Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
1 |
TULSI AAHAN
|
WING A
|
31/12/2019
|
0
|
1
|
0
|
8
|
1 |
0 |
27 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 BHK FLAT |
28.35 |
4 |
0 |
2 |
1 BHK FLAT |
28.20 |
8 |
0 |
3 |
2 BHK FLAT |
43.86 |
4 |
2 |
4 |
1 BHK FLAT |
29.59 |
8 |
2 |
5 |
1 BHK FLAT |
28.90 |
9 |
0 |
6 |
1 BHK FLAT |
28.84 |
3 |
0 |
7 |
1 BHK FLAT |
28.77 |
3 |
0 |
8 |
1 BHK FLAT |
28.66 |
3 |
0 |
9 |
2 BHK FLAT |
39.26 |
3 |
0 |
10 |
2 BHK FLAT |
41.17 |
3 |
0 |
11 |
1 BHK FLAT |
30.05 |
6 |
0 |
12 |
2 BHK FLAT |
41.95 |
4 |
0 |
13 |
1 BHK FLAT |
28.44 |
12 |
0 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
100
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
2 |
TULSI AAHAN
|
WING B
|
31/12/2019
|
0
|
1
|
0
|
8
|
1 |
0 |
17 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 BHK FLAT |
31.53 |
8 |
0 |
2 |
2 BHK FLAT |
42.72 |
4 |
0 |
3 |
2 BHK FLAT |
41.52 |
8 |
0 |
4 |
1 BHK FLAT |
28.84 |
6 |
0 |
5 |
2 BHK FLAT |
41.81 |
3 |
0 |
6 |
2 BHK FLAT |
43.27 |
3 |
0 |
7 |
2 BHK FLAT |
41.98 |
6 |
0 |
8 |
COMMERCIAL |
19.74 |
1 |
0 |
9 |
COMMERCIAL |
13.14 |
1 |
0 |
10 |
COMMERCIAL |
16.38 |
4 |
0 |
11 |
COMMERCIAL |
15.83 |
2 |
0 |
12 |
COMMERCIAL |
12.70 |
1 |
0 |
13 |
COMMERCIAL |
15.61 |
1 |
0 |
14 |
1 BHK FLAT |
27.87 |
14 |
0 |
15 |
2 BHK FLAT |
41.31 |
4 |
1 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
0
|
2
|
X number of Basement(s) and Plinth
|
0
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
0
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
0
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
0
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
0
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
0
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
0
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
3 |
TULSI AAHAN
|
WINB C
|
31/12/2019
|
0
|
1
|
0
|
8
|
1 |
0 |
10 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2 BHK FLAT |
34.37 |
4 |
3 |
2 |
1 BHK FLAT |
28.44 |
4 |
3 |
3 |
2 BHK FLAT |
41.99 |
4 |
2 |
4 |
1 BHK FLAT |
27.58 |
4 |
3 |
5 |
1 BHK FLAT |
27.69 |
8 |
3 |
6 |
2 BHK FLAT |
38.84 |
3 |
2 |
7 |
1 BHK FLAT |
28.73 |
3 |
2 |
8 |
1 BHK FLAT |
29.20 |
3 |
1 |
9 |
1 BHK FLAT |
28.90 |
3 |
0 |
10 |
1 BHK FLAT |
30.85 |
3 |
1 |
11 |
1 BHK FLAT |
29.190 |
3 |
1 |
12 |
COMMERCIAL |
12.620 |
1 |
0 |
13 |
COMMERCIAL |
10.130 |
1 |
0 |
14 |
COMMERCIAL |
16.600 |
1 |
0 |
15 |
COMMERCIAL |
10.900 |
1 |
1 |
16 |
COMMERCIAL |
13.580 |
1 |
0 |
17 |
COMMERCIAL |
17.930 |
1 |
0 |
18 |
COMMERCIAL |
10.840 |
1 |
0 |
19 |
COMMERCIAL |
10.570 |
1 |
0 |
20 |
COMMERCIAL |
15.640 |
1 |
0 |
21 |
COMMERCIAL |
9.330 |
1 |
0 |
22 |
COMMERCIAL |
9.030 |
2 |
0 |
23 |
COMMERCIAL |
11.250 |
3 |
0 |
24 |
COMMERCIAL |
13.580 |
1 |
0 |
25 |
1 BHK FLAT |
31.89 |
8 |
4 |
26 |
1 BHK FLAT |
28.92 |
3 |
1 |
27 |
2 BHK FLAT |
42.57 |
3 |
2 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
100
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
4 |
TULSI AAHAN
|
WING D
|
31/12/2019
|
0
|
1
|
0
|
8
|
1 |
0 |
19 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 BHK FLAT |
28.27 |
8 |
0 |
2 |
1 BHK FLAT |
28.90 |
18 |
0 |
3 |
1 BHK FLAT |
28.730 |
6 |
0 |
4 |
COMMERCIAL |
11.250 |
1 |
0 |
5 |
COMMERCIAL |
9.030 |
1 |
0 |
6 |
COMMERCIAL |
15.230 |
4 |
2 |
7 |
COMMERCIAL |
8.370 |
2 |
2 |
8 |
COMMERCIAL |
10.430 |
2 |
2 |
9 |
COMMERCIAL |
8.150 |
1 |
0 |
10 |
COMMERCIAL |
10.160 |
1 |
0 |
11 |
1 BHK FLAT |
28.44 |
24 |
2 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
100
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
5 |
TULSI AAHAN
|
WING E
|
31/12/2019
|
0
|
1
|
0
|
8
|
1 |
0 |
10 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 BHK FLAT |
28.44 |
16 |
2 |
2 |
1 BHK FLAT |
28.27 |
8 |
4 |
3 |
1 BHK FLAT |
28.14 |
8 |
2 |
4 |
1 BHK FLAT |
28.90 |
12 |
2 |
5 |
1 BHK FLAT |
28.73 |
6 |
1 |
6 |
1 BHK FLAT |
28.60 |
6 |
0 |
7 |
COMMERCIAL |
7.140 |
1 |
0 |
8 |
COMMERCIAL |
11.940 |
6 |
2 |
9 |
COMMERCIAL |
9.580 |
2 |
0 |
10 |
COMMERCIAL |
5.730 |
1 |
1 |
11 |
COMMERCIAL |
8.280 |
1 |
0 |
12 |
COMMERCIAL |
8.380 |
1 |
0 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
100
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
6 |
TULSI AAHAN
|
WING F
|
31/12/2019
|
0
|
1
|
0
|
8
|
1 |
0 |
10 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 BHK FLAT |
28.44 |
8 |
0 |
2 |
1 BHK FLAT |
28.270 |
4 |
1 |
3 |
2 BHK FLAT |
44.690 |
4 |
3 |
4 |
1 BHK FLAT |
28.90 |
6 |
0 |
5 |
1 BHK FLAT |
28.730 |
3 |
0 |
6 |
2 BHK FLAT |
42 |
3 |
1 |
7 |
1 BHK FLAT |
28.59 |
6 |
0 |
8 |
COMMERCIAL |
7.140 |
1 |
0 |
9 |
COMMERCIAL |
5.730 |
1 |
0 |
10 |
1 BHK FLAT |
27.450 |
8 |
2 |
11 |
COMMERCIAL |
11.940 |
4 |
1 |
12 |
COMMERCIAL |
9.580 |
1 |
0 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
100
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|
Sr.No. |
Project Name
|
Name (Also mention identification of building/wing/other as per approved plan)
|
Proposed Date of Completion
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Sanctioned Floors
|
Number of Stilts
|
Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler)
|
Number of Closed Parking
|
7 |
TULSI AAHAN
|
WING G
|
31/12/2019
|
0
|
1
|
0
|
8
|
1 |
0 |
24 |
|
|
Sr.No.
|
Apartment Type
|
Carpet Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
2 BHK FLAT |
41.76 |
8 |
1 |
2 |
1 BHK FLAT |
29.460 |
4 |
0 |
3 |
1 BHK FLAT |
30.230 |
4 |
0 |
4 |
2 BHK FLAT |
40.160 |
4 |
3 |
5 |
1 BHK FLAT |
28.44 |
8 |
0 |
6 |
1 BHK FLAT |
30.24 |
4 |
0 |
7 |
2 BHK FLAT |
42.230 |
6 |
1 |
8 |
1 BHK FLAT |
29.950 |
3 |
0 |
9 |
1 BHK FLAT |
29.860 |
3 |
0 |
10 |
2 BHK FLAT |
37.460 |
3 |
2 |
11 |
1 BHK FLAT |
28.90 |
6 |
0 |
12 |
1 BHK FLAT |
30.51 |
3 |
0 |
|
|
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
100
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
90
|
|