MahaRERA Application

General Information

Other Than Individual

Organization

Gagan Landmarks LLP
Partnership
NA
Do you have any Past Experience ?
No

Address Details

Office No-301
Marvel Alaina
Lane No-5
Koregaon Park
Above Kargo Restaurant
MAHARASHTRA
Pune
Pune
Haveli
KOREGAON PARK
411001

Organization Contact Details

02026153031

Past Experience Details

Member Information

Member Name Designation Photo
Rahul Sureshchand Garg Authorized Signatory View Photo
Rohit Sureshchand Garg Partner View Photo

Project

Gagan Ela
On-Going Project
31/12/2020
31/12/2020
31/03/2024
Yes
Others
Yes
23/7/1, 23/7/2, 23/7/3 P
S no 23
S No 23
S No 24
Road
MAHARASHTRA
Pune
Pune
Haveli
MOHAMMADWADI
NIBM Road
Mohammadwadi
411060
9098.33
3
3
0
873.61

FSI Details

4927.95
10532.47
15460.42

Bank Details

HDFC Bank
HDFC0002054

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Gagan Ela Rahul Mahajan Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Gagan Ela Rohit Mahajan Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Gagan Ela Sonam Mahajan Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Gagan Ela Interstellar Developers LLP Partnership Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Gagan Ela Quadra Infra Partnership Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Gagan Ela Nirman Bharti Lifestyle Homes Partnership Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Upload Agreement / MoU Copy
3 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 296 25 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 40 After the completion of A and B wings
Water Conservation, Rain water Harvesting : YES 60 After the completion of A and B wings
Energy management : YES 5 After the completion of A and B wings
Fire Protection And Fire Safety Requirements : YES 5 After the completion of A and B wings
Electrical Meter Room, Sub-Station, Receiving Station : YES 5 After the completion of A and B wings
Aggregate area of recreational Open Space : YES 0 After the completion of A and B wings
Open Parking : NO 0 NA
Water Supply : YES 0 After the completion of A and B wings
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 80 After the completion of A and B wings
Storm Water Drains : YES 85 After the completion of A and B wings
Landscaping & Tree Planting : YES 5 After the completion of A and B wings
Street Lighting : YES 0 After the completion of A and B wings
Community Buildings : YES 50 After the completion of A and B wings
Treatment And Disposal Of Sewage And Sullage Water : YES 75 After the completion of A and B wings
Solid Waste Management And Disposal : YES 0 After the completion of A and B wings

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Gagan Ela A 30/06/2022 0 1 2 17 1 0 128
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 61.48 2 2
2 2 BHK 53.49 1 1
3 2 BHK 53.95 1 1
4 Pent House 75.24 2 2
5 2BHK 54.60 4 3
6 2BHK 56.55 6 6
7 2 BHK 54.27 5 3
8 2 BHK 54.55 3 3
9 2BHK 55.00 3 3
10 Pent House 70.76 1 1
11 2BHK 55.02 6 6
12 2BHK 61.81 13 13
13 2 BHK 56.54 7 5
14 2BHK 55.08 4 3
15 Pent House 76.73 1 1
16 2BHK 55.06 4 4
17 2 BHK 61.46 2 2
18 2 BHK 54.55 3 3
19 2BHK 56.72 6 6
20 2BHK 60.61 6 6
21 2BHK 61.99 15 15
22 2BHK 60.51 7 7
23 Pent house 69.97 2 1
24 Pent House 71.24 1 1
25 Pent House 71.21 1 00
26 2 BHK 59.30 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 63
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 88
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

72
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 18
11 Overall Percentage of Completion of the work done For the entire Building /Wing 74.1
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Gagan Ela B 30/06/2022 0 1 2 17 1 0 128
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 83.28 10 10
2 3BHK 79.93 10 10
3 3BHK 81.23 4 4
4 3BHK 81.27 7 1
5 3 BHK 90.70 5 0
6 3 BHK 94.63 6 1
7 3 BHK 82.82 8 8
8 3 BHK 82.81 8 8
9 3 BHK 90.90 5 3
10 3BHK 91.18 14 14
11 Pent House 112.00 1 1
12 3 BHK 79.97 1 1
13 3 BHK 78.94 1 1
14 Pent House 117.01 1 00
15 Pent House 124.99 1 00
16 Pent House 113.29 1 00
17 3BHK 91.38 6 3
18 3BHK 79.92 6 3
19 3 BHK 96.65 5 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 34
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 85
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

42
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 15
11 Overall Percentage of Completion of the work done For the entire Building /Wing 67.6
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Gagan Ela Commercial and MHADA 30/06/2022 1 1 0 9 0 0 40
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 37.48 2 2
2 SHOP 45.17 1 1
3 SHOP 46.07 1 1
4 SHOP 46.88 1 1
5 SHOP 14.62 1 0
6 SHOP 22.33 3 2
7 SHOP 22.51 5 5
8 SHOP 14.96 1 0
9 1BHK 36.96 2 0
10 1BHK 37.10 1 0
11 1BHK 37.02 1 0
12 1BHK 37.02 1 0
13 1BHK 37.02 1 0
14 1BHK 38.60 1 0
15 SHOP 22.28 2 2
16 SHOP 37.50 2 1
17 SHOP 37.57 1 1
18 SHOP 38.92 1 1
19 SHOP 45.15 1 1
20 SHOP 20.72 1 1
21 SHOP 20.82 1 1
22 SHOP 17.96 1 1
23 SHOP 20.51 1 1
24 SHOP 20.70 2 1
25 1RK 34.94 3 0
26 SHOP 47.42 1 1
27 SHOP 14.63 1 1
28 SHOP 15.92 2 2
29 SHOP 15.93 1 1
30 1RK 28.92 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 98
11 Overall Percentage of Completion of the work done For the entire Building /Wing 79.8

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Mr.Nitin Kamathe NA Contractor
Mr.Janardhan Ghule NA Contractor
Mr.Sachin Bhangire NA Contractor
Mr.Kishor Khetwat NA Contractor
Mr.Ghule NA Contractor
Mr.Ramu Chavan NA Contractor
Mr. Soudagar NA Contractor
Mr.Ghansham NA Contractor
Mr.Gurudatta NA Contractor
Mr.Shekhar Tamhane NA Contractor
Mr.Rahul Malvadkar NA Architect
Mr.Rajesh Mankani NA Engineer
ASHISH MODI a52100003744 Real Estate Agent
Parag Madhukar Kamble a52100008547 Real Estate Agent
Rajan Gautam a52100002559 Real Estate Agent
PRERANA VENTURES LLP a52100001056 Real Estate Agent
Paresh Lachman Hardwani a52100000163 Real Estate Agent
KUTUBUDDIN GULAMALI KHUMANPURWALA a52100001370 Real Estate Agent
HUSAIN KUTUBUDDIN KHUMANPURWALA a52100000789 Real Estate Agent
Kirankumar Tarachand Chopda A52100002190 Real Estate Agent
EstateMint Pvt Ltd A52100004278 Real Estate Agent
VIKAS SATISH GUPTA A52100002607 Real Estate Agent
Addressofchoice Realty Pvt Ltd A52100000116 Real Estate Agent
Premlata Estate Solutions Pvt. Ltd. A52100000033 Real Estate Agent
Thomas C Abraham A52100000927 Real Estate Agent
Kirankumar Tarachand Chopda A52100002190 Real Estate Agent
MINT LIFESPACES A52100007639 Real Estate Agent
Bhisham Suresh Parwani A52100007974 Real Estate Agent
Signet Space Realty Private Limited A52100007915 Real Estate Agent
OPTIMUS REALTORS A52100000310 Real Estate Agent
AKASH AMOLOKCHAND KHATER A52100006171 Real Estate Agent
Amit Surendra Partani a52100003300 Real Estate Agent
AMIT ARVIND SODANI A52100001140 Real Estate Agent
Bluenest Properties LLP A52100007204 Real Estate Agent
AJAYPALSINGH HARPALSINGH HOONJAN a52100003146 Real Estate Agent
taher zakir tailor a52100004561 Real Estate Agent
Amit Surendra Partani a52100003300 Real Estate Agent
ASFAQUE AHMED SAYYED a52100011831 Real Estate Agent
RAVIRAJ GANGAPRASAD THANVI A52100007495 Real Estate Agent
INVESTADVISE WEALTH MANAGEMENT PRIVATE LIMITED A52100002914 Real Estate Agent
MURTAZA HUSAINI HATHAIWALA a52100012881 Real Estate Agent
Thomas C Abraham a52100000927 Real Estate Agent
Mustafa Mufazzal kachwala a52100013856 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
Gagan Ela Civil Judge Junior Division Pune RCS No 1945 Civil No Suit NA 2018 Awaiting Summons
NA
Gagan Ela Civil Judge Senior Division Pune 261 Civil No Suit NA 2019 Awaiting Summons
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
3 Details of encumbrances
4 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
7 Building Plan Approval (IOD)
8 Building Plan Approval (IOD)
9 Building Plan Approval (IOD)
10 Building Plan Approval (IOD)
11 Building Plan Approval (IOD)
12 Building Plan Approval (IOD)
13 Building Plan Approval (IOD)
14 Building Plan Approval (IOD)
15 Building Plan Approval (IOD)
16 Building Plan Approval (IOD)
17 Building Plan Approval (IOD)
18 Building Plan Approval (IOD)
19 Building Plan Approval (IOD)
20 Building Plan Approval (IOD)
21 Building Plan Approval (IOD)
22 Building Plan Approval (IOD)
23 Building Plan Approval (IOD)
24 Building Plan Approval (IOD)
25 Building Plan Approval (IOD)
26 Building Plan Approval (IOD)
27 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
5 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
2 Declaration about Commencement Certificate
1 Declaration in FORM B
2 Declaration in FORM B
3 Declaration in FORM B
4 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
27 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
28 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
29 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC005000000075187 Makarand Patil View Orders
2 CC005000000238699 Sameer Nasir Momin View Orders