MahaRERA Application

General Information

Other Than Individual

Organization

NEEPA REAL ESTATES PRIVATE LIMITED
Company
NA
Do you have any Past Experience ?
Yes

Address Details

Vasant Oasis Site Office
Upper Basement
Makwana Rd
Marol
Andheri East
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400059

Organization Contact Details

02229206200
www.shethcreators.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Vasant Oasis HANA Bldg 10ResidentialNA3857.94Vasant Oasis Marol Andheri345A/1 Part1852019-12-312018-11-01

Member Information

Member Name Designation Photo
VALLABH NATWARLAL SHETH Authorized Signatory View Photo
JITENDRA NATWARLAL SHETH Authorized Signatory View Photo
Mehul Girish Sheth Authorized Signatory View Photo

Project

VASANTOASIS BLOSSOM BLDG 20 WING A AND WING B
New Project
31/12/2026
Yes
Residential
Yes
CTS NO 345A/1 PT
Adjoining D P R G 1 of layout bearing CTS No 345A
Adjoining Amenity Plot bearing CTS No 345A 5 of La
Abutting 9 M Wide Internal Access of Layout
Adjoining CTS No 345A 7
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
Makwana Road
Marol
400059
1402.42
1
1
0
1409475

FSI Details

2684033
150
2684183.00

Bank Details

HDFC
HDFC0000021

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 333 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 RWH Tank Provied
Energy management : YES 0 As Per MOEF Requirement
Fire Protection And Fire Safety Requirements : YES 0 As Per NoC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Sub Station & Meter Room
Aggregate area of recreational Open Space : YES 90 As Per Approval
Aggregate area of recreational Open Space : YES 90 As Per Approval
Open Parking : YES 0 As Per Noc
Water Supply : YES 0 As Per Noc
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 STP
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 STP
Storm Water Drains : YES 0 As Per Noc
Storm Water Drains : YES 100 As Per Noc
Landscaping & Tree Planting : YES 0 As Per Noc
Landscaping & Tree Planting : YES 10 As Per Noc
Street Lighting : YES 0 As per Remark
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 STP
Solid Waste Management And Disposal : YES 0 OWC Machine Will Provide

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 VASANTOASIS BLOSSOM BLDG 20 WING A AND WING B VASANTOASIS BLOSSOM BLDG 20 WING A AND WING B 31/12/2026 2 2 0 24 1 333 28
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 61.52 25 17
2 2BHK 60.86 24 19
3 2BHK 60.86 24 11
4 2BHK 62.95 24 20
5 Shop 15.59 1 1
6 Shop 15.73 1 1
7 Shop 18.58 1 1
8 Shop 25.64 1 1
9 Shop 6.93 1 1
10 2BHK 62.92 24 10
11 3BHK 79.17 22 17
12 3BHK 79.17 22 17
13 3BHK 80.96 25 19
14 2BHK 62.87 25 2
15 Shop 14.96 1 1
16 Shop 15.02 1 1
17 Shop 15.03 1 1
18 2BHK 61.66 23 15
19 Shop 20.46 1 1
20 Shop 20.52 1 1
21 Shop 24.72 1 1
22 Shop 14.85 1 1
23 2BHK 61.66 23 4
24 2BHK 61.36 25 0
25 3BHK 80.98 25 17
26 Shop 15.05 1 1
27 2BHK 61.52 25 21
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 90
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 50
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

50
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 50
11 Overall Percentage of Completion of the work done For the entire Building /Wing 60

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SPACEAGE CONSULTANT NA Architect
WHITBYWOOD NA Engineer
SHANKAR AND KAPANI NA Chartered Accountant

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
VASANTOASIS BLOSSOM BLDG 20 WING A AND WING B High Court Suit No 1407 Civil No Suit NA 2019 Pending
NA
VASANTOASIS BLOSSOM BLDG 20 WING A AND WING B High Court Suit No 868 Civil No Suit NA 2019 Pending
NA
VASANTOASIS BLOSSOM BLDG 20 WING A AND WING B High Court Suit No 51 Civil No Suit NA 2021 Pending
NA
VASANTOASIS BLOSSOM BLDG 20 WING A AND WING B City Civil Court Suit No 1307 Civil No Suit NA 2015 Pending
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
3 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
2 CERSAI details
3 CERSAI details
4 CERSAI details
5 CERSAI details
6 CERSAI details
7 CERSAI details
8 CERSAI details
9 CERSAI details
10 CERSAI details
11 CERSAI details
1 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement