MahaRERA Application

General Information

Other Than Individual

Organization

Topaz Homes LLP
Partnership
NA
Do you have any Past Experience ?
No

Address Details

Office No 301
Marvel Alaina
Lane no 5
Koregaon Park
Above Kargo Restaurant
MAHARASHTRA
Pune
Pune
Haveli
KOREGAON PARK
411001

Organization Contact Details

02026153031

Past Experience Details

Member Information

Member Name Designation Photo
Anshul Naresh Garg Authorized Signatory View Photo
Rohit Sureshchand Garg Partner View Photo
Rahul Sureshchand Garg Partner View Photo
Naresh Suganchand Garg Partner View Photo
Anita Ramesh Goryantal Partner View Photo
Somesh Ramnivas Gupta Partner View Photo
Anuj Rajesh Agarwal Partner View Photo
Naman Rajesh Garg Partner View Photo

Project

Gagan Adira Phase 1
On-Going Project
30/06/2020
30/12/2020
30/06/2022
Yes
Others
Yes
569 Plot no A/1,2,3,4,5
Road
Gat No 569P
Gat No 568 566 240 241
Gat No 571
MAHARASHTRA
Pune
Pune
Haveli
WAGHOLI
Nagar Road
Wagholi
412207
22198
4
4
0
4010.65

FSI Details

26814.51
0
26814.51

Bank Details

HDFC Bank
HDFC0000007

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Gagan Adira Phase 1 Nirmaladevi Satav Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 204 101 25

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 After the completion of Drainage
Water Conservation, Rain water Harvesting : YES 0 Proposed in phase 2
Energy management : YES 0 After completion of Main Building
Fire Protection And Fire Safety Requirements : YES 0 Parallely with the main building
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 After completion of Main Building
Aggregate area of recreational Open Space : YES 0 After completion of Main Building
Open Parking : NO 0 After completion of Main Building
Water Supply : YES 0 After the completion of Drainage
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 After the completion of Drainage
Storm Water Drains : YES 0 Sewage and water
Landscaping & Tree Planting : YES 0 After the completion of Drainage
Street Lighting : YES 0 After completion of Main Building
Community Buildings : YES 0 After completion of Main Building
Treatment And Disposal Of Sewage And Sullage Water : YES 0 After completion of Main Building
Solid Waste Management And Disposal : YES 0 Along with main building construction

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Gagan Adira Phase 1 A 30/12/2021 1 1 0 17 1 0 48
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 53.97 4 4
2 3 BHK 71.61 5 4
3 3 BHK 71.65 3 4
4 3 BHK 74.10 5 5
5 Shop 26.30 1 0
6 Shop 24.44 1 0
7 Shop 30.02 1 1
8 1BHK RF 43.19 1 0
9 2 BHK 72.55 1 1
10 Shop 30.30 2 1
11 3 BHK 73.77 3 3
12 Shop 25.43 1 1
13 2 BHK 62.35 1 1
14 2 BHK 63.17 6 6
15 2BHK 53.76 1 1
16 Shop 23.62 1 1
17 Shop 32.89 1 1
18 Shop 51.16 1 1
19 2 BHK 53.93 4 1
20 Shop 24.07 1 0
21 2BHK 53.50 9 8
22 2 BHK 57.98 10 10
23 2 BHK 52.41 2 2
24 2 BHK 87.14 5 5
25 2 BHK 51.15 1 1
26 Shop 27.74 1 1
27 Shop 31.70 1 1
28 2 BHK 62.25 1 1
29 2 BHK 52 4 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 93
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 40
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 18
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 52
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

28
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 63.1
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Gagan Adira Phase 1 B 30/12/2021 1 1 0 17 1 0 48
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 30.30 2 0
2 2BHK 62.24 1 1
3 2BHK 62.25 2 2
4 1 BHK RF 43.19 1 0
5 Shop 24.07 1 0
6 Shop 27.09 1 0
7 Shop 23.37 1 0
8 Shop 25.56 1 0
9 2 BHK 53.50 7 6
10 2 BHK 52.00 5 4
11 2 BHK 53.93 4 4
12 2 BHK 52.41 1 1
13 2 BHK 57.98 10 10
14 3 BHK 71.65 1 1
15 3 BHK 74.10 5 5
16 Shop 50.74 1 1
17 Shop 27.74 1 1
18 Shop 31.70 1 0
19 2BHK 62.34 1 1
20 2BHK 63.17 12 12
21 3BHK 70.24 1 1
22 3BHK 70.34 1 1
23 3BHK 87.14 6 6
24 Shop 30.02 1 0
25 Shop 34.37 1 1
26 3 BHK 71.61 5 5
27 2BHK 72.53 2 2
28 3BHK 73.77 1 1
29 Shop 32.89 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 48
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 20
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 58
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

31
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 65.7
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Gagan Adira Phase 1 C 30/12/2021 1 1 0 17 1 0 33
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 35.72 1 0
2 Shop 30.92 1 0
3 2BHK 69.63 1 0
4 2BHK 69.90 1 0
5 2BHK 48.38 5 5
6 2BHK 48.46 11 11
7 2BHK 48.60 6 6
8 2BHK 48.80 6 6
9 2BHK 48.58 15 12
10 Shop 39.14 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 44
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 15
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 80
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

43
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 58.2
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 Gagan Adira Phase 1 D 30/12/2021 1 1 0 17 1 0 48
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 BHK 49.02 1 1
2 3 BHK 64.19 1 1
3 3 BHK 66.66 1 1
4 3 BHK 61.69 4 4
5 3BHK 71.61 3 3
6 3BHK 77.11 4 4
7 3BHK 78.04 2 2
8 Shop 26.70 1 0
9 Shop 26.78 1 0
10 Shop 27.41 1 1
11 Shop 32.16 1 0
12 Shop 38.40 1 0
13 Shop 52.03 1 0
14 Shop 52.15 1 0
15 3 BHK 62.04 1 1
16 2 BHK 50.99 5 5
17 2 BHK 55.02 5 5
18 3 BHK 63.76 2 2
19 Shop 38.60 1 0
20 Shop 46.81 1 0
21 3BHK 68.67 6 5
22 1 BHK 43.29 1 0
23 2 BHK 55.10 2 2
24 2 BHK 51.04 4 4
25 3BHK 68.88 5 5
26 3 BHK 63.56 6 6
27 3BHK 65.05 8 8
28 3BHK 71.66 5 5
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 35
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 11
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

48
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 56.4

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Mukesh Satav NA Contractor
Mr. Soudagar NA Contractor
Mr.Paras Kushwah NA Contractor
Mr. Asif Sayyed NA Contractor
Mr.Satish Joshi NA Contractor
Mr. Mukesh Sharma NA Contractor
Mr. Tambe NA Contractor
Mr. Sagar Vora NA Contractor
Mr. Nagtilak NA Contractor
Mr. Chavan NA Contractor
Mr Pravin NA Contractor
Mr.Shrivastava NA Contractor
Mr Rajesh Mankani NA Engineer
Mr.Rahul Malvadkar NA Architect
Abhay Motilal Bhurat A52100001258 Real Estate Agent
Jiten Ashok Gore A52100009314 Real Estate Agent
Sanjay Haribhau Gargate A52100001552 Real Estate Agent
VIKAS SATISH GUPTA A52100002607 Real Estate Agent
Addressofchoice Realty Pvt Ltd A52100000116 Real Estate Agent
Premlata Estate Solutions Pvt. Ltd. A52100000033 Real Estate Agent
Thomas C Abraham A52100000927 Real Estate Agent
Kirankumar Tarachand Chopda A52100002190 Real Estate Agent
MINT LIFESPACES A52100007639 Real Estate Agent
Bhisham Suresh Parwani A52100007974 Real Estate Agent
Signet Space Realty Private Limited A52100007915 Real Estate Agent
OPTIMUS REALTORS A52100000310 Real Estate Agent
AKASH AMOLOKCHAND KHATER A52100006171 Real Estate Agent
AMIT ARVIND SODANI A52100001140 Real Estate Agent
Bluenest Properties LLP A52100007204 Real Estate Agent
Dhruba Prasad Gupta A52100010221 Real Estate Agent
Saroj Vinod Jain a52100008304 Real Estate Agent
Darshana Rohan Bhansali a52100011874 Real Estate Agent
Rahul Shivaji Patil A52100013708 Real Estate Agent

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
Gagan Adira Phase 1 CIVIL JUDGE JUNIOR DIVISION PUNE AT PUNE HONBLE G R PATIL COURT 6929/2012 Civil No Suit NA 2012 Awating Summons
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
7 Building Plan Approval (IOD)
8 Building Plan Approval (IOD)
9 Building Plan Approval (IOD)
10 Building Plan Approval (IOD)
11 Building Plan Approval (IOD)
12 Building Plan Approval (IOD)
13 Building Plan Approval (IOD)
14 Building Plan Approval (IOD)
15 Building Plan Approval (IOD)
16 Building Plan Approval (IOD)
17 Building Plan Approval (IOD)
18 Building Plan Approval (IOD)
19 Building Plan Approval (IOD)
20 Building Plan Approval (IOD)
21 Building Plan Approval (IOD)
22 Building Plan Approval (IOD)
23 Building Plan Approval (IOD)
24 Building Plan Approval (IOD)
25 Building Plan Approval (IOD)
26 Building Plan Approval (IOD)
27 Building Plan Approval (IOD)
28 Building Plan Approval (IOD)
29 Building Plan Approval (IOD)
30 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
2 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
1 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
3 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
2 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC005000000085530 Anish Sanjay Law View Orders
2 CC005000000085569 Manish Bhattacharya View Orders
3 CC005000000085497 Kalpesh Prabhakar Chaudhari View Orders
4 CC005000000085544 Possession not given View Orders