg51Min38Pt014Sec E
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
Andheri Kurla Road
Chakala
400069
1497.74
2
2
0
0

FSI Details

10485.08
2097.29
12582.37

Bank Details

HDFC Bank Ltd
HDFC0001799

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Boman Irani Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Percy Chowdhry Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Keystone Realtors Pvt Ltd Company Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Md. Aquil Md. Ismail Qureshi Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Md. Kafil Md. Ismail Qureshi Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Tamseel Md. Jamil Qureshi Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Vakil Md. Jamil Qureshi Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Vasil Md. Jamil Qureshi Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Fasil Md. Jamil Qureshi Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Sajida Wahab Surty Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Rafiq Shaukat Chaudhary Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Abdul Gani Shaukat Chaudhary Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Kanchan Zubair Chaudhary Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Ayesha Zubair Chaudhary Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Sharif Hasan Raobali Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Shenaz Abdulla Shahadat Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Aisha Abdulla Shahadat Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Sharfuddin Patel Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Rustomjee Central Park Rahil Zubair Chaudhary Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 134 15 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 RCC Completed
Water Conservation, Rain water Harvesting : YES 100 To be Initiated
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 100 In line with CFO Norms. To be initiated
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 Substation Frabrication Work Started
Diesel Genset Backup for Common Areas and Emergency Services : YES 100 To be Initiated
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 100 INTERNAL
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 STP RCC Completed
Storm Water Drains : YES 100 Internal SWD Works in Progress
Landscaping & Tree Planting : YES 75 yes as proposed
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 STP
Solid Waste Management And Disposal : YES 0 OWC

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Rustomjee Central Park Wing A 30/09/2022 2 1 0 10 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 OfficeRange601to1000 56.46 2 0
2 OfficeRange0to600SF 54.91 5 0
3 OfficeRange601to1000 57.74 2 0
4 OfficeRange0to600SF 54.88 3 2
5 OfficesAbove1000SF 340.58 1 0
6 OfficesAbove1000SF 147.55 1 0
7 OfficesAbove1000SF 147.61 1 0
8 OfficesAbove1000SF 175.46 1 0
9 OfficeRange601to1000 56.36 3 1
10 OfficeRange601to1000 59.42 5 1
11 OfficeRange0to600SF 46.20 5 2
12 OfficeRange0to600SF 37.70 8 4
13 OfficeRange0to600SF 43.60 5 2
14 OfficeRange601to1000 64.96 1 0
15 OfficeRange601to1000 86.68 5 0
16 OfficeRange0to600SF 44.15 1 0
17 OfficesAbove1000SF 97.26 5 1
18 OfficeAbove1000SF 113.29 5 1
19 OfficesAbove1000SF 131.42 1 0
20 OfficesAbove1000SF 147.52 1 0
21 OfficesAbove1000SF 147.53 2 0
22 OfficeRange601to1000 63.10 5 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 80
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 78
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 78
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 92
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

88
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 93
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80.9
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Rustomjee Central Park Wing B 30/09/2022 2 1 0 10 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 OfficesAbove1000 229.53 1 0
2 OfficesAbove1000 240.81 1 1
3 OfficesAbove1000 264.19 1 0
4 OfficeRange0to600 41.50 5 1
5 OfficeRange601to1000 82.86 5 0
6 OfficesAbove1000 367.59 1 0
7 OfficesAbove1000 173.94 1 1
8 OfficeRange0to600 50.17 1 0
9 OfficeRange601to1000 68.08 1 0
10 OfficesAbove1000 119.40 1 0
11 OfficesAbove1000 142.32 1 1
12 OfficesAbove1000 147.70 1 0
13 OfficeRange601to1000 77.20 1 0
14 OfficeRange601to1000 84.72 5 2
15 OfficeRange601to1000 68.18 1 0
16 OfficesAbove1000 206.52 1 0
17 OfficesAbove1000 228.72 1 0
18 OfficesAbove1000 228.82 1 1
19 OfficeRange0to600 50.19 15 6
20 OfficeRange601to1000 68.17 4 1
21 OfficesAbove1000 383.85 1 0
22 OfficesAbove1000 115.77 1 0
23 OfficeRange601to1000 77.21 4 0
24 OfficesAbove1000 167.79 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 80
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 78
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 78
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 92
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

88
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 93
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80.9

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
J P Enterprises Civil Contractor NA Contractor
Concept Architect Sanjay Puri Architects NA Architect
Liaison Architect H M Jhaveri & Sons Architects NA Architect
STERLING ENGINEERING CONSULTANCY SERVICES PVT. LTD. NA Engineer
ICICI Home Finance Company Limited A51800000727 Real Estate Agent
ZipCode Realty A51900005960 Real Estate Agent
Hardik Bankim Shah A51800016176 Real Estate Agent
Fairdeal Realtors Pvt Ltd A51800000177 Real Estate Agent
BHOOMI REALTY A51800005803 Real Estate Agent
Nilay Rajpurohit A51900003199 Real Estate Agent
PRASIDH REALTY (I) A51900001575 Real Estate Agent
Varun Harivansh Yadav A51900012966 Real Estate Agent
Jitu Gopal soni A51800008452 Real Estate Agent
MUDRA CONSULTANCY AND ADVISORY PVT LTD A51700000025 Real Estate Agent
BHARAT ATMARAM TANDON A51800016378 Real Estate Agent
DEEPAK GHANSHYAM PAHILWANI A51800022558 Real Estate Agent
Fairdeal Realtors Pvt Ltd A51800000177 Real Estate Agent
KADAMBARI UDAYRAJ CHAVAN A51800014743 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
Rustomjee Central Park HIGH COURT BOMBAY LODGING NUMBER 2317 Civil No Writ Petition NA 2019 WRIT PETITION DISMISSED IN TERMS OF DETAILED ORDER PASSED BY HONBLE DIVISION BENCH
NA
Rustomjee Central Park SUPREME COURT OF INDIA 6403 Civil No Other SPECIAL LEAV E PETITION 2020 LODGING NUMBER MATTER PENDING FOR HEARING
NA
Rustomjee Central Park City Civil Court 8527 Civil No Suit NA 2002 pending for hearing of Chamber Summons
NA
Rustomjee Central Park Bombay High Court 1961 Civil No Suit NA 2003 For hearing of Notice of Motion
NA
Rustomjee Central Park Bombay High Court 1090 Civil No Suit NA 2011 KEPT OF ADMISSION AND DENIAL OF DOCUMENTS
NA
Rustomjee Central Park City Civil Court 3872 Civil No Suit NA 2009 FOR FRAMING OF ISSUES PARTIES ARE IN PROCESS OF RESOLVING DISPUTE AMICABLY
NA
Rustomjee Central Park City Civil Court Dindoshi 1177 Civil No Suit NA 2013 Matter pending for arguments
NA
Rustomjee Central Park Bombay High Court 1502 Civil Yes Writ Petition NA 2013 PETITION WITHDRAWN BY THE PETITIONER
Rustomjee Central Park Consumer State Forum 260 Civil No Suit NA 2011 Pending for Final Hearing
NA
Rustomjee Central Park Consumer Forum 311 Civil No Suit NA 2010 Pending for Final Hearing
NA
Rustomjee Central Park Delhi High Court 2044 Civil No Suit NA 2015 FOR ARGUMENTS ON APPLICATION FILED BY THE PLAINTIFF
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
2 Declaration in FORM B
3 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
3 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
3 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
4 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement