MahaRERA Application

General Information

Other Than Individual

Organization

Runwal Apartments Private Limited
Company
NA
Do you have any Past Experience ?
Yes

Address Details

Runwal & Omkar Esquare
5th Floor, Off Eastern Express Highway
Opp. Sion Chunabhatti Signal
Sion (East)
Opp Sion Chunabhatti Signal
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
400022

Organization Contact Details

02261162000

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1R-GalleriaCommercialNA4992.46Goregaon Mulund Road Next to Fortis Hospital Mulund West Mumbai-400078Part of CTS No 681/A7, 681/A8 and 681/A911592016-06-302016-07-28
2Runwal Greens Wing AResidentialNA657.64Goregaon Mulund Road Next to Fortis Hospital Mulund West Mumbai-400078Part of CTS No 681/A7, 681/A8 and 681/A912162016-05-312017-06-05
3Runwal Greens Wing BResidentialNA657.64Goregaon Mulund Road Next to Fortis Hospital Mulund West Mumbai-400078Part of CTS No 681/A7, 681/A8 and 681/A912162016-03-312017-03-18
4ChestnutResidentialNA624.43Goregaon Mulund Road Next to Fortis Hospital Mulund West Mumbai-400078681/A/1211162016-01-312016-03-09
5Runwal Greens Wing CResidentialNA653.91Goregaon Mulund Road Next to Fortis Hospital Mulund West Mumbai-400078Part of CTS No 681/A7, 681/A8 and 681/A912112016-12-312017-08-22
6Runwal Greens Wing DResidentialNA1015.70Goregaon Mulund Road Next to Fortis Hospital Mulund West Mumbai-40007Part of CTS No 681/A7, 681/A8 and 681/A912232016-12-312017-11-02

Member Information

Member Name Designation Photo
Mr Ashutosh Arvind Navare Authorized Signatory View Photo

Project

Runwal Pinnacle
New Project
30/06/2026
30/06/2027
Yes
Residential
No
CTS No. 681A/8B pt.
Residential Towers
Hospital reservation
Fortis Hospital
CTS No 767 and 768
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
Goregaon Mulund Link Road
Mulund(West)
400080
4925.58
5
5
0
0

FSI Details

38465.08
39687.20
78152.28

Details of RERA Designated Separate Bank Account

Indusind Bank Ltd
INDB0000056

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 799 637 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 For all towers in the project
Water Conservation, Rain water Harvesting : YES 0 For all towers in the project
Energy management : YES 0 For all towers in the project
Fire Protection And Fire Safety Requirements : YES 0 For all towers in the project
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Electric Meter room & sub-station only
2 Level Gymnasium : YES 0 For all towers in the project
5 level Common Basement : YES 0 Common basement for all towers in the project
9 level Common Podium : YES 0 Common Podium for all towers in the project
Aerobics Room : YES 0 For all towers in the project
BADMINTON COURT Open : YES 0 For all towers in the project
Billiards/Pool Room : YES 0 For all towers in the project
Business Centre : YES 0 For all towers in the project
CCTV surveillance : YES 0 For all towers in the project
Common Parking : YES 0 Common Parking for all towers in the project
Convenience Retail : YES 0 For all towers in the project
Creche : YES 0 For all towers in the project
DG Backup in Essential & Common Areas : YES 0 For all towers in the project
Double height entrance lobbies : YES 0 For all towers in the project
Exclusive kids pool : YES 0 For all towers in the project
Gaming Arena : YES 0 For all towers in the project
Half-Basketball Court : YES 0 For all towers in the project
High Speed lifts : YES 0 For all towers in the project
Intercom facility from Lobby to apartment : YES 0 For all towers in the project
Jacuzzi : YES 0 For all towers in the project
Kids Play Area : YES 0 For all towers in the project
Landscaped driveway : YES 0 For all towers in the project
Library : YES 0 For all towers in the project
Mini Theatre : YES 0 For all towers in the project
Party Hall : YES 0 For all towers in the project
Rainwater harvesting : YES 0 For all towers in the project
RFID Tagged Entry Systems : YES 0 For all towers in the project
Rooftop jogging track : YES 0 For all towers in the project
Rooftop Sky Lounge : YES 0 For all towers in the project
Sewage Treatment Plant : YES 0 For all towers in the project
Sky Bbq Pavilion : YES 0 For all towers in the project
Sky Deck Open Gym : YES 0 For all towers in the project
Spa : YES 0 For all towers in the project
Squash Court : YES 0 For all towers in the project
Stargazing Deck with telescope : YES 0 For all towers in the project
Swimming pool with poolside decks : YES 0 For all towers in the project
Table Tennis : YES 0 For all towers in the project
Wifi Enabled Lobbies : YES 0 For all towers in the project
Yoga Room : YES 0 For all towers in the project
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 For all towers in the project
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 No septic Tank
Storm Water Drains : YES 0 For all towers in the project
Landscaping & Tree Planting : YES 0 For all towers in the project
Street Lighting : NO 0 NA
Community Buildings : YES 0 2 level Common Clubhouse above podium (all towers)
Treatment And Disposal Of Sewage And Sullage Water : YES 0 For all towers in the project
Solid Waste Management And Disposal : YES 0 For all towers in the project

