MahaRERA Application

General Information

Other Than Individual

Organization

Maan-Hinje Township Developers LLP
Others
Limited Liability Partnership
Do you have any Past Experience ?
Yes

Address Details

5
Godrej One
Eastern Express Highway
Vikhroli East
Pirojshanagar
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
400079

Organization Contact Details

02066410200

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Godrej WoodsvilleResidentialNA20000.5Maan Hinjewadi Road Mulshi Pune208/5 P, 208/6/3, 207 P, 206/1 P49922026-11-302026-11-30

Other Organization Type Member Information

Name Member Type
Subhasish Jyotishchandra Pattanaik Individual
Abhishek Sahaya Individual

Project

The Gale at Godrej Park World
New Project
31/03/2029
No
Others
No
198/1/1(P), 199/1(P),199/2(P),199/3(P),199/4(P), 200/1/1(P)+200/1/2(P)+200/1/3(P), 200/3/2(P),201/3(P),201/4(P),202(P)
By 18Mtr Wide Road
Central Greens and Future Sectors
By Adjoining Survey number 202 P
By 18Mtr Wide Road
MAHARASHTRA
Pune
Pune
Mulshi
Hinjavadi (CT)
Maan Mahalunge Road
Maan Hinjewadi
411057
25491.21
6
6
0
2686.89

FSI Details

152811.83
1560.93
154372.76

Bank Details

ICICI Bank
ICIC0007565

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 1637 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 as per approved plan
Water Conservation, Rain water Harvesting : YES 0 Recharge pits provided
Energy management : YES 0 solar PV solar hot water for master toilets
Fire Protection And Fire Safety Requirements : YES 0 hydrant/sprinklers wet risers & fire alarm system
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 meter room sub-station
Aggregate area of recreational Open Space : YES 0 As per approved plan for residential units
Open Parking : NO 0 NA
Water Supply : YES 0 municipal/tanker water on chargeable basis
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 STP
Storm Water Drains : YES 0 as per approved drawings
Landscaping & Tree Planting : YES 0 as per approved plan
Street Lighting : YES 0 as per approved plan
Community Buildings : YES 0 As per approved plan incl clubhouse for resi
Treatment And Disposal Of Sewage And Sullage Water : YES 0 treated water to be used for gardening & WC flush
Solid Waste Management And Disposal : YES 0 OWC for wet garbage

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 The Gale at Godrej Park World TOWER-1 A and B 31/03/2029 2 1 3 36 0 0 329
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 36 1 1
2 Shop 36.13 1 1
3 Shop 29.33 1 0
4 1BHK 48.38 2 0
5 1BHK 48.02 2 0
6 2BHK 67.06 106 0
7 2BHK 68.1 72 0
8 2BHK 67.42 28 0
9 3BHK 84.16 36 0
10 3BHK 84.44 36 0
11 Shop 35.85 1 1
12 Shop 33.93 1 0
13 Shop 36.2 1 1
14 Shop 62.78 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 The Gale at Godrej Park World TOWER-2 C and D 31/03/2029 2 1 3 36 0 0 325
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 67.06 34 0
2 2BHK 67.42 34 0
3 Shop 35.69 1 1
4 Shop 37.57 1 1
5 Shop 40.76 1 1
6 Shop 64.88 1 1
7 1BHK 45.17 72 0
8 1BHK 45.09 64 0
9 1BHK 48.38 1 0
10 1BHK 48.02 2 0
11 Shop 60.12 1 0
12 Shop 34.06 1 0
13 3BHK 84.16 36 0
14 3BHK 84.44 35 0
15 Shop 62.58 1 0
16 Shop 73.44 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 The Gale at Godrej Park World TOWER-3 E and F 31/03/2029 2 1 3 36 0 0 325
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 62.58 1 0
2 Shop 88.66 1 0
3 Shop 26.98 1 0
4 Shop 17.3 1 0
5 Shop 34.33 1 0
6 Shop 62.49 1 0
7 Shop 64.34 1 0
8 2BHK 67.06 136 70
9 3BHK 84.16 142 79
10 Shop 35.07 1 1
11 Shop 40.54 1 1
12 Shop 40.55 1 1
13 Shop 64.84 1 1
14 Shop 170.89 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 The Gale at Godrej Park World TOWER-4 G and H 31/03/2029 2 1 3 36 0 0 329
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 84.16 72 34
2 Shop 34.59 1 0
3 Shop 60.77 1 1
4 Shop 36.29 1 1
5 Shop 40.44 1 1
6 1BHK 48.02 4 1
7 2BHK 67.06 206 66
8 Shop 64.71 1 1
9 Shop 67.07 1 1
10 Shop 35.11 1 0
11 Shop 62.69 1 0
12 Shop 35.85 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 The Gale at Godrej Park World TOWER-5 I and J 31/03/2029 2 1 3 36 0 0 329
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 33.76 1 0
2 Shop 38.07 1 0
3 Shop 80.44 1 0
4 Shop 46.59 1 0
5 Shop 156.73 1 0
6 Shop 135.41 1 0
7 1BHK 45.17 138 136
8 1BHK 48.02 4 2
9 2BHK 67.06 68 31
10 3BHK 84.16 72 10
11 Shop 35.61 1 1
12 Shop 39.55 1 1
13 Shop 59.54 1 1
14 Shop 64.46 1 1
15 Shop 74.21 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 The Gale at Godrej Park World RETAIL 31/03/2029 2 1 3 0 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 84.65 1 0
2 Shop 85.87 1 0
3 Shop 176 1 0
4 Shop 76.29 1 0
5 Shop 69.28 1 0
6 Shop 80.98 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
360 REALTORS LLP A51900000246 Real Estate Agent
BILLION YARDS INFRATECH A51800003230 Real Estate Agent
Amit Jayant Wagh A51600000673 Real Estate Agent
Vision Estates A52100000039 Real Estate Agent
Fourth Dimension Business Solutions Private Limited A52100001293 Real Estate Agent
MHATOBA EARTHMOVERS NA Contractor
VK a Architecture NA Architect
Abhishek M Loya Samartha Constro Consultants LLP NA Engineer
M D Deshpande & Co NA Chartered Accountant
Ecofirst Services Ltd NA Other Professional

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
3 Copy of the legal title report
1 a Details of encumbrances concerned to Finance
2 a Details of encumbrances concerned to Finance
1 b Details of encumbrances concerned to Legal
2 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
4 Building Plan Approval / NA Order for plotted development
5 Building Plan Approval / NA Order for plotted development
6 Building Plan Approval / NA Order for plotted development
7 Building Plan Approval / NA Order for plotted development
8 Building Plan Approval / NA Order for plotted development
9 Building Plan Approval / NA Order for plotted development
10 Building Plan Approval / NA Order for plotted development
11 Building Plan Approval / NA Order for plotted development
12 Building Plan Approval / NA Order for plotted development
13 Building Plan Approval / NA Order for plotted development
14 Building Plan Approval / NA Order for plotted development
15 Building Plan Approval / NA Order for plotted development
16 Building Plan Approval / NA Order for plotted development
17 Building Plan Approval / NA Order for plotted development
18 Building Plan Approval / NA Order for plotted development
19 Building Plan Approval / NA Order for plotted development
20 Building Plan Approval / NA Order for plotted development
21 Building Plan Approval / NA Order for plotted development
22 Building Plan Approval / NA Order for plotted development
23 Building Plan Approval / NA Order for plotted development
24 Building Plan Approval / NA Order for plotted development
25 Building Plan Approval / NA Order for plotted development
26 Building Plan Approval / NA Order for plotted development
27 Building Plan Approval / NA Order for plotted development
28 Building Plan Approval / NA Order for plotted development
29 Building Plan Approval / NA Order for plotted development
30 Building Plan Approval / NA Order for plotted development
31 Building Plan Approval / NA Order for plotted development
32 Building Plan Approval / NA Order for plotted development
33 Building Plan Approval / NA Order for plotted development
34 Building Plan Approval / NA Order for plotted development
35 Building Plan Approval / NA Order for plotted development
36 Building Plan Approval / NA Order for plotted development
37 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
2 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
2 CERSAI details
1 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
2 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
2 Other – Legal
3 Other – Legal
4 Other – Legal
5 Other – Legal
6 Other – Legal
7 Other – Legal
8 Other – Legal
9 Other – Legal
10 Other – Legal
11 Other – Legal
12 Other – Legal
13 Other – Legal
14 Other – Legal
15 Other – Legal
1 Other – Finance
1 Other – Technical
2 Other – Technical
3 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement