MahaRERA Application

General Information

Other Than Individual

Organization

Mahindra Lifespace Developers limited
Company
NA
Do you have any Past Experience ?
Yes

Address Details

5th Floor
Mahindra Towers
Dr. G.M Bhosale
Worli
Near Doordarshan
MAHARASHTRA
Konkan
Mumbai City
Ward GSouth
GSouth-400018
400018

Organization Contact Details

09535688855

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Boisar Phase IIResidentialNA10282.7Gut No.50 Plot No.1 Village Kambalgaon Taluka Palghar District PalgharGut No 50 Plot No 162382017-12-312017-06-20
2AspenResidentialNA23376.4Bldg A on plot bearing cts no 899A TO E of village pahadi goregaon S.V.Road MumbaiCTS No 899/A TO E1682012-12-172012-12-17
3AngelicaResidentialNA23376.4Bldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S.V.Road MumbaiCTS No 899/A TO E1672013-03-252013-03-25
4Splendour Phase 1ResidentialNA34279CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078CTS NO 617 part 617 30 617 3932652011-08-152011-08-15
5Splendour Phase 2ResidentialNA34279CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078reCTS NO 617 part and 617 30 and 617 3922332013-11-142013-06-28
6LartistaResidentialNA3963Mahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 018Survey No 67B/4A plus 5A Plot No 1 ie CTS No 801 to 8061212016-09-162016-09-16
7BloomdaleResidentialNA102191MBDL mihan sez de Notified Area Beside DYPatil International School Khapri NagpurSurvey Nos 17 Part 18 Part 19 Part 26 Part 27 Part 28 29 Part 30 Part 31 Part 35 part 36 Part 39 Pa83422016-03-302017-01-23
8AshvitaResidentialNA36856Mahindra Lifespace Developers Limited Sy No 78 PART 2 AND 78 PART3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072Sy No 78 PART 2 AND 78 PART356642016-06-302016-05-31
9WindchimesResidentialNA23674Mahindra Homes Pvt Ltd Sy No 37PART 2 37 PART 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075Sy no 37PART3PART40PART 1 41PART 3 37PART 2A137PART2A224542018-12-312018-12-31
10Aura PH1ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200832312013-05-312013-05-31
11Aura PH2ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200821662013-11-302014-10-31
12Aura PH3ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200821102014-10-312015-08-31
13Aura PH4ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200821422015-01-312015-12-31
14Aura PH5ResidentialNA68149Village Chauma Sector 110A Gurgaon Manesar Urban ComplexLiscence Number 43 of 2008 Dated 0703200821502015-01-312016-09-30
15Luminare PH1ResidentialNA27519Sector 59 Gurgaon Manesar Urban ComplexLiscence Number 16 of 2008 dated 3101200811202020-03-312020-03-31
16Luminare PH2ResidentialNA27519Sector 59 Gurgaon Manesar Urban ComplexLiscence Number 16 of 2008 dated 3101200811202021-02-282021-02-28
17Aqualily Phase 1AResidentialNA149732MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3541412012-10-312012-10-31
18Aqualily Phase 1BResidentialNA149732MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3533332013-10-312013-10-31
19Aqualil Phase 1C AND 1DResidentialNA149732MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3577772014-10-312014-10-31
20Aqualily Phase 2AResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 355802013-11-302014-03-31
21Aqualily Phase 2BResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3581782014-11-302014-11-30
22Aqualily Phase 2C1Block C1AND C2ResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 352562015-09-302016-03-31
23Aqualily phase 2C1-Block C3 AND C4ResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 352562015-09-302016-03-31
24Aqualily Phase 2C1-Block C6ResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 351282015-12-312016-03-31
25Aqualily Phase 2C1 Block C5ResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 351242017-03-312016-03-31
26Aqualily Phase 2EResidentialNA71252MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002Plot No 33 34 3531962019-03-312019-03-31
27Iris Court Phase IResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 1822442013-06-302013-12-31
28IRIS Court Phase 2 Block C AND DResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 182962015-09-302015-03-31
29IRIS Court Phase 2 Block EResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 1811332015-03-312015-03-31
30IRIS Court Phase 3AResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 1811332015-03-312015-03-31
31IRIS Court Phase 3BResidentialNA72883MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 182962016-03-312016-03-31
32Nova Phase 1ResidentialNA29542MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 21 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 2123572016-05-312016-03-31
33Nova- Phase 2ResidentialNA29542MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 21 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist TamilNadu 603002Plot No 2123692017-08-312017-03-31
34ChlorisResidentialNA18085Milestone 16 PART 3 Sector 19 Faridabad License no is 217 of 2007 Dated 07092007 81602011-07-312011-07-31
35Avadi Phase IResidentialNA20305Block No 84 WARD No 1 Paruthipattu Village Avadi Municipalty Taluka PoonamalleeS No 72/2 77/2 87/3 88/3 89/5 90/1 2 3 91 92/1 93/7 98 99 100 101/766042016-06-302016-04-20
36BOISAR Phase IResidentialNA14770Gut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District PalgharGut No 50 Plot No 193592017-06-302017-01-23

Member Information

Member Name Designation Photo
Arun Kumar Tilak Raj Nanda Chairperson View Photo
Arvind Subramanian Managing Director View Photo
K R Sudarshan Authorized Signatory View Photo

Project

VIVANTE
On-Going Project
31/10/2019
31/10/2019
30/10/2021
No
Residential
No
243 A/1, 243 A/2
An Operational BMC ground
13 meter 400 mm wide DP Road Suren Road
Part abutting TCS Banyan Tree and part abutting
Declared slum Redevelopment underway
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
.
.
400093
5145.8
3
3
0
897.67

FSI Details

11106.86
0
11106.86

Bank Details

Kotak Mahindra bank
KKBK0000958

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 212 157 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 NA
Water Conservation, Rain water Harvesting : YES 100 NA
Energy management : YES 100 NA
Fire Protection And Fire Safety Requirements : YES 100 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 NA
AV Room : YES 100 NA
Games room : YES 100 NA
Gym : YES 100 NA
Multipurpose Hall : YES 100 NA
recreational ground : YES 100 NA
steam room : YES 100 NA
Swimming pool : YES 100 NA
Aggregate area of recreational Open Space : YES 100 NA
Open Parking : NO 0 NA
Water Supply : YES 100 NA
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 NA
Storm Water Drains : YES 100 NA
Landscaping & Tree Planting : YES 100 NA
Street Lighting : YES 100 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 NA
Solid Waste Management And Disposal : YES 100 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 VIVANTE Building Number 1 31/10/2019 0 1 0 13 1 0 118
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 BHK Type 1 110.44 22 22
2 3 BHK type 2 110.6 24 24
3 1 BHK Type 1 54.43 2 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 VIVANTE Building Number 2 31/10/2019 1 1 0 13 1 0 95
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHKType1 64.03 11 11
2 2BHKType2 64.53 12 12
3 2BHKType3 64.46 11 11
4 2andHalfBHK 81 4 4
5 1BHKType1 42.30 9 9
6 1BHKType2 39.97 7 7
7 1BHKType3 46.28 1 1
8 1BHKType4 45.83 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 VIVANTE Car Park Tower 0 1 0 2 0 0 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 0 0 0 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 70

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
MORPHOGENESIS NA Architect
Quality Heightcon Pvt Ltd NA Contractor
AAKAR ARCHITECT NA Architect
Vintech structural consultant NA Engineer
Enersave Consultants Pvt. Ltd. NA Other Professional
Oracles NA Other Professional
JONES LANG LASALLE RESIDENTIAL PRIVATE LIMITED A51900000108 Real Estate Agent
Sachin Sumatkumar Jejani A50500000850 Real Estate Agent
ICICI Home Finance Company Limited A51800000727 Real Estate Agent
SACHIN PRAKASH GANDHI A51900000117 Real Estate Agent
SACHINKUMAR UPADHYAY A51800000782 Real Estate Agent
Milind Shridhar Ghosalkar A51800000207 Real Estate Agent
MANOJ DAMODARLAL LAKHOTIA A51900000265 Real Estate Agent
Punit Kinariwala A51800000695 Real Estate Agent
HDFC Realty Limited A51900000107 Real Estate Agent
Arcadis India Pvt. Ltd. NA Other Professional
SEW Engineering (India) Pvt. Ltd. NA Contractor
MYK Schomburg India Pvt. Ltd NA Contractor
Aquafloor Solutions Pvt Ltd NA Contractor
Sterling and Wilson Pvt. Ltd. NA Contractor
Sushanth Chandrakant Joijode A51900001783 Real Estate Agent
SKYLIGHT ADVISORS PRIVATE LIMITED (OPC) A51800001249 Real Estate Agent
Centrum Wealth Management Limited A51800002070 Real Estate Agent
H5 REALY A51900001442 Real Estate Agent
PROPERTY JUNCTION A51900008608 Real Estate Agent
INVEST IN REALITY LLP A51800003095 Real Estate Agent
360 REALTORS LLP A51900000246 Real Estate Agent
SOUL SPACES PROPERTY SOLUTION PVT LTD A51800006266 Real Estate Agent
MOHAMMED AKRAM IDRIS KHAN A51800000508 Real Estate Agent
Yash Jivraj Dangodra A51800014658 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
3 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC006000000110718 PRASHANT KATIYAR View Orders