MahaRERA Application

General Information

Other Than Individual

Organization

SAI SHIVAM DEVELOPERS
Partnership
NA
Do you have any Past Experience ?
No

Address Details

SHOP NO 4
OM DRISHTI APARTMENT
PLOT NO D-116
SECTOR 20
NERUL
MAHARASHTRA
Konkan
Thane
Thane
Navi Mumbai (M Corp.)
400706

Organization Contact Details

02227706004

Past Experience Details

Member Information

Member Name Designation Photo
DIPAK BISTU KAR Authorized Signatory View Photo
DIPAK BISTU KAR Partner View Photo
GYANENDRA SINGH RAJBAHADUR SINGH BAGHEL Partner View Photo

Project

SAI SHIVAM RESIDENCY
New Project
30/10/2022
No
Residential
Yes
B-57
PLOT NO B-58
PLOT NO B-50
11 MTR WIDE ROAD
PLOT NO B-50 AND B-51
MAHARASHTRA
Konkan
Raigarh
Panvel
Ulawe
SECTOR 16
SECTOR 16
410206
499.42
1
1
0
0

FSI Details

748.21
0
748.21

Bank Details

INDIAN BANK
IDBI000C074

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
SAI SHIVAM RESIDENCY HRITHIK DEVELOPERS Partnership Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 -
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 -
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 NO SUB STATION
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 -
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 NO STP
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : YES 0 TREE PLANTING
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 SAI SHIVAM RESIDENCY SAI SHIVAM RESIDENCY 31/10/2021 0 1 0 7 1 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 49.93 3 0
2 1BHK 26.35 3 0
3 1BHK 22.83 3 0
4 3BHK 44.40 1 0
5 1BHK 24.32 2 0
6 3BHK 38.47 2 0
7 1BHK 20.60 4 0
8 2BHK 25.16 1 0
9 1BHK 13.12 1 0
10 1BHK 13.21 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 10
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

5
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 45.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
HEMANT DHAVALE NA Architect
BAHUBALI DHAMANE NA Engineer
JAYESH PATEL NA Chartered Accountant
SHIVA CONSTRUCTION NA Contractor

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Proforma of Allotment letter
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC006000000194283 DHRUV RAMBALI GUPTA View Orders