MahaRERA Application

General Information

Other Than Individual

Organization

Lashkaria Housing & Infrastructure Private Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

Gr. & 1st Floor
Lashkaria Anurag
J. P. road, Model Town
Four Bungalow,
Near Versova Metro Station
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400053

Organization Contact Details

02226367867
www.lashkariagroup.com

Past Experience Details

Member Information

Member Name Designation Photo
Imran Aslam Lashkaria Managing Director View Photo
Arshad Aslam Lashkaria Managing Director View Photo
Aslam Yasin Lashkaria Authorized Signatory View Photo
Vaseem Aslam Lashkaria Managing Director View Photo

Project

LASHKARIA PEARL
New Project
01/11/2025
No
Residential
No
CTS NO 325 325/1 326
327
324-1
CTS NO 321-10 286
203 - 568
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
Village Oshiwara, Opp Parsi Colony, Behraum Baug
Jogeshwari West
400102
2536.10
1
1
0
0

FSI Details

10144.4
0
10144.40

Bank Details

Axis Bank
UTIB0002776

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 40 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 Will be done at later Stage
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 Shall be Provided before OC
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Shall be provided before OC
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 Will be supplied by MCGM
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Septic Tank & STP not required
Storm Water Drains : YES 0 Shall be provided before OC
Landscaping & Tree Planting : NO 0 NA
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Will be connected by MCGM
Solid Waste Management And Disposal : YES 0 Will be connected by MCGM

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 LASHKARIA PEARL A and B Wing 01/11/2024 0 1 2 21 1 0 40
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 A WING 1 BHK 35.91 2 1
2 A WING 1 BHK 35.81 2 1
3 SHOP B WING 18.63 1 1
4 SHOP B WING 22.51 1 0
5 A WING 1 BHK 47.13 1 0
6 A WING 1 BHK 43.47 1 0
7 A WING 1 BHK 38.84 1 0
8 A WING 1 BHK 40.35 1 0
9 A WING 1 BHK 35.77 1 0
10 A WING 1 BHK 48.85 1 1
11 SHOP B WING 10.59 1 1
12 SHOP B WING 17.09 2 2
13 SHOP B WING 13.56 2 2
14 B WING 1 BHK 34.85 1 0
15 B WING 1 BHK 37.55 1 0
16 B WING 1 BHK 42.19 1 0
17 SHOP B WING 62.51 1 0
18 B WING 1 BHK 31.02 41 27
19 B WING 1 BHK 30.59 40 21
20 B WING 1 BHK 32.62 38 29
21 A WING 1 BHK 30.89 19 15
22 A WING 1 BHK 30.93 18 14
23 A WING 1 BHK 31.02 38 35
24 A WING 1 BHK 32.62 38 26
25 A WING 1 BHK 33.54 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 40

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Point to Point Architects & Consultants NA Architect
Patel Palkar & Associates LLP Chartered Accounts NA Chartered Accountant
Milin Modi NA Engineer
Sura & Associates NA Other Professional
SK Enterprises NA Contractor

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
5 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement