General Information

Other Than Individual

Organization

Mahindra Lifespace Developers limited
Company
NA
Do you have any Past Experience ?
Yes

Address Details

5th Floor
Mahindra Towers
Dr. G.M Bhosale
Worli
Near Doordarshan
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400018
400018

Organization Contact Details

09535688855

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Boisar Phase IIResidentialNA10282.7Gut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District PalgharGut No 50 Plot No 162382017-12-312017-06-20
2AspenResidentialNA23376.4Bldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road MumbaiCTS No 899/A TO E1682012-12-172012-12-17
3AngelicaResidentialNA23376.4Bldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road MumbaiCTS No 899/A TO E1672013-03-252013-03-25
4Splendour Phase 1ResidentialNA34279CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078CTS NO 617 part 617 30 617 3932652011-08-152011-08-15
5Splendour Phase 2ResidentialNA34279CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078reCTS NO 617 part and 617 30 and 617 3922332013-11-142013-06-28
6LartistaResidentialNA3963Mahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 018Survey No 67B/4A plus 5A Plot No 1 ie CTS No 801 to 8061212016-09-162016-09-16
7BloomdaleResidentialNA102191MBDL mihan sez de Notified Area Beside DYPatil International School Khapri NagpurSurvey Nos 17 Part 18 Part 19 Part 26 Part 27 Part 28 29 Part 30 Part 31 Part 35 part 36 Part 39 Pa83422016-03-302017-01-23
8AshvitaResidentialNA36856Mahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072Sy No 78 PART 2 AND 78 PART356642016-06-302016-05-31
9WindchimesResidentialNA23674Mahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075Sy no 37PART3PART40PART 1 41PART 3 37PART 2A137PART2A224542018-12-312018-12-31
10Aura PH1ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200832312013-05-312013-05-31
11Aura PH2ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200821662013-11-302014-10-31
12Aura PH3ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200821102014-10-312015-08-31
13Aura PH4ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200821422015-01-312015-12-31
14Aura PH5ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200821502015-01-312016-09-30
15Luminare PH1ResidentialNA27519Sector 59 Gurgaon Manesar Urban ComplexLiscence Number 16 of 2008 dated 3101200811202020-03-312020-03-31
16Luminare PH2ResidentialNA27519Sector 59 Gurgaon Manesar Urban ComplexLiscence Number 16 of 2008 dated 3101200811202021-02-282021-02-28
17Aqualily Phase 1AResidentialNA149732MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3541412012-10-312012-10-31
18Aqualily Phase 1BResidentialNA149732MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3533332013-10-312013-10-31
19Aqualil Phase 1C AND 1DResidentialNA149732MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3577772014-10-312014-10-31
20Aqualily Phase 2AResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 355802013-11-302014-03-31
21Aqualily Phase 2BResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3581782014-11-302014-11-30
22Aqualily Phase 2C1Block C1AND C2ResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 352562015-09-302016-03-31
23Aqualily phase 2C1-Block C3 AND C4ResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 352562015-09-302016-03-31
24Aqualily Phase 2C1-Block C6ResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 351282015-12-312016-03-31
25Aqualily Phase 2C1 Block C5ResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 351242017-03-312016-03-31
26Aqualily Phase 2EResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3531962019-03-312019-03-31
27Iris Court Phase IResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 1822442013-06-302013-12-31
28IRIS Court Phase 2 Block C AND DResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 182962015-09-302015-03-31
29IRIS Court Phase 2 Block EResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 1811332015-03-312015-03-31
30IRIS Court Phase 3AResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 1811332015-03-312015-03-31
31IRIS Court Phase 3BResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 182962016-03-312016-03-31
32Nova Phase 1ResidentialNA29542MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 21 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 2123572016-05-312016-03-31
33Nova- Phase 2ResidentialNA29542MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 21 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 2123692017-08-312017-03-31
34ChlorisResidentialNA18085Milestone 16 PART 3 Sector 19 Faridabad License no is 217 of 2007 Dated 07092007 81602011-07-312011-07-31
35Avadi Phase IResidentialNA20305Block No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka PoonamalleeS No 72/2 77/2 87/3 88/3 89/5 90/1 2 3 91 92/1 93/7 98 99 100 101/766042016-06-302016-04-20
36BOISAR Phase IResidentialNA14770Gut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District PalgharGut No 50 Plot No 193592017-06-302017-01-23

Member Information

Member Name Designation Photo
Arun Kumar Tilak Raj Nanda Chairperson View Photo
Arvind Subramanian Managing Director View Photo
K R Sudarshan Authorized Signatory View Photo

Project

Mahindra Happinest Kalyan-2 Project A
New Project
30/04/2026
Yes
Residential
Yes
32A Part
Survey No 32 A Part and 36 C
Survey No 194
Survey No 63 B
Survey No 31 and 33
MAHARASHTRA
Konkan
Thane
Bhiwandi
Ranjnoli
Off Mumbai Nasik Highway
Ranjnoli
421311
26740.94
4
4
0
4181.57

FSI Details

8175.74
47332.19
55507.93

Bank Details

Axis Bank Ltd
UTIB0000653

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Mahindra Happinest Kalyan-2 Project A Ecohomes Townships LLP Others Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 249 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Not Yet Started
Water Conservation, Rain water Harvesting : YES 0 Not Yet Started
Energy management : YES 0 Not Yet Started
Fire Protection And Fire Safety Requirements : YES 0 Not Yet Started
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Not Yet Started
Aggregate area of recreational Open Space : YES 0 Not Yet Started
Open Parking : YES 0 Not Yet Started
Water Supply : YES 0 Not Yet Started
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Not Yet Started
Storm Water Drains : YES 0 Not Yet Started
Landscaping & Tree Planting : YES 0 Not Yet Started
Street Lighting : YES 0 Not Yet Started
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Not Yet Started
Solid Waste Management And Disposal : YES 0 Not Yet Started

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Mahindra Happinest Kalyan-2 Project A Tower - C 30/04/2026 0 0 0 15 1 68 50
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 36.56 69 0
2 1BHK 37.92 14 0
3 1BHK 41.45 105 0
4 1BHK 41.98 15 0
5 2BHK 52.35 13 0
6 2BHK 58.60 15 0
7 3BHK 78.35 15 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Mahindra Happinest Kalyan-2 Project A Tower - D 30/04/2026 0 0 0 15 1 68 50
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 36.56 28 0
2 1BHK 36.77 69 0
3 1BHK 37.92 42 0
4 1BHK 41.98 40 0
5 1BHK 41.45 66 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Mahindra Happinest Kalyan-2 Project A Tower - E 30/04/2026 0 0 0 15 1 64 47
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 36.77 69 0
2 1BHK 37.92 28 0
3 1BHK 41.98 49 0
4 1BHK 41.45 86 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 Mahindra Happinest Kalyan-2 Project A Tower - F 30/04/2026 0 0 0 15 1 49 35
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 41.45 49 0
2 2BHK 58.60 71 0
3 2BHK 52.35 56 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
PROPERTYPISTOL REALTY PRIVATE LIMITED A51700000043 Real Estate Agent
Sachin Kumar A52100015984 Real Estate Agent
UMA MOHAN SANGHVI A51700022707 Real Estate Agent
Mystic India Realtors LLP A51900006152 Real Estate Agent
KEY MANSIONS PRIVATE LIMITED A51900001761 Real Estate Agent
Regnum Group A51800008583 Real Estate Agent
Subodh Ramakant More A51800002160 Real Estate Agent
PRELAUNCH REALTY PRIVATE LIMITED A51700021814 Real Estate Agent
Horizon Financial &Properties Advisers Private Limited A51800001892 Real Estate Agent
Atul Desai Consultants NA Architect
K C Shah Consultants NA Engineer
ABD and CO LLP NA Chartered Accountant
PB Bhagwat LLP NA Chartered Accountant

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
Mahindra Happinest Kalyan-2 Project A Civil Judge Junior Division Bhiwandi 668 Civil No Suit NA 2011 Pending
NA
Mahindra Happinest Kalyan-2 Project A Civil Judge Senior Division Link Court Bhiwandi 1021 Civil No Suit NA 2011 Pending
NA
Mahindra Happinest Kalyan-2 Project A Bombay High Court 11001 Civil No Writ Petition NA 2016 Disposed off
NA
Mahindra Happinest Kalyan-2 Project A Civil Judge Junior Division Bhiwandi 898 Civil No Suit NA 2013 Pending
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
12 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
11 Engineer’s Certificate on Cost Incurred on Project (Form 2)
12 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement