MahaRERA Application

General Information

Individual

Individual

ANIL
HARDASMAL
THARWANI
HARDASMAL HAZARIMAL THARWANI
Yes

Address For Official Communication

SHOP NO 1 TO 10
THARWANI SOLITAIRE WING NATALI
KALYAN MURBAD ROAD
MHARAL
NEAR CENTURY RAYON
MAHARASHTRA
Konkan
Thane
Kalyan
Mharal Kh. (N.V)
421301

Contact Details

02512281030
www.tharwanirealty.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1ROSEWOOD HEIGHTSResidentialNA8749.71PLOT NO 270 SECTOR 10 KHARGHAR NAVI MUMBAIPLOT NO 27052342012-03-132012-03-13
2RIVERDALE VISTAResidentialNA12715SURVEY NO 25 HISSA NO 1 VILLAGE BARAVE TALUKA KALYANSURVEY NO 25 HISSA NO 131882016-09-292016-09-29
3THARWANI ARIANA PHASE IResidentialNA4460SURVEY NO 133 1 AND 133 P VILLAGE CHIKHLOLI TALUKA AMBERNATHSURVEY NO 133 1 AND 133 P VILLAGE CHIKHLOLI TALUKA AMBERNATH72382016-12-312016-12-31

Project

THARWANI MAJESTIC TOWERS PHASE II
New Project
30/12/2026
No
Residential
No
4A/1 4A/2 4A/3 4A/4 4A/5 4B/1 4B/2 25A/1 25A/2 26A
SEASONS AVENUE
15 METER WIDE DP ROAD
SURVEY NO 26
30 METER WIDE DP ROAD
MAHARASHTRA
Konkan
Thane
Kalyan
Kalyan-Dombivali (M Corp.)
JHULELAL CHOWK
KALYAN
421301
7500
1
1
0
3377.74

FSI Details

7558.03
2591.71
10149.74

Details of RERA Designated Separate Bank Account

BANK OF BARODA
BARB0KHADAK

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 464 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 AT THE TIME OF COMPLETION
Energy management : YES 0 PROPOSED
Fire Protection And Fire Safety Requirements : YES 0 AT THE TIME OF COMPLETION
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 AT THE TIME OF COMPLETION
Aggregate area of recreational Open Space : YES 0 3377.74 SQ. M. PROPOSED
Open Parking : YES 0 PROPOSED
Water Supply : YES 0 AT THE TIME OF COMPLETION
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 STP PROPOSED
Storm Water Drains : YES 0 AT THE TIME OF COMPLETION
Landscaping & Tree Planting : YES 0 PROPOSED
Street Lighting : YES 0 PROPOSED
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 AT THE TIME OF COMPLETION
Solid Waste Management And Disposal : YES 0 ORGANIC WASTER COMPOSER PROPOSED

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 THARWANI MAJESTIC TOWERS PHASE II ESTRELLA 31/12/2025 0 1 4 39 1 0 464
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Office space 84.39 1 0
2 Shop 22.93 1 1
3 3BHK 90.28 39 5
4 3BHK 92.13 39 12
5 Office space 23.83 1 0
6 Shop 23.86 1 1
7 Office space 27.72 1 0
8 Office space 28.53 1 0
9 3BHK 90.77 39 7
10 Shop 28.28 1 1
11 3BHK 96.6 39 0
12 Shop 49.8 1 0
13 Shop 27.92 1 1
14 Office space 22.73 1 0
15 Office space 36.87 1 0
16 3BHK 96.07 39 13
17 Office space 29.99 1 0
18 Office space 27.99 1 0
19 Office space 31.96 1 0
20 3BHK 99.16 39 3
21 Shop 35.15 1 0
22 Office space 30.37 1 0
23 Shop 29.58 1 1
24 Shop 26.02 1 1
25 Shop 32.55 1 0
26 Office space 21.83 1 0
27 Shop 28.46 1 1
28 Office space 49.26 1 0
29 Shop 34.71 1 0
30 Shop 42.85 1 0
31 Shop 30.03 1 0
32 Shop 21.83 1 1
33 Shop 33.51 1 1
34 Shop 28.83 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 80
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 28

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
MAHAN BUILDCON NA Contractor
DECON CONSULTANT ARCHITECT INTERIOR AND DESIGNERS REGD VALUES AND PROJECT CONSULTANT NA Architect
EPICON CONSULTANTS NA Engineer
SUNNY BHAGIA AND ASSOCIATES NA Chartered Accountant

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 a Details of encumbrances concerned to Finance
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
4 Building Plan Approval / NA Order for plotted development
5 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
12 Architect’s Certificate of Percentage of Completion of Work (Form 1)
13 Architect’s Certificate of Percentage of Completion of Work (Form 1)
14 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
11 Engineer’s Certificate on Cost Incurred on Project (Form 2)
12 Engineer’s Certificate on Cost Incurred on Project (Form 2)
13 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)
1 Proforma of Agreement for sale
2 Proforma of Agreement for sale
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement
1 Other – Legal
1 Other – Finance
1 Other – Technical