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Runwal Pinnacle Tower 1 30/06/2025 0 1 0 57 0 0 114
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 83.99 46 31
2 2BHK 61.17 40 39
3 Studio 34.89 1 0
4 3BHK 79.97 54 18
5 3 BHK 77.92 54 33
6 2 BHK plus Deck 61.65 14 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 85
4 Stilt Floor 80
5 X number of Slabs of Super Structure 3
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 36.8
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Runwal Pinnacle Tower 2 30/06/2025 0 1 0 57 0 0 139
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 64.05 21 13
2 1BHK 42.48 54 22
3 2 BHK 59.46 33 29
4 2BHK 54.94 28 28
5 2BHK 61.54 36 7
6 1BHK 42.85 54 35
7 2 BHK 54.63 33 24
8 2 BHK plus Deck 55.53 12 7
9 2 BHK 59.02 21 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 85
4 Stilt Floor 80
5 X number of Slabs of Super Structure 5
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 37
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Runwal Pinnacle Tower 3 30/06/2025 0 1 0 57 0 0 95
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 55.39 28 28
2 1BHK 42.48 40 24
3 2 BHK plus Deck 56.14 12 6
4 1BHK 42.92 40 27
5 1 BHK plus Deck 42.96 14 3
6 1.5 BHK plus Deck 43.4 14 3
7 2BHK 63.5 36 34
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 85
4 Stilt Floor 80
5 X number of Slabs of Super Structure 55
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 11
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

1
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 43.2
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 Runwal Pinnacle Tower 4 30/06/2025 0 1 0 57 0 0 111
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 BHK plus Deck 80.47 12 6
2 3BHK 87.57 54 38
3 3BHK 79.52 28 26
4 1 BHK 46.63 54 34
5 2BHK 63.64 36 31
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 85
4 Stilt Floor 80
5 X number of Slabs of Super Structure 55
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 13
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

1
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 43.4
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 Runwal Pinnacle Tower 5 30/06/2025 0 1 0 57 0 0 82
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 61.14 36 2
2 1BHK 42.48 54 23
3 1BHK 42.85 54 24
4 2BHK 60.52 28 28
5 2 BHK plus Deck 61.17 12 2
6 3BHK 76.11 54 23
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 85
4 Stilt Floor 80
5 X number of Slabs of Super Structure 10
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 37.5

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
Runwal Pinnacle CITY CIVIL COURT BOMBAY LC Suit No 100552/2013 Civil No Suit NA 2013 Disposed Off
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
5 Copy of Layout Approval (in case of layout)
6 Copy of Layout Approval (in case of layout)
7 Copy of Layout Approval (in case of layout)
8 Copy of Layout Approval (in case of layout)
9 Copy of Layout Approval (in case of layout)
10 Copy of Layout Approval (in case of layout)
11 Copy of Layout Approval (in case of layout)
12 Copy of Layout Approval (in case of layout)
13 Copy of Layout Approval (in case of layout)
14 Copy of Layout Approval (in case of layout)
15 Copy of Layout Approval (in case of layout)
16 Copy of Layout Approval (in case of layout)
17 Copy of Layout Approval (in case of layout)
18 Copy of Layout Approval (in case of layout)
19 Copy of Layout Approval (in case of layout)
20 Copy of Layout Approval (in case of layout)
21 Copy of Layout Approval (in case of layout)
22 Copy of Layout Approval (in case of layout)
23 Copy of Layout Approval (in case of layout)
24 Copy of Layout Approval (in case of layout)
25 Copy of Layout Approval (in case of layout)
26 Copy of Layout Approval (in case of layout)
27 Copy of Layout Approval (in case of layout)
28 Copy of Layout Approval (in case of layout)
29 Copy of Layout Approval (in case of layout)
30 Copy of Layout Approval (in case of layout)
31 Copy of Layout Approval (in case of layout)
32 Copy of Layout Approval (in case of layout)
33 Copy of Layout Approval (in case of layout)
34 Copy of Layout Approval (in case of layout)
35 Copy of Layout Approval (in case of layout)
36 Copy of Layout Approval (in case of layout)
37 Copy of Layout Approval (in case of layout)
38 Copy of Layout Approval (in case of layout)
39 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
7 Building Plan Approval (IOD)
8 Building Plan Approval (IOD)
9 Building Plan Approval (IOD)
10 Building Plan Approval (IOD)
11 Building Plan Approval (IOD)
12 Building Plan Approval (IOD)
13 Building Plan Approval (IOD)
14 Building Plan Approval (IOD)
15 Building Plan Approval (IOD)
16 Building Plan Approval (IOD)
17 Building Plan Approval (IOD)
18 Building Plan Approval (IOD)
19 Building Plan Approval (IOD)
20 Building Plan Approval (IOD)
21 Building Plan Approval (IOD)
22 Building Plan Approval (IOD)
23 Building Plan Approval (IOD)
24 Building Plan Approval (IOD)
25 Building Plan Approval (IOD)
26 Building Plan Approval (IOD)
27 Building Plan Approval (IOD)
28 Building Plan Approval (IOD)
29 Building Plan Approval (IOD)
30 Building Plan Approval (IOD)
31 Building Plan Approval (IOD)
32 Building Plan Approval (IOD)
33 Building Plan Approval (IOD)
34 Building Plan Approval (IOD)
35 Building Plan Approval (IOD)
36 Building Plan Approval (IOD)
37 Building Plan Approval (IOD)
38 Building Plan Approval (IOD)
39 Building Plan Approval (IOD)
40 Building Plan Approval (IOD)
41 Building Plan Approval (IOD)
42 Building Plan Approval (IOD)
43 Building Plan Approval (IOD)
44 Building Plan Approval (IOD)
45 Building Plan Approval (IOD)
46 Building Plan Approval (IOD)
47 Building Plan Approval (IOD)
48 Building Plan Approval (IOD)
49 Building Plan Approval (IOD)
50 Building Plan Approval (IOD)
51 Building Plan Approval (IOD)
52 Building Plan Approval (IOD)
53 Building Plan Approval (IOD)
54 Building Plan Approval (IOD)
55 Building Plan Approval (IOD)
56 Building Plan Approval (IOD)
57 Building Plan Approval (IOD)
58 Building Plan Approval (IOD)
59 Building Plan Approval (IOD)
60 Building Plan Approval (IOD)
61 Building Plan Approval (IOD)
62 Building Plan Approval (IOD)
63 Building Plan Approval (IOD)
64 Building Plan Approval (IOD)
65 Building Plan Approval (IOD)
66 Building Plan Approval (IOD)
67 Building Plan Approval (IOD)
68 Building Plan Approval (IOD)
69 Building Plan Approval (IOD)
70 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
5 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
2 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
1 CERSAI details
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
7 Disclosure of sold/ booked inventory
8 Disclosure of sold/ booked inventory
9 Disclosure of sold/ booked inventory
10 Disclosure of sold/ booked inventory
11 Disclosure of sold/ booked inventory
12 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)
1 Proforma of Agreement for sale
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement
1 Other
2 Other
3 Other
1 Other – Finance
1 Other – Technical
2 Other – Technical

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC006000000374829 Umesh Baban Korade View Orders