MahaRERA Application

General Information

Other Than Individual

Organization

KOLTE-PATIL DEVELOPERS LIMITED
Company
NA
Do you have any Past Experience ?
Yes

Address Details

2ND FLOOR
CITY POINT
DHOLE PATIL ROAD
PUNE
17 BOAT CLUB ROAD
MAHARASHTRA
Pune
Pune
Pune City
Pune (M Corp.)
411001

Organization Contact Details

02066226500

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1GlitteratiOthersResidential and Commercial55463Pimple Nilakh Pune - 41101414 Part61872016-04-302016-04-13
2City BayCommercialNA11636.22Dhole-Patil road Pune-411001FP no 1881272014-04-302014-04-30

Member Information

Member Name Designation Photo
VINAYAK JOGDEO Authorized Signatory View Photo
Milind Digambar Kolte Authorized Signatory View Photo

Project

24K OPULA
On-Going Project
31/12/2021
30/12/2022
29/12/2023
Yes
Others
No
17/1/1/1 AND 2 AND 3 AND 4, 18/6A AND 6B AND 6C AND 6D, 18/3C/1, 18/3A/2, 18/3D
24 MTR WIDE DP ROAD
RIVER MULA
ADJOINING S NO 18 PART
ADJOINING S NO 16 PART
MAHARASHTRA
Pune
Pune
Haveli
Pimpri Chinchawad (M Corp.)
Pimple Nilakh
Pimple Nilakh
411027
31492.54
6
5
1
2428

FSI Details

38576.83
0
38576.83

Bank Details

AXIS BANK LIMITED
UTIB0001893

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 499 381 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 Internal Roads in Tremix and Paver Blocks
Water Conservation, Rain water Harvesting : YES 90 As per design & drawing of consultant
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 90 As per provisional Fire NOC received from Fire Dep
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 As per sanctioned electrical load from MSEDCL & co
Aggregate area of recreational Open Space : YES 0 Open Space- 2428.01 Sqm
Open Parking : YES 0 Provided for visitors parking
Water Supply : YES 100 Preconstruction in Water Tankers and Post Construc
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 90 As per design & drawing of consultant
Storm Water Drains : YES 90 As per design & drawing of consultant
Landscaping & Tree Planting : YES 90 As per design & drawing of consultant
Street Lighting : YES 90 As per design & drawing of consultant
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 STP capacity 190 KLD
Solid Waste Management And Disposal : YES 100 As per design & drawing of consultant

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 24K OPULA COMMERCIAL 30/06/2019 0 1 0 3 0 32 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 FIRST FLOOR 128.63 1 0
2 SOCIETY OFFICE 34.72 1 0
3 GROUND FLOOR 57.49 1 0
4 PODIUM FLOOR 344.88 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 89
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 24K OPULA A 30/06/2019 0 1 1 21 1 0 211
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 5 R HALL KITCHEN DUP 286.93 2 2
2 4 ROOM HALL KITCHEN 147.66 1 1
3 4 ROOM HALL KITCHEN 145.89 8 8
4 3 ROOM HALL KITCHEN 131.19 2 2
5 4 ROOM HALL KITCHEN 145.64 7 7
6 4 ROOM HALL KITCHEN 147.15 2 2
7 3 ROOM HALL KITCHEN 130.36 1 1
8 3 ROOM HALL KITCHEN 130.18 1 1
9 4 ROOM HALL KITCHEN 146.58 6 6
10 4 ROOM HALL KITCHEN 146.14 22 22
11 4 ROOM HALL KITCHEN 146.32 7 7
12 4 ROOM HALL KITCHEN 146.65 8 8
13 5 R HALL KITCHEN DUP 286.71 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 24K OPULA B 30/06/2019 0 1 1 21 1 0 144
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4 ROOM HALL KITCHEN 120.92 7 7
2 3 ROOM HALL KITCHEN 98.49 16 16
3 4 R HALL KITCHEN DUP 202.19 1 1
4 3 ROOM HALL KITCHEN 109.88 1 1
5 3 ROOM HALL KITCHEN 96.40 14 14
6 3 ROOM HALL KITCHEN 109.75 1 1
7 4 ROOM HALL KITCHEN 117.99 7 7
8 4 ROOM HALL KITCHEN 119.27 1 1
9 4 ROOM HALL KITCHEN 115.00 1 1
10 4 ROOM HALL KITCHEN 117.98 1 1
11 4 ROOM HALL KITCHEN 120.29 1 1
12 4 ROOM HALL KITCHEN 121.05 5 5
13 3 ROOM HALL KITCHEN 98.46 4 4
14 3 ROOM HALL KITCHEN 108.10 1 1
15 4 R HALL KITCHEN DUP 202.04 1 1
16 3 ROOM HALL KITCHEN 108.15 1 1
17 4 ROOM HALL KITCHEN 122.37 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 24K OPULA C 30/06/2020 0 1 1 21 1 0 144
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 ROOM HALL KITCHEN 98.70 2 2
2 4 ROOM HALL KITCHEN 120.77 10 10
3 4 ROOM HALL KITCHEN 120.82 16 16
4 3 ROOM HALL KITCHEN 100.31 1 1
5 4 ROOM HALL KITCHEN 119.34 2 2
6 4 ROOM HALL KITCHEN 113.26 1 1
7 4 ROOM HALL KITCHEN 112.84 1 1
8 3 ROOM HALL KITCHEN 108.58 2 2
9 3 ROOM HALL KITCHEN 108.39 2 2
10 4 ROOM HALL KITCHEN 120.33 2 2
11 4 R HALL KITCHEN DUP 198.56 2 2
12 3 ROOM HALL KITCHEN 100.03 2 2
13 3 ROOM HALL KITCHEN 98.71 28 28
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 100
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 24K OPULA D 30/12/2022 0 0 1 21 1 0 127
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 97.04 6 6
2 3 ROOM HALL KITCHEN 98.71 16 16
3 3 ROOM HALL KITCHEN 100.03 2 2
4 3 ROOM HALL KITCHEN 108.58 2 2
5 4BHK 118.27 1 1
6 4BHK 118.64 3 3
7 4BHK 118.70 3 3
8 4BHK 118.86 3 3
9 4BHK 118.91 3 3
10 3 ROOM HALL KITCHEN 108.39 2 2
11 D Building Shop 19.68 1 0
12 D Building Shop 16.67 1 0
13 D Building Shop 19.46 1 0
14 3 ROOM HALL KITCHEN 100.31 2 2
15 3BHK 96.65 2 2
16 3BHK 96.88 6 6
17 D Building Shop 19.70 1 0
18 D Building Shop 19.82 1 0
19 D Building Shop 19.97 2 0
20 4 ROOM HALL KITCHEN 120.33 2 2
21 4 ROOM HALL KITCHEN 120.77 4 4
22 4BHK 192.15 2 2
23 D Building Shop 19.89 1 0
24 D Building Shop 19.38 1 0
25 D Building Shop 19.07 1 0
26 D Building Shop 19.84 1 0
27 D Building Shop 19.86 1 0
28 5BHK & more 223.34 2 2
29 4 ROOM HALL KITCHEN 120.82 8 7
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 90
11 Overall Percentage of Completion of the work done For the entire Building /Wing 99
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 24K OPULA SHOP 0 0 0 0 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 0 0 0 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Vikas Achalkar NA Architect
JW Consultants LLP NA Engineer
KEY2HOME PROPERTY ADVISORS A52100000051 Real Estate Agent
LIFE SPACE PROPERTY SOLUTIONS PVT LTD A52100000993 Real Estate Agent
MAISON CHASSE PRIVATE LIMITED A52100000327 Real Estate Agent
R-Constellation Pvt. Ltd. A52100000304 Real Estate Agent
Elegance Enterprises A52100005637 Real Estate Agent
Krishna Properties A52100007637 Real Estate Agent
MAGIC HOMES A52100002308 Real Estate Agent
Pearlquest Associates Pvt Ltd A52100001979 Real Estate Agent
KIRAN GAURAV NAHTA A52100001239 Real Estate Agent
EstateMint Pvt Ltd A52100004278 Real Estate Agent
Viral Singh Chauhan A52100008416 Real Estate Agent
SUGGESTED PROPERTY PRIVATE LIMITED A52100000184 Real Estate Agent
CORAZON HOMES AND SECURITIES A52100000096 Real Estate Agent
Ankit Sachdeva A52100000478 Real Estate Agent
Bipin Singh A52100002386 Real Estate Agent
Vijay Purshottam Manakikar A52100000028 Real Estate Agent
Apna Ghar Lifespaces LLP A52100008848 Real Estate Agent
Nimbleland Infracon LLP A52100004080 Real Estate Agent
ANJALI VIKAS TALIKHEDE A52100004525 Real Estate Agent
Vision Estates A52100000039 Real Estate Agent
SPACEINDIA NEST LLP A52100002248 Real Estate Agent
GLOBAL REALTORS A52100000018 Real Estate Agent
Ameeth Kothari A52100000092 Real Estate Agent
FULL BASKET PROPERTY SERVICES PRIVATE LIMITED A52100005036 Real Estate Agent
Asset Housing And Realtors Pvt Ltd A52100001657 Real Estate Agent
HomeAdda A52100001337 Real Estate Agent
Rajat Agarwal A52100004289 Real Estate Agent
TARUN SURESH AGARWAL A52100007972 Real Estate Agent
Vijay Gurmukhdas Makhani A52100003161 Real Estate Agent
Brajesh Buchha A52100013789 Real Estate Agent
Propndeals Realty Pvt Ltd A52100003345 Real Estate Agent
Realtors Compass A52100001849 Real Estate Agent
TRIPATHI SARSIJ A52100011019 Real Estate Agent
MANISH ASHOK MAGHADE A52100005633 Real Estate Agent
HITESH SHRICHAND BAJAJ A52100008958 Real Estate Agent
Pramod Pandurang Potpelwar A52100004660 Real Estate Agent
AMOL MARUTI PHIRANGE A52100004147 Real Estate Agent
ELARA MARKETING SERVICES PRIVATE LIMITED A51700000030 Real Estate Agent
OPULENT REALTY SOLUTIONS A52100007481 Real Estate Agent
PROPINN PROPERTIES PRIVATE LIMITED A52100011114 Real Estate Agent
WISTERIA REAL VISION PVT LTD A52100003089 Real Estate Agent
MANISH SUBHASH AMRUTKAR A52100005026 Real Estate Agent
MAYANK BARHOLIA A52100003500 Real Estate Agent
KAMAL DHARAMDAS BULANI A52100000533 Real Estate Agent
Devender Singh Pawar A52100012716 Real Estate Agent
Manvendra Tripathi A52100009070 Real Estate Agent
RANJEET SINGH YADAV A52100000402 Real Estate Agent
Vijay Ganesh Rai A52100014625 Real Estate Agent
Ronisun Knowledge Application Center A52100005788 Real Estate Agent
Ketaki Zagade A52100003506 Real Estate Agent
Manan Rohit Raja A52100003147 Real Estate Agent
SMC REAL ESTATE ADVISORS PRIVATE LIMITED A51900000042 Real Estate Agent
VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS NA Chartered Accountant

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
24K OPULA CJJD Pune RCS 555/2012 Civil No Suit NA 2012 Pending for WS
NA
24K OPULA CJJD Pune 101/2014 Civil No Suit NA 2014 Hearing
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
4 Details of encumbrances
5 Details of encumbrances
6 Details of encumbrances
7 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
1 CERSAI details
2 CERSAI details
3 CERSAI details
4 CERSAI details
5 CERSAI details
6 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
4 Proforma of Allotment letter
5 Proforma of Allotment letter
6 Proforma of Allotment letter
7 Proforma of Allotment letter
8 Proforma of Allotment letter
9 Proforma of Allotment letter
10 Proforma of Allotment letter
11 Proforma of Allotment letter
12 Proforma of Allotment letter
13 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement