MahaRERA Application

General Information

Other Than Individual

Organization

Vaichal Constructions Pvt Ltd
Company
NA
Do you have any Past Experience ?
Yes

Address Details

1
Ideal Chambers
Poud Road
8 Ideal Colony
-
MAHARASHTRA
Pune
Pune
Haveli
Kothrud
411038

Organization Contact Details

02025465003

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1KalpaVruksha BResidentialNA3680Gat No. 577 Kasaramboli Taluka Mulshi Pune5771622018-12-312019-03-31

Member Information

Member Name Designation Photo
Sanjay Vasant Vaichal Managing Director View Photo
Shantanu Sanjay Vaichal Authorized Signatory View Photo

Project

KalpaVruksha C
New Project
30/12/2023
Yes
Residential
No
Gat No. 577
land out of gat no 578
land out of gat no 582
land out of gat no 578
land out of gat no 577 with 30 ft internal road
MAHARASHTRA
Pune
Pune
Mulshi
Kasar Amboli
-
-
412108
2240
1
1
0
800

FSI Details

1474.05
0
1474.05

Bank Details

Bank of Baroda
BARB0SHIPOO

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 11 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 For Building C alone
Water Conservation, Rain water Harvesting : NO 0 no footpaths
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 As per norms
Aggregate area of recreational Open Space : YES 80 Common infrastructure for layout completed
Open Parking : YES 0 For complete layout
Water Supply : YES 0 For Building C
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 For Building C
Storm Water Drains : YES 0 Septic Tank
Landscaping & Tree Planting : YES 0 For Building C
Street Lighting : YES 0 Common for layout
Community Buildings : YES 80 For Building C
Treatment And Disposal Of Sewage And Sullage Water : NO 0 Common for layout
Solid Waste Management And Disposal : NO 0 For Building C

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 KalpaVruksha C KalpaVruksha C 31/12/2022 0 1 0 8 1 0 11
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK A 51.59 8 0
2 2 BHK B 51.97 8 0
3 2 BHK C 51.65 4 0
4 2 BHK D 60.29 1 0
5 1 BHK A 40.4 4 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Shirish Satbhai NA Architect

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
KalpaVruksha C Civil Court District Court Pune 1426 Civil No Suit NA 2012 Pending
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Form 2A
2 Form 2A
3 Form 2A
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement